Melissa Hollis Basis of Estimates Coordinator Engineering Systems Support Section State Specifications and Estimates Office October 2014 1.

Slides:



Advertisements
Similar presentations
Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Advertisements

ODOT Structure Project Manager Seminar Specifications
July Training Outline Part 1 Cost-per –SF and Detailed Estimate Pay Item Detailed Estimate Segments Bridge Level Data Segment Level Data Supports.
Installation of Loops on resurfacing projects through maintenance Ted Swansegar
Basis of Estimates Part 2 Pay Item Use Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012.
Oklahoma Department of Transportation Susan McClune Regulatory Services.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Steve Varnedoe Condition Assessment & Funding Needs for North Carolina’s Highway System North Carolina Department of Transportation Report to the Joint.
Maintenance of Traffic (MOT)
E20 TALLINN - NARVA RECONSTRUCTION MAARDU - VALGEJÕE.
Overview of 2009 MUTCD. Tom McDonald, PE Safety Circuit Rider Iowa LTAP.
Welcome to Inspecting Maintenance of Traffic Items on Projects
Melissa Hollis Basis of Estimates Coordinator Engineering Systems Support Section State Specifications and Estimates Office October 2014.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Revisions to Part 8 – Traffic Control for Railroad and LRT Grade Crossings.
Things to look for and remember while preparing FD05 Estimates.
MAINTENANCE RATING PROGRAM Allen Mattox District Five Technical Support Manager.
DEPARTMENT OF TRANSPORTATION. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County.
Part 3 – Markings. Dotted (not broken) lane lines shall be used for non-continuing lanes:  Lane drops  Auxiliary lanes  Deceleration lanes  Acceleration.
1 Starting a Project – Looking for footpaths or pushed down ROW fences Plan for your pedestrians or they will be walking through your project on the edge.
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
Maintenance and Protection of Traffic (MPT) – HDM Ch 16.
Designer Interface and Basis of Estimates Designer Interface for wT and BOE Basics for Designers and Reviewers June 16, 2015: Ongoing DI and BOE changes.
Overview of FDOT’s Long Range Estimating System 2005 TEA Conference November 4, 2005 Daytona Beach, Florida.
Safety Audit Components Safety assessment for risk Management.
February 2013 TOLLWAY MANUALS AND STANDARDS PRESENTATIONS 1.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
SPECIFICATIONS UPDATE KELLY MANNERING DelDOT QUALITY CONTROL (302)
Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
VALUE ADDED FEATURES Who’s Excited??? 2015 Construction Academy Larry Ritchie July 28 th, 2015.
MnDOT Sample Plan - Jerry Kotzenmacher MnDOT
2002 AASHTO ROADSIDE DESIGN GUIDE A CONCISE OVERVIEW.
ESTIMATES UPDATE TRAINING BULLETINS FOR 2013 Melissa Hollis, Basis of Estimates Coordinator August 1, 2013 webinar.
2009 ACEC/ODOT CONFERENCE ODOT’S 1R PROGRAM Liz Hunt, P.E. ODOT Pavement Services Engineer.
Things to look for and remember while preparing FD05 Estimates.
Estimating PS&E – Plans, specifications and estimate 1.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Grade Separation Inspection & Ratings Grade Separation.
Plan Scales (see DOT 1B-3) 22”x34” paper for final designs (preliminary usually ½ size, 11”x17”) 1. Plan view: a) Rural a) 1:1000 plan scale (or 1”=100’)
There are 2 Types of Bridge Inspectors – Class B and Class A.
REVIEW OF THE PROPOSED SIGNIFICENT REVISIONS TO THE 2011 VIRGINIA WORK AREA PROTECTION MANUAL Fall 2014 Virginia ATSSA Chapter Meeting October 1, 2014.
MnDOT Intelligent Transportation Systems Project Management Design Course Section 6: Discussion.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
An Introduction to Contracts and Design Guides Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
Ezzeldin Benghuzzi, P.E UPDATE TRAINING Contact Information: Ezzeldin Benghuzzi, P.E ezzeldin. Contact Information:
Design Standards 1 Marshall Douberley 2012 UPDATE TRAINING Contact Information: Marshall Douberley Earl.
Temporary Pedestrian Accommodations in Utility Work Zones Rebecca Klein, PE Regional Work Zone Engineer ,
Maintenance and Temporary Traffic Control
FLORIDA DEPARTMENT OF TRANSPORTATION MAINTENANCE RATING PROGRAM.
ALDOT Specifications Update
There are 2 Types of Bridge Inspectors – Class B and Class A.
Chapter 2 General Principals of Traffic Signing
Interstate 15 North Phase 4 Cost Estimates 09/03/2015
5th Street Bridge Replacement Project Contract No
Interdisciplinary teams Existing or new roadway
2017 Reconstruction of Northfield Street
Traffic Control Plan Development Course
Acceptance Process for Manufactured Products by Certification:
PS&E – Plans, specifications and estimate
Construction Management & Inspection
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
ACEC Designer Training
Presentation transcript:

Melissa Hollis Basis of Estimates Coordinator Engineering Systems Support Section State Specifications and Estimates Office October

 Part 1: Introduction to the Basis of Estimates Chapters 1-10  Part 2: Selecting Pay Items Chapters For FDOT and Consultant designers Update training for bulletins, as needed  Part 3: Estimating and Review Recent changes Pricing details for FDOT Estimators 2

 BOE Online Chapter 11: 100s  MOB, MOT, Erosion, Clearing & Grubbing Chapter 12: 200s  Earthwork, Base Chapter 13: 300s  Asphalt, Friction Course  Concrete Pavement Chapter14: 400s  Structures, Drainage Chapter 15: 500s  Curb, Sidewalk, Guardrail, Fence 3

 BOE Online Chapter 16: 600s  Signals, Conduit, Pull Boxes Chapter 17: 700s  Signing, Pavement Marking, Lighting Chapter 18: 800s  Mass Transit- Railroad Chapter 19: 900s  Special, Developmental Chapter 20: 1000s  Utilities 4

 Example Pay Item Groups AASuperpave Asphaltic Concrete, TN ABSingle Post Sign, AS 5

Every Pay item group: Details Structure Active items 6

 Maintenance of Traffic, LS NO Erosion Control Devices- use 104 items NO Temp Fencing- use Ped LCDs or 550 items NO Temp Drainage quantities NO Temp Asphalt- use Special Detour NOT a “catch all” for other work NO contingency quantities NO weather quantities 7

 Special Detour, LS Temporary Asphalt Show the location and a typical section with minimum design DO NOT show base quantities DO NOT show asphalt quantities Why? The contractor is responsible for “installing and maintaining the detour”. If we provide quantities, then we have the possibility of claims when the detour requires additional materials. Bulletin Pending 8

 Commercial Material for Driveway Maintenance, CY Through 2014: may use estimated quantity based on xxx cy per mile Effective 2015: Identify locations and quantity on summary box 9

 Vehicular  Pedestrian  Read Index 600, including recent changes for Ped LCDs  Orange “Construction Fence” is not an acceptable channelization device. 10

 Temp Signalization, ED Includes maintenance of the signals throughout the duration of the project. Includes moving signal heads Includes “temporary heads” or poles, as needed  Temp Detection, ED Includes maintenance of the detection throughout the duration of the project Includes temporary detector What types are acceptable? A: Provide temporary traffic detection equipment listed on the APL. 11

 104- xx Erosion Control DO NOT include quantities “based on replacement every xx months” Why? maintenance and replacement of items is included in the item. Products are selected from the Erosion and Sediment Control Handbook. DO NOT call for hay or straw bales, or any specific product Sediment Barrier, LF Inlet Protection, EA (per each inlet) 12

 107: Litter Removal and Mowing Identify locations in the plans Yes- this may require several plans sheets for urban areas, but it is still an overall reduction in pages from the comp book. 13

 285-7xx- Optional Base, SY  286-Turnout Construction 14

 Milling, SY  AA Superpave, TN AA options set by State Materials Office to coordinate with current specs & binders NOT for temporary locations  AA Friction Course, TN AA options set by State Materials Office  Misc Asphalt, TN Used for under guardrail, bicycle paths, etc. NO TESTING 15

 350s Concrete Pavement NOT FOR BRIDGES 350-5: Joints (new and existing pavement) are paid separately for the sealing/resealing) 350-6: Sealing Cracks See 458 for bridge joints 353 Concrete Pavement Slab Replacement NOT FOR BRIDGES, SLOPE PAVEMENT, ETC. 16

 400- Concrete, CY Concrete by class For culverts, endwalls, superstructure, substructure, etc. READ THE IDS (Instructions for Design Standards) for the intended application NOT for incidental concrete, such as lighting or signals poles, pull boxes, or cabinet foundations/bases. Incidental concrete is included in work/materials for these items.  415- Reinf Steel, LB READ THE IDS; some steel is incidental 17

 425 Inlets  430 Drainage Pipe NOT for utility use/JPA projects Read the Standard/IDS for drainage structures  Jack & Bore drainage pipe only  Special: Minor changes to standard: note changes in the plans; payment under standard pay item No applicable standard: call for assistance with pay item. “Special” pay items are blocked. 18

 450 Beams  455 Drilled Shafts Call for other sizes/shapes  455 Protection of Existing Structures PENDING for July 2015 Spec & Pay Item move to 108 New plan requirements New guidance in 2015 PPM- locations (buildings) to be protected must be identified in the plans  458 Bridge Joints 19

 515 Railings  521 Traffic Barrier/Railings Read the IDS Guide rail, handrails, Ped/Bike with Infil  520 Curb Elements “Curb” Curb Curb & Gutter Traffic Separator  522 Sidewalk (4” & 6”)  527 Detectable Warnings 20

 524 Slope and Ditch Pavement New/replacement Cleaning & Sealing Joints 21

 Guardrail End to End measurement End Anchorage- per ea  one for each end, type as applicable 22

 Guardrail End to End measurement  Paid as type outside of transition End Anchorage- per ea  Bridge anchorage  Other end, type as applicable 23

 546 Rumble Strips Sets- approach to intersection, across roadway Shoulder PENDING: Center line and Edge Line (Rumble Stripe) Spec and pay item will change unit of measurement from “Per mile” to “net mile”- end to end minus bridges, vs. stripe measure  550 Fence Temp Fence, only as identified in spec Does NOT include “orange construction fence” 24

 590 Irrigation System, LS  591 Landscape Sleeve, LF Developmental Standard Index 591 Project-by-project approvals for standard Pay items assigned to approved projects Cost effective vs. Jack & Bore later Design effective, if coordinated with landscape plans o Not for “possible” future system, where locations cannot be coordinated 25

 COPS: Coordination of Products and Specifications QPL merge with APL, effective with Jan 2015 lettings Web links for both with provide redirect to new application Specifications and Pay items: most changes have been completed Minor changes pending 639- Power/Electrical Service 740 series- Traffic Monitoring (Transp Statistics) 26

 630 Conduit  635 Pull, Splice, and Junction Boxes  670 Traffic Controller Assembly 671 Controller “electronics” 676 Cabinet “shell, with or without wiring”  Removal Items- No Section 690 Remove pole and “all attachments”  Span wire or arm  Signal assembly  Pedestrian Detector  Pedestrian Signal  Ask about other items; ongoing changes 27

 700- Signs If it looks like a sign, acts like a sign… From PPM Vol 2, :  Any signs to be mounted on signal span wires should be shown and listed on the signalization plan for illustration and placement purposes. Sign details should be included on the signing plans. (Per Chester Henson, State Roadway Design- signing expert, signs mounted on mast arms should be addressed the same way.) PPM Vol 2, :  Any span wire or mast arm mounted signs shall be coordinated with the appropriate signing and pavement marking plans to avoid duplication.  The sign details for traffic signal signs must be included on the signalization plans, if signing and pavement markings are not included in the plans package. 28

 Highlighted sign LED Border  Embedded DMS  Front Access DMS  Walk-in DMS Static sign paid separately  DMS Structure 29

 701- Audible & Vibratory  709- Two Reactive Components  711- Thermoplastic Hot Applied “Standard” Rumble Stripe “with 546” Preformed  713- Permanent Tape  Pending: Guidance/Bulletin for July 2015 Contrast for light asphalt and concrete Locations for Rumble Stripe vs

 750, 751 series- Buildings  751 “Other Architectural” Bus Shelter Bicycle Rack Trash Receptacle Bench Pedestrian Plaza  780 ITS Road Weather Info System(RWIS)  785 ITS items moved to 600 series for cabinet, poles, etc. 31

 Rail pay item structure was created 5+ years ago.  Call if you have a project with rail or other mass transit needs.  New pay items will be made available as needed. 32

 Developmental Developmental Specifications Developmental Standards  Other Special Use pay items  Follow rules for requesting developmental secifications or standards  Pay Items will be made available for approved projects. 33

 Standard Items No cost history Project Specific Tech Specs Do Not “borrow” pay items from drainage, signals, or signing  Generic Pay Items Refer to Chapter 6 for the rules “Wide open” for utility applications  No need to track cost history  No FDOT standards or specifications Monitored for non-utility applications 34

 If you don’t see a pay item that you need, please ask. Existing/available Item groups Request that an item be opened/activated, if needed Request that we restore an old item/structure, if needed  Verify that old specs/standards are applicable Request that we create a new item group Consider requesting a Developmental Specification and Pay Item Consider a Generic Pay Item 35

Melissa Hollis Basis of Estimates Coordinator Estimating Systems Support Section State Specifications and Estimates Office 36

37