1 Airport Design Consult ADC Delhi International Airport Existing International Terminal T2 Re-modelling Proposed planExisting plan

2 Construction Phasing: Departures Phase 1 (4 months) Decommission & demolish offices Area 1,2 and offices on upper mezzanine Area 2 Area 1 Reconfigure visitor centre. Construct new offices & retail Week 0 16 Airport Design Consult ADC Delhi International Airport Existing International Terminal T2 Re-modelling

3 Construct new Clipper Lounge on mezzanine Construction Phasing: Departures Phase 2 (4 months) Construction check in desks and belts line 2 Construction check in desks and belts line 7 Demolish airside toilets Construct new outer check in desks and belts, landside retail, airside toilets, new transfer routes Week 0 16 32 Airport Design Consult ADC Delhi International Airport Existing International Terminal T2 Re-modelling

4 Construction Phasing: Departures Phase 3 (3 months) Construct new 1 st phase emigration, customs & security in sections Decommission west transit Week 044 Demolish west retail and wall dividing pre departures from gates 16 32 Airport Design Consult ADC Delhi International Airport Existing International Terminal T2 Re-modelling

5 Construction Phasing: Departures Phase 4 (3 months) Commission part completed emigration, customs & security and west transit route Decommission existing main security Construct remaining emigration, customs & security in sections Hoard off and demolish Clipper Lounge, east retail and wall dividing pre departures from gates Week 044 16 32 56 Airport Design Consult ADC Delhi International Airport Existing International Terminal T2 Re-modelling

6 Construction Phasing: Departures Phase 5 (2 months) Commission remaining emigration, customs & security and east transit route Hoard off and construct new airside retail Week 0 64 44 16 32 56 Airport Design Consult ADC Delhi International Airport Existing International Terminal T2 Re-modelling

7 OVERALL PROJECT SCHEDULE DESIGN, DRAWINGS & SPECIFICATIONS TENDERING & FINALIZING CONTRACTOR CONSTRUCTION IN 5 PHASES AUG-SEPT 06 OCT-NOV 06 DEC 06 – MAR 08 Airport Design Consult ADC Delhi International Airport Existing International Terminal T2 Re-modelling