1 [12-Feb-2014] «BE-RF-PM» CLIC TBM Prototype Status update EDMS №[Number] Dmitry Gudkov 1.

Slides:



Advertisements
Similar presentations
1 [16-October-2013] [CMWG Meeting] «BE-RF-PM» TBM T0 MBQ TBM T0 MBQ DB SS MB SS TBM T0 MBQ DB SS MB SS MBQ in CLEX Option 1a: MBQ is installed upstream.
Advertisements

ENSEMBLE BLINDAGE TED. PROCEDURE DE DEMONTAGE DU TED.
Collaboration K. Artoos, CTC 8th February 2011 Active Structures Laboratory Department of Mechanical Engineering and Robotics Université Libre de Bruxelles.
Daniel Schoerling TE-MSC-MNC 1 Review of AD-ELENA TL dipole Daniel Schoerling on behalf of WP 2.2 ELENA IIC meeting 27 th February 2014.
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Pt5 - RadWG meeting Presenting a concept Prepared by M Gastal & S Maridor
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
Compressor status AWAKE Technical Board meeting 19 May 2015.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
1 ACTIONS: Ashley French TASK STATUSCOMMENTS 1. Contact Berthet-SergeFuture 12/11/10 2. Contact Serge Mothot & Said Atieh (CERN Workshop) Future 12/11/10.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
New test structures: Status report and technical documentation review
«BE-RF-PM» Updates on thermal tests for CLIC prototype module type 0 Ioannis Kossyvakis, Roberto Mondello, Fabrizio Rossi.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
Barriere O, Le Roux P
Neutrino Platform Workpackages discussion EN-MEF-SU 17 September 2015 Beynel, Gayde, Mergelkuhl, Troillet EN/MEF-SU.
Dmitry Gudkov BE/RF/PM CLIC Module Working Group PROTOTYPE TWO-BEAM MODULES (CLEX) Supporting and positioning system for CLEX modules main conclusions.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
DBQ support – motorization and performance upgrade Mateusz Sosin EN/MEF-SU.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
CLEX TBM T0 Cooling system Progress Report 1 V. Soldatov, A. Vamvakas, BE-RF
Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
1962 First CMM DEA (Italy) Ahmed CHERIF CERN Metrology lab. CLIC TECHNICAL COMMITTEE – EDMS : EDMS :
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Short range alignment strategy in CLEX and first results CLIC Workshop January 2015 on behalf of : Hélène Mainaud-Durand, Mateusz Sosin Mathieu.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
Update of master schedule and report from SLAC G. Riddone
ELENA Project GBAR Experimental area L ayout / time scales / questions F. Butin / ELENA collaboration.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
CLIC two-beam modules TEST modules final schemes Dmitry Gudkov BE/RF CLIC Module Working Group.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 July 17,
CLIC module Experimental program for module array Module review, June 22 nd 2015Elena Daskalaki, BE-RF-MK.
TBTS Test Program & Schedule G. Riddone
1 07-Oct-2012 «BE-RF-PM» Experiments on the Material Samples of the CLIC Two-Beam Module Supporting System: PHASE 2 Nick Gazis 1.
INTERFACES MANAGEMENT CRYOMODULES Vincent HENNION SYSTEM ENGINEERING ACTIVITIES.
Procurement for the Supporting Systems
CLEX TBM T0 Cooling system Design strategy 1 V. Soldatov, A. Vamvakas, BE-RF
Integration of CLIC TBM in CLEX Electronics allocation and cables tracing Wilfrid Farabolini (CEA/IRFU) 16 October 2013.
Beam Wire Scanner for PS/SPS/PSB Current status and Schedule Dmitry Gudkov BE-BI-ML.
1 [24-July-2013] [CMWG] «BE-RF-PM» CLIC TBM Prototypes Status EDMS №[Number] Dmitry Gudkov 1.
Dmitry Gudkov BE/RF CLIC Module Working Group Test Module Type 1 (LAB). Design and integration. 3D model Ref: ST
Dmitry Gudkov Phase correction of the CLIC TBM in CLEX Dmitry Gudkov Wilfrid Farabolini.
«BE-RF-PM» 1 Wire Ø0.08mm CLIC TBM Booth Posters Modules Line (1:10) AS and PETS samples RF components, vacuum equipment Supporting, magnets,
CLIC activity of S. Iija Feb 20121S. Iija, BE-RF-PM EDMS MTF Administrative work.
19-Sept-2012] «BE-RF-PM» TEST MODULES in the LAB DB girders (epucret) for T1 & T4: Optimization of the V-shaped supports Nick Gazis, Dmitry Gudkov, Vadim.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
Slide 1 Insert your own content.. Slide 2 Insert your own content.
CLIC activity of W. Zhou Feb 20121W. Zhou, BE-RF-PM Procurement Quality assurance.
CLIC Activities of M. Filippova Feb 20121M. Filippova, BE-RF-PM EDMS Quality assurance Component procurement.
Tech Site Jobs. Order Fulfillment Duties Maintain bagged room temperature kit components. Assemble kits for shipment. Inform other groups about kit needs.
CLIC Parameter Working Group Two Beam Module Design
Linac 4 Faraday cage P. Baudrenghien , D. Stellfeld BE/RF
TEST MODULE WG Cradles for CLIC module supporting system
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Alberto DEGIOVANNI CLIC Workshop CERN
Installation plan for LAB modules
X-ray Pump-Probe Instrument
TileCal ROD Commissioning Counting Room Installation
Slide 1 Insert your own content.. Slide 1 Insert your own content.
Slide 1 Insert your own content.. Slide 1 Insert your own content.
Slide 1 Insert your own content.. Slide 1 Insert your own content.
Thermal test (lab modules)
HL-LHC - WP15 modifications Coffrets Prise C4L8
Presentation transcript:

1 [12-Feb-2014] «BE-RF-PM» CLIC TBM Prototype Status update EDMS №[Number] Dmitry Gudkov 1

2 [12-Feb-2014] [CMWG Meeting] «BE-RF-PM» CONTENTS 2 TBM integration in CLEX Supporting system CLEX room in LAB-169. Status of the room preparation Preliminary planning for the TBM installation in CLEX

3 [12-Feb-2014] [CMWG Meeting] «BE-RF-PM» TBM Integration of the in CLEX 3 The integration is under way, but.. DB optics configuration has been changed (new input received from Jakob) Jakob Esberg The new study is needed in order to check: If new positions of the components in CLEX can be applied Components supporting girder, study is needed.

4 [12-Feb-2014] [CMWG Meeting] «BE-RF-PM» Supporting system status 4 All 4 girders have been controlled by metrology The cradles have been controlled by metrology Results (axis straightness) MBO-2 :0.010 mm MBO-1 :0.014 mm DBO-1 :0.012 mm DBO-2 :0.012 mm ZTS visit for installation of the equipment is confirmed: – report is under preparation We are waiting for the detailed visit program from ZTS. CLEX room in the LAB-169 is under preparation See next slides

5 [12-Feb-2014] [CMWG Meeting] «BE-RF-PM» CLEX room in LAB-169. Status of the room preparation The floor drilling is finished Threaded inserts are installed The location of the racks is defined OPEN POINTS: Acquisition and control needs? Electricity Internet Temperature in the LAB (18-28 deg.) Is everything ready? (SU) RACKS

6 [12-Feb-2014] [CMWG Meeting] «BE-RF-PM» Lab 169/S-039: Implantation drawing 6 Espace réservé pour manutention

Perçage et installation des chevilles diamètre 20 et 16mm après le tracé du positionnement des supports par les géomètres 40 trous OK Le lab. CLEX est prêt pour l’installation des supports P. de Souza, S. Lebet

Planéité des supports métrologique ??? Rectitude environ 15mm P. de Souza, S. Lebet

9 [12-Feb-2014] [CMWG Meeting] «BE-RF-PM» Preliminary planning for the TBM installation in CLEX 9