P. Shanahan June 13, 2003 1 Near Detector Electronics Status Status Production Issues Peter Shanahan FNAL MINOS Collaboration Meeting June 13, 2003.

Similar presentations


Presentation on theme: "P. Shanahan June 13, 2003 1 Near Detector Electronics Status Status Production Issues Peter Shanahan FNAL MINOS Collaboration Meeting June 13, 2003."— Presentation transcript:

1 P. Shanahan June 13, 2003 1 Near Detector Electronics Status Status Production Issues Peter Shanahan FNAL MINOS Collaboration Meeting June 13, 2003

2 P. Shanahan June 13, 2003 2 Near Detector Electronics MASTER Module MINDER Crate Trigger/Keeper MINDER modules MASTER Crate Component Count (not counting ~10% spares): 9328 MENUS 583 MINDERS 81 MASTERS

3 P. Shanahan June 13, 2003 3 Near Detector Electronics Status Schedule Status (BCWP/Total Budget): 88% (April 03) All WBS 2.3.1 system components are in production Problems with MENU startup All Printed Circuit boards in Assembly phase (or done…) Thorough checkout in progress All power supplies received/ crates in progress WBS 2.3.6 Auxillary systems (timing) *Minder Timing Modules, Clock Fanouts, Master Clock Controller done *Redesign of VME Timing Module for flexibility

4 P. Shanahan June 13, 2003 4 MENU Production Front-end daughter card Supports and reads out QIE Stores digital data in pipeline 9328 in system 1440 plus spares required for CALDET

5 P. Shanahan June 13, 2003 5 MENU Production Problems Sporadic production startup: Fabrication Solder on gold contacts – not noticed until fabrication began. Vendor has accepted responsibility: inspection+new boards Vendor inspection insufficient (no microscope on QC line!) Assembly Incorrect 1 st articles Overheated “burn-in” by vendor on 200 boards Poorly tuned initial automated optical inspection by vendor Wrong solder flux on several hundred boards All problems addressed by vendor Production has finally reached steady rate with consistent quality Much effort on 14 th floor: Lou Dal Monte, Merle Watson, Charlie Nelson

6 P. Shanahan June 13, 2003 6 MENU Good News 5000 boards in hand Checkout rate of boards with no acute problems is >90% Assumed 67% in checkout schedule Thorough checkout of all MENU functionality IIT Undergrads for Checkout Resident at FNAL for 5 weeks Will later take test-stand to IIT Very helpful in meeting CALDET schedule Long-term production Rate of 330/wk will complete production by 12/31/03

7 P. Shanahan June 13, 2003 7 Argonne Checkout MINDERS, MASTERS, KEEPERS Minders loaded with MENUs Full system tests Dave Reyna: Pedestals, DC Calibration Tests virtually all aspects of the entire system Lower Level Testing Gary Drake, Bill Haberichter, Tim Cundiff, et al. Testing all bits, reading/writing all registers, etc Checkout done with a few sets of PROMs Final PROMs will be burned post-CALDET Shipping for CALDET in progress

8 P. Shanahan June 13, 2003 8 2003 CALDET Run Sept. 4 – Oct. 4, 2003 1440 channels on Near Detector Electronics Full instrumentation of 1 side (actual ND is one sided) Near only, and Near/Far running Production calibration of Near response ND Electronics is principle focus of run Ship electronics in late June L3 milestone 7/7/03 Move to beam enclosure 8/18/03

9 P. Shanahan June 13, 2003 9 Near Detector Electronics Status ItemNumber for Detector Operation Number for CALDET Operation Assembled Number in Hand/Checked out Comments MENUs932814565000/300090% passing checkout MINDERs58391150/100Will burn final proms after CALDET KEEPERs458All/15 “ “ MASTERs811671/21 “ “ MINDER CRATEs45810Prep will do production checkout MINDER PS458All/9Prep will do production checkout MASTER CRATEs92All/11 MASTER PS92All/3 VME Timing Module1024Final Prototypes for CALDET Minder Timing Module45845/42~few need repair post-checkout Master Clock Controler11AllBeam info interface test pending Clock Fanout61AllBeam info interface test pending Spares (~10%) not included in this table. Various Auxillary cards not included All modules have CALDET quantities met

10 P. Shanahan June 13, 2003 10 Summary Near Electronics Production is Well Underway All boards in assembly (or done!) CALDET quantities are met Thorough Checkout in progress at Argonne, FNAL IIT help on MENU checkout Production appears well on schedule for detector installation


Download ppt "P. Shanahan June 13, 2003 1 Near Detector Electronics Status Status Production Issues Peter Shanahan FNAL MINOS Collaboration Meeting June 13, 2003."