R.Becker (MIT) 15/10/02 UGBS Main Plate Patrick Schmid (left) of ETHZ did the CNC machining of the plate. Urs Horisberger (ETHZ) Completed follow up machining.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Manual Flo-tap Installation Instructions
Click on this image to open the full PDF document.
1 UBC International Training Fund Presents. Tensioning.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Engineer Training Inkjet Head Cleaning TJ8300 / TJ8500 Inkjet Head Cleaning.
Gear Drive Flo-tap Installation Instructions Quick Installation Guides: rev. EA – 485 Flanged Flo-tap rev. DB – 485 Threaded.
PROJECT 100. PROJECT 100 DESIGNED TO BE: Cost Effective Compact Strong Simple Light Reliable.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Integration and Test 14 October 2008 Martin Nordby.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
TP4-ENERSOL-TD/PV double function
Fermilab Cavity Refurbishment Status J. Reid M. Slabaugh November 19, 2014 J. Reid 1.
FABRICATION OF BLOCKS OWNERS REQUIREMENT DESIGN CLASSIFICATION SOCIETY
HCAL-J Update (G.B. Franklin, CMU, Mar. 2015) 40 Ton Detector 288 modules Arranged in 4 sub-assemblies 24 Modules (360 cm) 12 Modules (180 cm) 1 Absorbers.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Current Safety Status Phase III Flight Safety Review 12 Jan 2009.
7/17/02Reyco Henning -- TRD Box S Component Testing 1 TRD Box S Solenoid Valve Testing AMS TRD Meeting, CERN, July 2002 U. Becker, G. Carosi, R. Henning,
Modification to Allow Automatic Filling of TSI Nephelometer with CO 2 Patrick Sheridan NOAA.
Candela Display Systems 3x2 Interactive Video Wall System.
Door seal test set-up concepts 10/10/2015Robin Lafever LBNL1 Generic Door seal concepts for personnel access and feed-through applications in the CUORE.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.
7/17/2002R. Henning -- TRD Gas Slow Control1 TRD Gas System Slow Control at MIT- Cambridge AMS TRD Meeting, CERN, July 2002 U. Becker, B. Demirkoz, P.
Investigating Fluid Power Rig Operating instructions (c) 2012 Mechanical Kits Ltd.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Engineer Training Ink Insertion TJ8300 / TJ8500 Ink Insertion.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
Natura Water Machine B and D Series 3 – Dispense tower plumbing kit Kit number Kit includes components used for both Natura B and Natura D series.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
N. Dixon PH / DT CERN 12 July Straw Material, weld line latest news and plans.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Compressor Replacement – ODU
Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
1 Proposal of the mechanical support on the Buffer for the 10“ PMTs by Enrique Calvo Alamillo.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Neil Dixon PH/DT Dubna July 1010 Straw Material latest news and plans 1.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
A SEMINAR PRESENTATION ON EICHER ENGINE
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
EBS-1 # COOLANT FLUID EXCHANGE QUICK REFERENCE ATTENTION: Using the Coolant Fluid Exchange requires the FILL and VAC Valves on the SERVICE.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
ATLAS Internal ID Service Integration
Teleconf ACS – FREIA 28th March 2017
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Engineering Sketching (not in your book)
Investigating Fluid Power Rig
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
Far Detector Activities Late 2017 – Early 2018
Update on development of consolidated insulation system and procedures C. Scheuerlein, 4th DISMAC meeting,
Teleconference ACS – FREIA 20th February 2018
Undulator Assembly Procedure
ESS Concrete Pit Lids.
Teleconference ACS – FREIA 19th June 2017
UPPSALA UNIVERSITY_GERSEMI PROJECT
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

R.Becker (MIT) 15/10/02 UGBS Main Plate Patrick Schmid (left) of ETHZ did the CNC machining of the plate. Urs Horisberger (ETHZ) Completed follow up machining

R.Becker (MIT) 15/10/02 UGBS Plate Machining Back (top) & Front (right) sides of plate

R.Becker (MIT) 15/10/02 UGBS Subassemblies

R.Becker (MIT) 15/10/02 UGBS Plumbing Model Model was made to: perform a Fit check of the subassemblies Weld the whole system Test the valves & system

R.Becker (MIT) 15/10/02 MV197 Bracket

R.Becker (MIT) 15/10/02 MV197 Bracket Tube welding The full assembly looks like thisEasier to look at half! The welding procedure will look at only half since the other side is mirror symmetrical

R.Becker (MIT) 15/10/02 2 Step Construction First the “U” (welding steps 1,2,3) are welded not mounted in the bracket. Then the xv254 and the filter are mounted and welded (steps 4-6) The GP50 is installed and all remaining welds performed. The welded components are now removed to allow for the welding of the MV197 valves The MV197’s are installed and secured as shown The “U” (steps 1,2) is pre-welded and then welded to the valves (steps 3,4) the 1/4”-1/8” reducers are pre-welded to the T-junctions and then welded to the valves (steps 7,8) The “U’ is then welded (steps 9,10) The “U” to the xv234is then welded per step 11. Step 1 Step 2

R.Becker (MIT) 15/10/02 Step 3 The Step 1 components are then mounted and welded (It may be more practical that all 4 mv197 are mounted before installing the pre- welded pressure and filter units) Perform same steps for mirror side Note also, all 1/8” tubes going to the buffer volumes or otherwise (NOT SHOWN -but at the ends of all 1/4-18” reduction pieces) need to be pre-welded -the welding head will not fit later.

R.Becker (MIT) 15/10/02 4 Valve Bracket Welding Sequence Follow sequence as shown Welds 1 & 5 need attention since they may need to be done first

R.Becker (MIT) 15/10/02 4 Valve Bracket

R.Becker (MIT) 15/10/02 2 Valve Bracket

R.Becker (MIT) 15/10/02 2Valve Bracket Welding Sequence Welding follows the sequence above. Step (12)* is welded after inserting the filter into the bracket. Weld 4 in the 2nd step should be performed after the oriface/filter unit is loosely fitted into the bracket After welding is copleted RTV is injected in the Filter cavity Step 1 (Oriface/Filter Unit) Step 2 (valves) 2 valve bracket Completed

R.Becker (MIT) 15/10/02 Venting Valve Bracket

R.Becker (MIT) 15/10/02 TRD Gas System Mechanics Status R.Becker (MIT) October 30, 2002 Radiator not shown UGBS design done, commercial version being assembled Flight main plate ordered, & most flight brackets manufactured UGBS kit including welding procedures being prepared for ARDE UGBC design needs to be finalized UGBC to TRD manifold plumbing & bracketry designs needed

R.Becker (MIT) 15/10/02 UGBC (Circulation System) Status: Sealed cylindrical container design feasible –CERN welding experts state that such a cylinder can be welded cleanly. Rough mechanical design done (Right) –components arranged within boundaries (wasn’t easy) –4-valve bracket adapted from UGBS Detailed design foreseen by early December