PS&E – Plans, specifications and estimate

Similar presentations


Presentation on theme: "PS&E – Plans, specifications and estimate"— Presentation transcript:

1 PS&E – Plans, specifications and estimate
Estimating PS&E – Plans, specifications and estimate

2 Types of Estimates Ball-Park (Planning phase)
Preliminary (Design Report/EIS) Detailed (PS&E---Detailed Design)

3 Estimate Quality Good book-keeping Accurate backup of quantities
Familiarity w/ project Experience

4

5 Estimating Procedure List all item numbers-plans and similar plans
Estimate quantities and prepare a backup for each item # Assign prices to each item (WAIPR) Lump sum price analysis Summary of quantities Add contingency Summarize final costs

6 Item Numbers Referenced to spec book Examples:
Clearing and Grubbing 203.xxxx Grade and Reshape Ditches 304.xx Subbase Establish Turf Survey and Stakeout *Special specifications—General or Special (must be approved)

7 Units Unit abbreviations Definition LS Lump Sum EA Each CY Cubic Yard
SY Square Yard LF Linear Feet TN Ton MO Month

8 Units-Metric Unit abbreviations Definition CM Cubic Meters SQM
Square meters MT Metric Ton KG Kilograms M Meters

9 Specifications center/engineering/specifications

10 Specifications-Example 201.06

11 Specifications-Example 201.06

12 Pay Item Catalog (PIC)

13 Weighted Average Item Price Report (WAIPR)

14 WAIPR Example

15 Special Spec Repository

16 Contingency Added to estimate to account for unknowns
Usually a percentage of final cost

17 Cost Estimate Example Item # Description Unit QTY Price Subtotal
Clear & Grub LS 1.0 $12,500.00 Earth Cut & Emb CY 14,545.0 $12.00 $174,540.00 Bale Dikes LF 42.0 $7.50 $315.00 Asph Base Course TN 6392.0 $38.00 $242,896.00 24” RCP End Sec EA 4.0 $700.00 $2,800.00 Office MO 6 $1,000.00 $6,000.00 Traffic Sign 8 $170.00 $1,360.00

18 Backup for Estimate Example ITEM 640
Backup for Estimate Example ITEM (White Paint Reflective Paint Stripes) 2 Shoulder Stripes Sta to Sta 30+92 2*448’ = 896’ Say 900’

19 Asphalt – English Tons .06865 Tons per Cubic Foot (Base)
Tons per Cubic Foot (Binder) Tons per Cubic Foot (Top-6F) Old Marshall Design New Superpave?????

20 Lump Sum Price Analysis
Estimate for items paid as a “Lump Sum” Includes: Labor Materials Equipment Rental costs Profit and Overhead Typical lump sum items: Clearing and Grubbing Survey and Stakeout Temporary Traffic Signals

21 Lump Sum Analysis Example Item 619.13 (Temporary Traffic Signal)
Labor Costs Backhoe Operator-$30.05/hr Electrician-$32.99/hr Laborer-$22.95/hr Prevailing Wages Installation and Removal of Temp. Poles 1 Backhoe Operator $30.05/hr * 16 hours = 2 $22.95/hr * 16 hours = Installation and Removal of Temp. Signal Heads 1 $32.99/hr * 16 hours = 2 $22.95/hr * 16 hours = Installation and Removal of Controller 1 $32.99 * 16 hours = 1 $22.95 * 16 hours =

22 Lump Sum Analysis Example-Cont. Item 619.13 (Temporary Traffic Signal)
Materials Temporary Poles $1, each Temporary Signal Heads $ each Controller, Fixed Time $1,000.00 Misc. Hardwire and Wire $1,000.00 Equipment (Installation and Removal) 1 Bucket $18.00/hr * 24 hours 1 $35.00/hr * 24 hours Profit and Overhead (20%)

23 Estimate Shares Highway Bridge Utilities Different Counties

24 Engineer’s Estimate Quantities included in plans Engineer’s estimate not given to contractor Prices not available to contractor—each contractor provides their own bid Lowest bidder gets the contract

25

26