Aprile 2004Flavio Dal Corso INFN-Pd1 Drift Tubes Local Trigger Electronics Boards Production Status.

Similar presentations


Presentation on theme: "Aprile 2004Flavio Dal Corso INFN-Pd1 Drift Tubes Local Trigger Electronics Boards Production Status."— Presentation transcript:

1 aprile 2004Flavio Dal Corso INFN-Pd1 Drift Tubes Local Trigger Electronics Boards Production Status

2 aprile 2004Flavio Dal Corso INFN-Pd2 Multichip Ceramic Module: 4 BTI per module. Almost half production done (~5500/12500). A lot of 2500 modules re-tested successfully by Metallux: only 5 (=0.2%) modules rejected. Results on the new glob resin top not yet available. (Works on Metallux is going on slower, as the engineer responsible of the project has left Metallux). BTIM

3 aprile 2004Flavio Dal Corso INFN-Pd3 Boards already available: –29 TRB-φ –9 TRB-θ TRB Trigger Boards. Boards available soon (by mid of May) : –50 TRB-φ –20 TRB-θ –10 TRB-φ-32 Enough for ~15 minicrates. Start of mass production foreseen for September.

4 aprile 2004Flavio Dal Corso INFN-Pd4 The 40 prototypes, foreseen at the beginning of April, are delayed to end of May. Few samples promised within the first week of May. CCB CCB link Control Boards.


Download ppt "Aprile 2004Flavio Dal Corso INFN-Pd1 Drift Tubes Local Trigger Electronics Boards Production Status."