1 [24-July-2013] [CMWG] «BE-RF-PM» CLIC TBM Prototypes Status EDMS №[Number] Dmitry Gudkov 1.

Similar presentations


Presentation on theme: "1 [24-July-2013] [CMWG] «BE-RF-PM» CLIC TBM Prototypes Status EDMS №[Number] Dmitry Gudkov 1."— Presentation transcript:

1 1 [24-July-2013] [CMWG] «BE-RF-PM» CLIC TBM Prototypes Status EDMS №[Number] Dmitry Gudkov 1

2 2 [24-July-2013] [CMWG] «BE-RF-PM» Contents 1.TBM Prototype T0#2@LAB 2.TBM Prototype T1@LAB 3.TBM Prototype T0@CLEX 2

3 3 [24-July-2013] [CMWG] «BE-RF-PM» TBM Prototype T0#2@LAB. Summary Table 3 Component3d2dFabrication StatusScheduledExpected DB supporting system100% READY-- MB supporting system100% READY-- AS mock-up *100% BrazingJun-13Sep-13 PETS mock-up **100% BrazingJun-13Sep-13 RFN mock-up **100% BrazingJun-13Sep-13 VNW100% READY DBQs mock-ups100% READY DBQ supports100% READY Cooling tubes and fittings100% READY U-clamps100% READY Vacuum Pumpscommercial MODULE ASSEMBLY Jun-13Sep-13..Oct-13

4 4 [24-July-2013] [CMWG] «BE-RF-PM» TBM Prototype T1@LAB. Summary Table 4 Component3d2dFabrication StatusScheduledExpectedProcurement/design resp. DB supporting system (cradles)100% Production *Jun-13Aug-13H. Mainaud Durand MB supporting system (girder, cradles)100% ProductionJul-13 H. Mainaud Durand/ N. Gazis Clamping frames0% DesignDec-13Nov-13M. Shah AS mock-up100% Design updatesSep-13 I. Kononenko PETS mock-up100% BrazingSep-13 N. Mouriz Irazabal RFN mock-up100% Parts productionSep-13 I. Kononenko Interconnection chain VACOM XS40 (x3)CCOrdered I. Kononenko Interconnection chain VACOM XS63 (x3)CCOrdered I. Kononenko Compact loads mock-ups100% BrazingJul-13Sep-13I. Kononenko VNW100% ProductionSep-13Jul-13C. Garion DBQs mock-ups100% READY M. Modena DBQ supports50%0%designNov-13 M. Sosin Cooling tubes and fittings100%95%designDec-13 V. Soldatov Vacuum Pumps (11 minipumps)CCTo be ordered C. Garion DB BPM100% READY IFIC DB BPM drift tubes100% ProductionSep-13Apr-13C. Garion MBQ mock-up Nov-13 Kurt Artoos MBQ BPM/Vacuum chamber READY Lars Soby MBQ support ST0441220_01 Nov-13 Kurt Artoos ASSEMBLY Dec-13

5 5 [24-July-2013] [CMWG] «BE-RF-PM» TBM@CLEX 5 Component3d2dProduction StatusScheduledExpectedProcur./design resp. Supporting system100% ProductionJul-13 N. Gazis Clamping frames50%0%designOct-13 M. Shah SAS100% ProductionSee AnS A. Solodko PETS#1100% READY, tested RF, Vacuum CIEMAT PETS#2100% Production, 1st octant readySep-13Oct-13CIEMAT RFN100%90%DesignOct-13 O. Gumenyuk RFN additional waveguides100%90%DesignOct-13 O. Gumenyuk Vacuum Chamber (x2)100% ProductionSep-13 C. Garion DBQs100% READY M. Modena DBQ supports50%0%designNov-13 M. Sosin High-power loads supports100%0%To be inquired, BoschSep-13 I. Kononenko Cooling tubes and fittings80%0%designOct-13 V. Soldatov Vacuum Pumps (10 minipumps)CCTo be orderedSep-13 C. Garion DB BPM100%20%DrawingsNov-13 V. Soldatov MB drift tubes100% ProductionSep-13 C. Garion PETS CF63-35 Adapter Flange (4 pcs) 100% To be producedSep-13 C. Garion Tee VACOM (2 pcs)CCTo be orderedSep-13 C. Garion VGV VAT 54132-GE02 (x3)CCTo be orderedSep-13 C. Garion Loads100% procurementSep-13 I. Kononenko ASSEMBLY IN LAB Oct-13Nov-13Dmitry Gudkov