1 Neutrino Platform Workpackages discussion EN-MEF-SU 17 September 2015 Beynel, Gayde, Mergelkuhl, Troillet EN/MEF-SU

2 Contents 2 Experiment Metrology Unit Infrastructure (survey and general) Different detector assemblies Alignment of components (relative and absolute) Maintenance Accelerator & computing Unit Alignment of beam lines

3 EM – Infrastructure 3 Geometrical infrastructure in experimental zones Physical references as brackets, tripods etc. Regular measurement of reference geodetic network New Civil Engineering structure => movements Tracing of beamline in experimental areas Different works for general infrastructure demanded by Technical Coordination

4 EM –Assemblies and alignment 4 Definition of reference points on detectors Discussion of metrology needs during detectors life time Metrology and fiducialisation of different detector parts Geometrical follow-up of detector assemblies Alignment of components relative to each other and with respect to beamline Operation (short and long term)

5 EM – Information on CENF project 5 Limited information available for the moment Preliminary discussion started A question list has been sent by SU and more detailed discussions are expected soon Info is presently too limited to give serious estimation for Manpower and equipment budget CENF planning in relation to YETS can change estimation significantly

6 Preliminary estimation of SU-EM metrology work 6 Preliminary estimation of SU-EM metrology work for CENF (16/09/2015) PointsDaysMan/daysComments Installation of Exp Geodetic Networks601020Experiences + Assembly areas 1st measurement of Exp Geodetic Networks601020Experiences + Assembly areas Maintenance of Exp Geodetic Networks603060Experiences + Assembly areas Total50100 InterventionsDaysMan/days Tracing for assemblies??? Depends on questionnaire answers Tracing for installation??? " Geometrical validation and Assemly of detectors??? " Calculation, analysis and reports??? 1 per measurement " Installation of componets on beam??? " Unit av. price (CHF) Total price (CHF) Geodetic Networks equipment (Brackets + Tripods …)6025015000Average price - Experiences + Assembly areas Survey Instrumentation 150000 If required parallel to LHC YETS and work demanded Total165000

7 Implantation du réseau de points de références (GGPSO). 2

8 3

9 Estimation provisoire des coûts pour la partie faisceau sur une base de 20 éléments Estimation du coût de la métrologie du Projet Extension EHN1 nouvelles hypothèses : 1 point tous les 20mètres, 1 station AT401 les 3points. EUR prix base 2015 (€)42.9655.6961.52 jourstechnicienprix techingénieur prix ingénieur Prix unitaire (CHF)Prix (CHF) mesures AT401 : 6 stat /jour + 1 34 points72 378.048 1.4 541.376 6050.598 Installation et nivellement des références Altimétriques 10 repères 1.52 378.048 0.3 541.376 1296.5577347.155 Tracé au sol de l’axe faisceau (70 ml) + éléments 20 m/jour 70 ml42 378.048 0.8 541.376 3457.485 Nivellement des points sol pour détermination des hauteurs de cales20 éléments22 378.048 0.4 541.376 1728.742 Premier alignement des composants20 éléments82 378.048 1.6 541.376 6914.97 Lissage des composants20 éléments33 378.048 0.9 541.376 3889.67 23338.02 Métrologie et fiducialisation22 378.048 0.4 541.376 1728.742 Chambres et Collimateurs ??????? MatérielNombrePrix unitaire Mires d'alignements36602160 Points de métrologie GGPSO + regards 46202480 Références Tripodes65303180 Général Suivi et calcul5154502250 35136.76 Imprévu 20%7027.353 TotalPrix (CHF)42164

10 10 THANKS FOR YOUR ATTENTION

11 11 General coordination How many experiments will be constructed? Who are the responsible persons for the individual experiments? Technical Coordinators or Project Leaders… What is the general timescale for Production, assembly, operations and where the survey will be implicated? Maintenance periods including survey after initial installation? Any demands for survey interventions in parallel to LHC YETS ? Survey at the delivery of the civil engineering in context of experimental installation (scanning)? Is any intervention expected for general infrastructure installation (tracings, controls etc).? Integration and installation of Survey infrastructure in zones like EHN1 ext. Definition of the manpower/needed instrumentation/budget following individual discussions of the points below Placement requirements for detectors (physics and engineering) Definition of demands and implication of survey section in Detector construction Detector assembly Detector placement Define coordinate systems for placement on beam lines Beam lines are partly inclined but detectors are not inclined Design and assembly of the cryostats and detectors Definition of references for assembly and placement in 6DOF Integration of reference marks on the different components in the design Should any pieces be geometrically cross-check in company or at reception? Define coordinate systems for assembly How will the detector be geometrically linked to the outside of the cryostat to determine the detector position? Survey interventions in the assembly procedure Define precisions needs for the different surveys and with respect to what… Is a direct follow up by survey of each step asked? Is a control at milestones of assembly as verification asked? Do you expect to do deformation tests to confirm calculations on prototypes? What is the size of the expected deformations? How will deformations of tooling and parts be treated during assembly, transport or installation?

12