ESS Concrete Pit Lids
2
Pit Lids Context
3
Pit Lids Context This is the Maintenance Cell, which has a number of pits in. Official - Sensitive - Commercial
4
Pit Lids Context Official - Sensitive - Commercial
5
Pit Lids Context This image shows all of the Pit Lid Sections, as Pit Lid A is replicated across all. The next slide shows each in closer detail. 2.9m 4.6m Official - Sensitive - Commercial
6
Pit Lid Variants Official - Sensitive - Commercial
7
Pit Lid Construction Currently 12mm cladding stainless steel
40mm base plate stainless steel Grapple Interface (stainless) with tie rods (D45) to base plate Heavy concrete (Magnadense equivalent) internal Rebar design similar to as shown 6mm profile tolerance for cladding Up to 23T when filled Official - Sensitive - Commercial
8
Rebar construction Official - Sensitive - Commercial
9
Prototype Single prototype of a pit lid section to be manufactured initially to check manufacturing tolerances, lifting features and load bearing capability. RACE to have close collaboration with manufacturers to monitor challenges of assembly process Also part of the prototype package: Locating ring Reinforcement bar Grapple test piece Concrete pour For more information on prototype, see market enquiry. Official - Sensitive - Commercial
10
Prototype assembly The draft assembly sequence for the prototype:
Welding 12mm stainless steel plate into cladding sides Machine 40mm base plate Place rebar cage onto base plate Install tie rods and grapple interface into base plate Weld up sides of cladding to complete outer shell Perform testing and inspection Official - Sensitive - Commercial
11
Full scope Full scope is to manufacture all pit lids once prototype has been completed. This is a separate procurement and call for tenders to be released at a later stage. Official - Sensitive - Commercial