19 Sept 2005Flavio Dal Corso INFN-Pd1 MiniCrates Status Components Status (BTIM, TRB, CCB, SB) MC production: quantity and rate, past and future Production.

Slides:



Advertisements
Similar presentations
1 Liverpool Production Status Week of 02 March 2007.
Advertisements

Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
Marzo 2004Flavio Dal Corso INFN-Pd1 Status of Drift Tubes Local Trigger Electronics.
Marzo 2004Flavio Dal Corso INFN-Pd1 Results from May 2003 Test Beam First test of all the electronics integrated in a MB1 Minicrate Items tested: Hardware.
Chubaka Producciones Presenta :.
Link Board Upscope Frascati group Napoli group Warsaw group.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Upstream PID Review at CM16 A.Bross VC September 13, 2006.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
Aprile 2004Flavio Dal Corso INFN-Pd1 Drift Tubes Local Trigger Electronics Boards Production Status.
Fgasparini LHCC Review May 041 SUMMARY: Latest results on the Minicrate performance Status of chamber production Torino line The High Voltage Boards problem/status.
1 Draft NYISO 2003 Budget Report BS&P Report to Management Committee October 16, 2002.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
Original plan for secondary line installation. Hadron hall beamlines in Phase1 Hadron hall secondary beamlines ① ② ③ ④.
Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
ERCOT Financial Summary For the Month Ended September 30, 2005
P. Shanahan June 13, Near Detector Electronics Status Status Production Issues Peter Shanahan FNAL MINOS Collaboration Meeting June 13, 2003.
AP Economics Mr. Bernstein Module 53: Profit Maximization November 4, 2014.
Budapest, September 5th, 2002 DataGrid Accounting System DGAS Current status & plans Stefano Barale INFN Budapest, September.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Compressor status AWAKE Technical Board meeting 19 August 2015.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
1 Installation Logistics Itzhak Tserruya HBD meeting BNL, July 6, 2006.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
His Story Board Monthly Theme-Focused Activities Choose Truth
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
PMO Update to PRS Troy Anderson ERCOT Program Management Office June 17, 2010.
3:00. 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
1 Drift Tubes TC activities up to LS2 1.Implement remaining Phase 1 upgrades :  in USC ⁻ TwinMux ⁻ microROS 2.Refurbish HV & LV Power Supply Systems ⁻
August Wildcat Express 8-11, Inservice Inservice Inservice Inservice ,
CMS Drift Tubes Gruppi di Bologna, Padova, Torino G.M. Dallavalle
Recommendation of Texas Test Plan Team to RMS
Agenda MC Aug 13.
ESR for the muon DT Minicrate System
Sector Collector Electronics
St. Michael’s Choir School Tuition Information Night March 24, 2011
Senior Staff Meeting November 12, 2008
CMS November Upgrade Week
Trigger Server: TSS, TSM, Server Board
Manage costs and schedules for system replacement due to obsolescence
ESR for the muon DT Minicrate System
Top Fire Protection Services Ottawa available on Dubinskyconstruction
CMS Goal of the experiment
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
RPC HV&LV status Introduction HV power supply tender
13-block rotation schedule
Planning Process Strategic Plan Operational Priorities
Irregularities in DoRIS
McDonald’s Kalender 2009.
McDonald’s calendar 2007.
Irregularities in DoRIS
Drift Tubes CSN1 1-2 April 2003 f.gasparini 22/04/2019.
Tropical cyclones movement
5th Review Committee October 4th, 2004 Facilities and Schedule C
BOARD MEETINGS Thursday, August 27th TBA NJHS MEETING SCHEDULE
Buildings Entrance Tunnel. 5th Review Committee October 4th, 2004 Buildings, Facilities and Schedule C. Sanelli.
McDonald’s calendar 2007.
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

19 Sept 2005Flavio Dal Corso INFN-Pd1 MiniCrates Status Components Status (BTIM, TRB, CCB, SB) MC production: quantity and rate, past and future Production Schedule for the near future

19 Sept 2005Flavio Dal Corso INFN-Pd2 BTIM Production completed (12500 modules). Production of spare modules (≈600) still in progress. CCB & SB Production completed (250 boards + 40 spares)

19 Sept 2005Flavio Dal Corso INFN-Pd3 TRB Produced up to now: –669 TRB Φ –333 TRB θ –65 TRB Φ32 Buffers: (≈17 MC) –82 TRB Φ –157 TRB θ –30 TRB Φ32 Problems: –Production stopped during August –Many boards (≈15%) with faults (mostly detected during pre-test). –Buffers limited by shortage of TRB Φ.

19 Sept 2005Flavio Dal Corso INFN-Pd4 MC produced up to now

19 Sept 2005Flavio Dal Corso INFN-Pd5 MC produced: details 110 MC delivered –71 installed –9 for the September installation (100% of the chambers to be installed) –21 for the November-December installation (67%) –9 for further installations.

19 Sept 2005Flavio Dal Corso INFN-Pd6 forecast for the future Note: n. of TRB expressed as n. of equivalent MC. TRB production (and manpower) are the limiting factors.

19 Sept 2005Flavio Dal Corso INFN-Pd7 Production Schedule MC to be moved to Bologna MC to be received from CIEMAT