Presentation is loading. Please wait.

Presentation is loading. Please wait.

New test structures: Status report and technical documentation review

Similar presentations


Presentation on theme: "New test structures: Status report and technical documentation review"— Presentation transcript:

1 New test structures: Status report and technical documentation review
Case structures : 11WNSDVG1.KS N2 (T18) PETS 11.4 GHz with damping material Extra: BAAN, ERP-package for inventory management Margarita Saifoulina & Maria Filippova BE/RF Input from: Andrey Olyunin Germana Riddone Serge Lebet

2 CATIA/Smarteam & EDMS/MTF

3 CERN EDMS PLM = Product Lifecycle Management = EDMS/MTF at CERN Design
Manufacturing Installation Commissioning Maintenance Dismantling CERN EDMS

4 Import process MTF Axalant Design data Drawings & Documents
InforEAM PLM management Manufacturing workflow EDMS Web

5 Introduction to the EDMS/MTF
Design side(EDMS)= Items Structure of project Drawings 2D models Parameters Documentation (test/report) Physical manufacturing side(MTF) = Equipment Structure of assembly Made of Equipment data Manufacturing Workflow steps Quality control Documents(links to EDMS) Component’s traceability of whole product lifecycle Project data management Product life cycle management

6 Manufacturing Workflow in MTF
Describes the manufacturing process Easy to identify data when it appears along with the equipment being manufactured

7 How to access MTF? 1. Method

8

9 2. Method

10

11 11WNSDVG1.KS N2 (T18) Now it’s ready for shipment

12 PETS 11.4 GHz with damping material material
Now it’s ready for final bake-out

13 Notification letter for MTF
Proposal of letter content: Please find new attached report document in MTF, under the structure '11WNSDVG1.8 VB S- CLAAS CR000002'. = &p_rec_id=CLAAS CR000002&p_rec_type EDMS id. of document (ver.1) RF design and parameters of GHz T24_vg1.8_disk. ( or 11WNSDvg1.8; or CLIC_G undamped) created by Alexej GRUDIEV

14 Notification letter for MTF
Notification letter should be sent when document is attached to MTF Notification system updates every hour Who should receive notification letter? - CLIC RF production: IS, WW, AG, JPD, SL, MF, MS, MT, MM, JShi, AS, G. Arnau, Ph. De Souza

15 Enterprise Resource Planning – BAAN (Company name)
PLM/ERP for BE/RF CAD tools - CATIA PDM - EDMS PLM - MTF ERP - BAAN Enterprise Resource Planning – BAAN (Company name)

16 BAAN – Inventory Management
ERP- package used by CERN since 1995 It’s integrated to other applications such as EDH and Qualiac, which is another ERP package for purchasing and logistics export/import documentation Component’s traceability of whole product lifecycle in different levels of intra- and inter- organizational integration in one place

17 BAAN – Inventory Management
User-friendly interface  Training courses not compulsory Not yet web-based If needed AIS-support can create new functions of database for our personal needs Technical Specification in progress BAAN- package presentation available

18 BAAN – Example of standard layout

19 BAAN – Functions’ Screens

20 BAAN – Stock Management

21 Conclusion PLM/ERP eliminates:  The lack of information
 Waste of time Inefficiency of component’s whole lifecycle, not only in manufacturing If used properly PLM/ERP increase productivity Future actions:  Inventory management is needed  Standard information in reports for data management: what was done, who did, when, where


Download ppt "New test structures: Status report and technical documentation review"

Similar presentations


Ads by Google