Tuesday, February 8, 2011 GOAA CONSTRUCTION Upcoming Projects Mike Patterson, P.E. GOAA CONSTRUCTION Upcoming Projects Mike Patterson, P.E.

Slides:



Advertisements
Similar presentations
Tam Valley School Modernization - Phase 1 Summer 2011.
Advertisements

UNIVERSITY OF ALASKA FAIRBANKS Capital Projects Update Admin Services Open Forum October 11, 2011.
St. Louis Airport Authority (SLAA) Airport Experience Project Kwame Building Group Program Manager Yaphett El-Amin MWBE Program Manager.
Airport Design Consult ADC Delhi International Airport Existing International Terminal T2 Re-modelling Proposed planExisting plan.
Builders Business Breakfast, Associated Builders and Contractors
MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION
DRO AIRPORT TERMINAL EXPANSION Alliance Presentation – April 2013.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Bartholomew Consolidated School Corporation Additions and Renovations to Columbus East and North High Schools Additions and Renovations to Columbus East.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
November 14, 2014 Hobby International & IAH Terminal Redevelopment Program Update Jarrett Simmons, Assistant Aviation Director – Planning Houston Airport.
Presented to: FAA Airport Pavement Working Group By: Murphy Flynn Date: April 24, 2012 Federal Aviation Administration Construction Update.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 25, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
Renovation Update Meeting: November 11, Phasing Plan: Currently working in Phase 5, Façade 6, and Crystal Palace.
Oncor Electric Delivery Company LLC TOGETHER WE DELIVER ODESSA UPDATE Jan 22, 2013 Presentation to ERCOT Regional Planning Group Austin, TX Mike Juricek.
UN Capital Master Plan Renovation Strategy IV Version 9 August 2006 schedule (condensed)
Parsons Management Consultants – A Joint Venture
January 18, 2007 Campus Planning1 Update on Campus Planning and Construction Parnassus and Mission Bay Lori Yamauchi Assistant Vice Chancellor Campus Planning.
Central Plant Solano Nursing Sim Lab Student Union Decision Center Construction Plan Summer 2008 Bell Tower Crawl Space Data Center Upgrade.
FY 2013 Michigan Air Service Program- Airport Awareness AirportProject Description State Funding (90%) Local Share (10%)Total Alpena County Regional Airport,
Ballina Byron Gateway Airport Presentation November 2012.
2009 PACIFIC AVIATION DIRECTORS’ WORKSHOP May 4 – 6, 2009
Maryland Transportation Authority (MDTA)
AIRFIELD ELECTRICAL IMPROVEMENT PROJECTS Innovations in a Low Bid Environment John E. Joyner III, P.E. Matthew W. Kundrot, P.E. 3 October 2012 MILITARY.
SeaTac International Airport ITS Initiative ITS America 2007 June 4-6 Session 24 Hicham F. Chatila, PE, PTOE.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e U.S. Air Force Civil Engineer Center Society of American Military Engineers San Antonio Post SMALL.
Maryland Transportation Builders & Materials Association Paul L. Shank, P.E.,C.M. Chief Engineer November 14, 2014 October 30, 2014.
San Antonio Airport System Overview Presented to the Airport Ground Transportation Association September 13, 2010.
CAE: Sharing The Pride and Performance Of Our Hometown Airport February 24, 2014.
Public Border Operators Association Border Infrastructure Project Updates United States – Canada Transportation Border Working Group Meeting October 27.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
  Provide a library link at an existing campus crossroads and a new face for the combined Deering Library/ University Library complex  Strengthen the.
TRB Session January 23, 2007 Transportation Research Board Session Lessons Learned from Large Airport Development “Orlando Airport Experience”
2010 FAA Worldwide Airport Technology Conference Chicago Department of Aviation April 20, 2010.
St. Pete-Clearwater International (PIE). St. Pete-Clearwater Int’l Airport Enterprise operation supported by our own revenue sources * No county, state.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Campus Plan Roosevelt Island campus > Laboratory of innovation > Open and inviting to the public > Sustainable and energy-efficient.
Good Afternoon!. Construction Update Airside Center Roof Construction began in May Scheduled completion March.
Griffin-Spalding County Airport LPA Group Project Update Presented to September 28, 2009.
CTA CAPITAL IMPROVEMENT PROGRAM. FY FY 2019 CIP Preliminary Marks.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
Page 2 Salt Lake City International Airport – April 12, 2016 FY 2017 Budget Goals & Objectives - Budget Drivers  Implement the Terminal Redevelopment.
Columbus Airport Authority We’re Really Taking Off! November 6, 2002.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
The 14-Gate Replacement Terminal Project at Hollywood Burbank Airport Presentation to the Construction Management Associates of America (CMAA) May 26,
Department of Public Works FY Capital Improvement Program (CIP) Budget Adoption & Amendments to FY 16 CIP May 16, 2016.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
White Pigeon Community Schools
Apalachicola Regional Airport
Wilson Addition. Wilson Addition.
Capital Project Needs Assessment
Gilbert Road Light Rail Extension
IT Strategy Roadmap Template
Transportation Research Board
Joint Base Langley – Eustis Overview
McKinney Airport Master Plan Update April 3, 2018
Constructing Climate Graphs
FAY Dates School Year Traditional Fall 4x4 Spring 4x
Contract 60X10 Informational Meeting Weber I-55
Building & Property Committee
Mount Vernon Community School
FAY Dates School Year Traditional Fall 4x4 Spring 4x
Transportation vehicles
Experimental Areas – LS2 planning
Aziz AMAMOU EACM – 21th May 2019
Presentation transcript:

Tuesday, February 8, 2011 GOAA CONSTRUCTION Upcoming Projects Mike Patterson, P.E. GOAA CONSTRUCTION Upcoming Projects Mike Patterson, P.E.

Tuesday, February 8, 2011 Capital Improvement Plan

Tuesday, February 8, 2011 Highlights of Upcoming Projects BP-039, OEA Taxiway E Rehabilitation and Miscellaneous Airfield Improvements (2012) BP-402A-D, Landside Emergency Electrical Infrastructure Improvements – Phase 2 BP-402E, Airside 4 Emergency Power Infrastructure Improvements BP-411, Taxiway A Widening and Related Work (2012) BP-418, Baggage Handling System Renovation (Design/Build) BP-419, Baggage Handling System Infrastructure Renovation BP-427, CCTV Renovation BP-428, Taxiway B-2 Extension and Taxiway B-1 Rehabilitation (2011) BP-429, Enplane Drives Structural Rehabilitation E022, Airside 4 APM Switchgear Replacement V-445, Landside Level 2 FIDS Replacement (Design/Build) V-562, Hyatt Air Handling Unit Replacement - Phase 2 V-578, Hyatt Water Pipe Replacement – Phase 2 V-581, Airside 4 FIS Relocation V-582, Airside 4 HVAC Improvements V-584, Airside 4 APM Guideway Rehabilitation BP-039, OEA Taxiway E Rehabilitation and Miscellaneous Airfield Improvements (2012) BP-402A-D, Landside Emergency Electrical Infrastructure Improvements – Phase 2 BP-402E, Airside 4 Emergency Power Infrastructure Improvements BP-411, Taxiway A Widening and Related Work (2012) BP-418, Baggage Handling System Renovation (Design/Build) BP-419, Baggage Handling System Infrastructure Renovation BP-427, CCTV Renovation BP-428, Taxiway B-2 Extension and Taxiway B-1 Rehabilitation (2011) BP-429, Enplane Drives Structural Rehabilitation E022, Airside 4 APM Switchgear Replacement V-445, Landside Level 2 FIDS Replacement (Design/Build) V-562, Hyatt Air Handling Unit Replacement - Phase 2 V-578, Hyatt Water Pipe Replacement – Phase 2 V-581, Airside 4 FIS Relocation V-582, Airside 4 HVAC Improvements V-584, Airside 4 APM Guideway Rehabilitation

Tuesday, February 8, 2011 BP-039, OEA Taxiway E Rehabilitation and Miscellaneous Improvements Project Scope Rehabilitation of existing pavement for Taxiway E, area north of Runway 7-25, install airfield signage and pavement marking, and install two high mast lights on the East Ramp Construction Cost Approx. $400 K Duration Nov Jan. 2011

Tuesday, February 8, 2011 Project Scope Phase 2 of the emergency electrical distribution modifications establishes the infrastructure for security and equipment branches of the Landside Terminal and Airside 4 emergency power system Construction Cost Approx. $20+ M Duration Winter Fall 2012 Project Scope Phase 2 of the emergency electrical distribution modifications establishes the infrastructure for security and equipment branches of the Landside Terminal and Airside 4 emergency power system Construction Cost Approx. $20+ M Duration Winter Fall 2012 BP-402A-E, Landside Emergency Electrical Infrastructure Improvements – Phase 2

Tuesday, February 8, 2011 BP-411, Taxiway A Widening and Related Work BP-428, Taxiway B-2 Extension and Taxiway B-1 Rehabilitation Project Scope Widening of Taxiway A, reconfiguration of current Taxiway A- 1, and the extension of Taxiway B-2 from Runway 18L-36R to Taxiway A The extension of Taxiway B-2 from Runway 18L-36R to Runway 18R-36L and associated connecting taxiway to Taxiway B-1 and widening of Taxiway B-1 Construction Cost Approx. $10 M for each Duration Nov Dec Nov 2012 – Dec 2013 BP-411 BP-428

Tuesday, February 8, 2011 BP-418, Baggage Handling System Renovation (Design/Build) Project Scope Replacement of the baggage handling systems in the Delta, AirTran, United, and BA make-up areas Construction Cost Approx. $14 M Duration Mar – Dec Project Scope Replacement of the baggage handling systems in the Delta, AirTran, United, and BA make-up areas Construction Cost Approx. $14 M Duration Mar – Dec. 2012

Tuesday, February 8, 2011 BP-419, Baggage Handling System Infrastructure Renovation Project Scope Renovation of the infrastructure for the baggage handling systems in the Delta, AirTran, United, and BA make-up areas Construction Cost Approx. $8 M Duration June 2011 – Feb Project Scope Renovation of the infrastructure for the baggage handling systems in the Delta, AirTran, United, and BA make-up areas Construction Cost Approx. $8 M Duration June 2011 – Feb. 2012

Tuesday, February 8, 2011 BP-427, CCTV Renovation Project Scope Replacement of the Closed Circuit Television (CCTV) Monitoring System at the Landside Terminal passenger screening checkpoints and Airsides 1 and 4 FIS Construction Cost Approx. $1.5 M Duration Summer Summer Camera West Black Diamond Lane Images

Tuesday, February 8, 2011 BP-429, Enplane Drives Structural Rehabilitation Project Scope Repair to expansion joints, beam seats, and concrete elements of the enplane roadway drive, A and B sides Construction Cost Approx. $1.5 M Duration May 2011 – Nov. 2011

Tuesday, February 8, 2011 E-022, AS 4 APM Switchgear Replacement AS1 AS3 AS4 Project Scope New enclosure and electrical switchgear at Airside 4 Construction Cost Approx. $600K Duration Apr – Sept Project Scope New enclosure and electrical switchgear at Airside 4 Construction Cost Approx. $600K Duration Apr – Sept. 2011

Tuesday, February 8, 2011 Project Scope Remove existing FIDS display cabinets on Level 2 Landside Terminal. Replace with column mounted LCD FIDS at the four entry points to Level 2 from Level 3. Final Construction Cost Approx. $400K Duration Apr – Jan Project Scope Remove existing FIDS display cabinets on Level 2 Landside Terminal. Replace with column mounted LCD FIDS at the four entry points to Level 2 from Level 3. Final Construction Cost Approx. $400K Duration Apr – Jan V-445, Landside Level 2 FIDS Replacement

Tuesday, February 8, 2011 V-562, Hyatt Air Handling Unit Replacement V-578, Hyatt Water Pipe Replacement – Phase 2 Project Scope Replacement of cold water pipe. Replacement of multiple air handling units. Construction Cost Approx. $300K (Water) Approx. $600K (HVAC) Duration

Tuesday, February 8, 2011 V-581, Airside 4 FIS Relocation V-582, Airside 4 HVAC Improvements Project Scope Upgrade Hub HVAC. Relocate FIS to open concessions space in transfer level. Construction Cost Approx. $1.5M (HVAC) Approx. $200K (FIS) Duration

Tuesday, February 8, 2011 V-584, Airside 4 APM Guideway Rehabilitation Project Scope Crack sealing, crack repairs, concrete running surface sealing, concrete repairs and/or replacement Construction Cost Approx. $500K Duration October 2011 – May 2012 Project Scope Crack sealing, crack repairs, concrete running surface sealing, concrete repairs and/or replacement Construction Cost Approx. $500K Duration October 2011 – May 2012