1 RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009

2 MICE RFCC Module - Schedule Discussion – Tech BoardPage 2 Steve Virostek -- Lawrence Berkeley National Laboratory -- November 4, 2009 First five RF cavities are nearly complete Module vacuum vessel and support structure designs are done First Be windows have arrived at LBNL Final design of other components is under way (tuners, RF couplers, vacuum system,…) Construction of Module 2 components expected to be completed during FY2010 Progressing towards start of coupling coil fabrication, but there have been delays Current Status

3 MICE RFCC Module - Schedule Discussion – Tech BoardPage 3 Steve Virostek -- Lawrence Berkeley National Laboratory -- November 4, 2009 Schedule Overview

4 MICE RFCC Module - Schedule Discussion – Tech BoardPage 4 Steve Virostek -- Lawrence Berkeley National Laboratory -- November 4, 2009 Pacing item will continue to be the fabrication and integration of the coupling coils Further delay of the coupling coil schedule is considered likely First module would arrive at RAL ~5 months after first coupling coil arrives at LBNL Reassembly of the cavities into the modules will be required at RAL Key Schedule Issues