IEC Electrical simulation models for wind power generation

Slides:



Advertisements
Similar presentations
Generic Models for Type 3 and 4 Wind Turbine Generators
Advertisements

1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Institut für Solare Energieversorgungstechnik Verein an der Universität Kassel Preparation of a European Network of Excellence of DG Laboratories for Pre-standardisation.
IEC PT TC88 meeting March 2010 Jens Carsten Hansen.
Study Committee Representatives Annual Report December, 2012
Tore Langeland, Yongtao Yang and Carl Öhlen Risk based approach for development of offshore HVDC transmission technologies EWEA 2012.
Siemens Power Technologies International
CFD Simulation: MEXICO Rotor Wake
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Validation of W4e Hydropower Turbine Generator PI Henry W Russell Walker Wellington,
New Energy Horizons Opportunities and Challenges Update on IEEE PC Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement.
PCWG 9 th Meeting: 12 December Glasgow Introduction, Agenda and Review of Actions.
Report from MT01 Peter Hauge Madsen Convenor MT01.
WATERLOO ELECTRICAL AND COMPUTER ENGINEERING 60s: Power Engineering 1 WATERLOO ELECTRICAL AND COMPUTER ENGINEERING 60s Power Engineering Department of.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
Study of Wind Energy Penetration in the Iberian Peninsula RED ELÉCTRICA DE ESPAÑA 1 WIND POWER GENERATION Study of Wind Energy Penetration in the Iberian.
Miles Shepherd Chairman ISO Technical Committee 258.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Collegiate Wind Competition Wind generation competition 502 project focus is on electrical generator, power conditioning electronics, and control.
PCWG meeting Louisville CO USA October 2014 Maintenance team MT12-1 Revision of IEC : Wind Turbines – Part 12-1: Power performance measurements.
Aspects of Relevance in Offshore Wind Farm Reliability Assessment Nicola Barberis Negra 2 nd PhD Seminar on Wind Energy in Europe Risø.
IEC TC 62 presentation to DICOM Norbert Bischof Secretary IEC TC62 ELECTRICAL EQUIPMENT IN MEDICAL PRACTICE Secretary IEC SC62B DIAGNOSTIC.
IEC TC 88 PT IEC Ed.1: Wind Turbines – Part 5: Rotor Blades
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Grid Compliance and Wind turbines in weak and Island grids –
SINTEF Energy Research 1 Fault ride-through testing of wind turbines Presented by: Olve Mo Paper co-authors: John Olav Tande Leif Warland Kjell Ljøkelsøy.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
IceWind project TFI Annual Conference September 2010 Niels-Erik Clausen Wind Energy Division, Risø DTU.
The Top-level Research Initiative -Presentation at TFI’s annual Conference 2010 PK4 Integration of Large-scale Wind Power.
Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG Barcelona May DISPOWER Distributed Generation with High Penetration of Renewable.
Common Information Model and EPRI Smart Grid Research
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
Sommerville Power Engineering Ltd. Introduction & Overview Company Number , registered in England & Wales. SPE August 2015.
Frankfurt (Germany), 6-9 June 2011 MARTENSEN – DE – Session 4 – 1221 The Cell Controller Pilot Project (CCPP): From Surviving System Black-Out to Market.
PLCopen for efficiency in automation Page 1 printed at 10/16/ Welcome at the PLCopen presentation.
Voltage grid support of DFIG wind turbines during grid faults
IEC TC57: Report on WG21 Interfaces and protocol profiles relevant to systems connected to the electrical grid P. Ferstl August 2012 INTERNATIONAL ELECTROTECHNICAL.
Revision of IEC PT Power performance measurements on electricity producing wind turbines TC88 meeting March 2010 Troels Friis Pedersen.
Last days of suppliers hegemony: customer driven market has come Athens, March 1 st, 2006 Ester Cámara Operations Manager Iberdrola Renewables Energies.
Electrical Cable Aging and Condition Monitoring Codes and Standards for NPPs Dr. Stephanie Watson Engineering Laboratory NIST 100 Bureau Drive, MS 8615.
IEC Measurement and assessment of power quality characteristics of grid connected wind turbines Convener John Tande, SINTEF (NO) Presented by.
Report from COEN CAMD Krakow 27 – 28 October 2011 Lars Johansson.
UpWind THE EC INTEGRATED PROJECT UPWIND Peter Hjuler Jensen Programme Manager Coordinator for UpWind Risoe National Laboratory.
Electric Energy Systems Smart Grids and IEA ENARD – Annex II: DG System Integration into Distribution Networks Helfried Brunner Operating Agent AnnexII.
REPUBLIC OF MACEDONIA STATUS REPORT ON MEETING THE COMMITMENTS OF THE ATHENS MOU SEEERF IV PERMANENT HIGH LEVEL GROUP MEETING Athens, Greece September.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
Length Mass Prepackages Health Environment Safety Trade Volumes Flow Energy Pressure Concentration Enforcement R. Schwartz, 46. CIML Acceptance.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task XVII Workshop on Demand Side Management.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Task XVIII: DSM and Climate Change Task Status Report Dr David Crossley Managing Director Energy Futures Australia Pty Ltd IEA DSM Executive Committee.
Global Wind Turbine Components Market WEBSITE Single User License: US$ 2500 No of Pages: 73 Corporate User License:
26 September 2006, Sofia, Bulgaria 1 Scope and Objectives: The main goal of the network of excellence DER-LAB is to support the sustainable integration.
Growth for Danish Business Life - Quality for Danish Society.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
Energy Storage Systems (ESS) Standards Activities
Agenda TSOG 8th November
Transposition of European Network Codes
Grid Code Review Panel 16th August 2017
Scott MacLeod UL LLC TC 111 US NC
Off-cycle Emissions GTR – Status Report for GRPE
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Fuel Cell Market size worth $25.5bn by 2024 North America Microgrid Market.
Electricity Distribution Network Design Training & Courses
Standardization of power electronic systems and equipment
Intelligent Power Module
European Network of Transmission System Operators for Electricity
GLOBAL SMALL WIND TURBINE MARKET RESEARCH AND FORECAST Orion Market Research.
WG Environmental Expenditure Statistics
Steering Committee, Eurostat, Luxembourg, 4 February 2011
A Global Consensus Process
Strategic Coordination Group 2007 Reporting Guidance on Monitoring
National Institute of Wind Energy(NIWE)
Presentation transcript:

IEC 61400-27 Electrical simulation models for wind power generation Poul Sørensen Risø DTU Roskilde Denmark

Outline of this presentation Scope Participants and meetings Status Timeline TC88 meeting Boulder March 2010

Scope of IEC 61400-27 Define standard dynamic simulation model for wind power Application: Power system and grid stability analysis Applicable for dynamic simulations of Short circuits (fault ride through) Loss of generation or load System separation 2 parts Wind turbines Wind farms TC88 meeting Boulder March 2010

Scope of IEC 61400-27 – part 1 Wind turbine modelling must define: Generic dynamic models for topologies / concepts on market Methodology to create models for new concepts Model parameters Models refer to wind turbine connection terminal Independence on simulation tool To outmost degree With clear definition of interface to simulation tool Validation Shall include tests according to IEC 61400-21 Response to voltage dips Set point requests TC88 meeting Boulder March 2010

Scope of IEC 61400-27 – part 2 Wind turbine modelling must define: Generic dynamic models for topologies / concepts on market Auxiliary equipment Wind farm control Methodology to create models for new concepts Models refer to wind farm point of common coupling Independence on simulation tool To outmost degree With clear definition of interface to simulation tool Validation TC88 meeting Boulder March 2010

IEC TC88 NWIP – Votes TC88 meeting Boulder March 2010

Members WG27 has now 33 members from 14 countries. Wind power vendors, Sub suppliers, Consultants, Certification, Research and University Grid operators Transmission System Operator (TSO) Distribution System Operator (DSO). TC88 meeting Boulder March 2010

Complete members list of WG 27 Michael Ebnicher, Bachmann electronic GmbH (AT) Jens Fortmann, REpower Systems AG (DE) Frank Fischer, PowerWind GmbH (DE) Frank Martin, Germanischer Lloyd Industrial Services GmbH (DE) Jeferson Marques, Enercon (DE) Vladislav Akhmatov, Siemens Wind Power (DK) Björn Andresen, Siemens Wind Power (DK) Poul Sørensen, Risø DTU (DK) Knud Johansen, Energinet.dk (DK) Bo Hesselbæk, Vestas Wind Systems A/S (DK) Montserrat Mata, ECOTÈCMOA / ALSTOM (ES) Emilio Gómez Lázaro, UCLM Research Institute (ES) Alberto Molina Martín, ENERGY TO QUALITY S.L. (ES) Javier Pérez-Jacoiste, Gamesa (ES) J. Manuel Rodrigo, EDP Renovaveis (ES) Jouko Niranen, ABB (FI) Slavomir Seman, ABB (FI) Jerome Duval, EDF R&D (FR) Graeme Bathurst, TNEI Services Ltd (GB) Junji Kondo, AIST (JP) Kazuo Shibata, Japan Electrical Manufacturers' Association (JP) Hee-Sang Ko, Samsung Heavy Industries (KO) Seung-Ho Song, Kwangwoon University (KO) Edwin Wiggelinkhuizen, ECN Wind Energy (NL) Jarle Eek, SINTEF Energiforskning (NO) Larisa Vladimirovna Varigina, RusHydro (RU) Åke Larsson, Vattenfall (SE) Yuriy Kazachkov, Siemens PTI (US) Pouyan Pourbeik, Electric Power Research Institute (US) Abraham Ellis, Sandia National Laboratories (US) Nicholas Miller, GE Energy (US) Eduard Muljadi, National Renewable Energy Laboratory (US) Robert M Zavadil, EnerNex (US) TC88 meeting Boulder March 2010

Meetings Meetings held: 1st WG meeting Roskilde, Denmark 6-7 October 2009 2nd WG meeting Barcelona, Spain 27-28 January 2010 Planned meetings 3rd WG meeting New Orleans, USA, 20-21 April 2010 4th WG meeting Helsinki, Finland, 31. August – 1 September 2010 TC88 meeting Boulder March 2010

Status Focus document Responds and agrees to secretariat observation ”the initial task of the project team shall be focussed on clear broader definition of the outline to establish consensus providing sound basis for their work” Drafted between 1st and 2nd meeting and discussed on 2nd meeting First priority of WG27 is to perpare Focus document specifying in more details: Applicability and limits of models and validation procedures Requirements to models and validation procedures 1st working draft now under preparation for 3rd meeting discussion, it will include: Introduction Definitions and references Applicability and limitations Verification first draft TC88 meeting Boulder March 2010

Timeline TC88 meeting Boulder March 2010