Presentation is loading. Please wait.

Presentation is loading. Please wait.

IEC TC57: Report on WG21 Interfaces and protocol profiles relevant to systems connected to the electrical grid P. Ferstl August 2012 INTERNATIONAL ELECTROTECHNICAL.

Similar presentations


Presentation on theme: "IEC TC57: Report on WG21 Interfaces and protocol profiles relevant to systems connected to the electrical grid P. Ferstl August 2012 INTERNATIONAL ELECTROTECHNICAL."— Presentation transcript:

1 IEC TC57: Report on WG21 Interfaces and protocol profiles relevant to systems connected to the electrical grid P. Ferstl August 2012 INTERNATIONAL ELECTROTECHNICAL COMMISSION SC25 WG1 N1567

2 2 TC 57 WG 21 Mission & Scope  Mission Define interface between the smart grid and residential and commercial building and industrial energy management systems and the smart grid.  Scope Identification of use cases which involve systems connected to the electrical grid. The focus is on interaction between power system management (TC 57 standards) and H/B/I energy management systems. Development of requirements and international standards for system interfaces, communication protocols and profiles in consideration of  Interconnecting a large number of geographically distributed systems  Domain specific protocols for industrial, home and building automation  State-of-the-art wireless and wired communication  Efficient installation, commissioning and maintenance

3 3 TC 57 WG 21 Visualization of Scope Grid Power Management SystemH/B/I Automation System Systems Interface Power Management System DER Automation System DER TC 57 WG 21 TC 57 WGs TC 65 ISO TC 205 JTC1 SC25 …. TC 57 WG 17

4 4 TC 57 WG 21 WG21 Members  33 members  Participants from 11 countries  Brazil  Croatia  France  Germany  Great Britain  Japan  Netherlands  Russia  Spain  Switzerland  USA

5 5 TC 57 WG 21 Recent and planned meetings / participation DateLocation# Participants 09/11Frankfurt/M, Germany7 members 4 guests 01/12Munich, Germany8 members 5 guests 03/12Frankfurt/M, Germany10 members 3 guests 10/12Frankfurt/M, Germany

6 6 TC 57 WG 21 Point of Common Coupling XPoint of Common Coupling (PCC) Utility Power System LoadGenerationStorage XXX Local Power System X = Electrical Connection Point (ECP) Grid Power Management SystemH/B/I Automation System Power Management System Automation System DER Systems Interface DER

7 7 TC 57 WG 21 Domain Split for Systems Interface Home/ Building / Industry Automation System Description of Point of Common Coupling Based on 61850-90-7 object models for DER Grid Operations Technical Grid Operations (Power) Demand Response commercial (incl. direct load control) Commercial Operations (Energy) Revenue Metering (CIM) COSEM IEC 62056 CIM Web Services?SML/SOAP? Data Model Communication LoadGenerationStorage Life cycle management of a dynamic eco system

8 8 TC 57 WG 21 Current work  Use case team  Technical report 62746-2 Use Cases and Requirements  First Draft: 12/2012  Architecture team  62746-3 Architecture  First Draft: 12/2012


Download ppt "IEC TC57: Report on WG21 Interfaces and protocol profiles relevant to systems connected to the electrical grid P. Ferstl August 2012 INTERNATIONAL ELECTROTECHNICAL."

Similar presentations


Ads by Google