1 Gilbert Road Light Rail Extension
Art and Urban Design Update August 22, 2017

2 Gilbert Road Extension

3 Gilbert Road Extension
Two travel lanes on Main Street One in each direction that will widen to four travel lanes at Stapley Drive and Gilbert Road Horne roundabout Two stations Stapley Drive, east of intersection Gilbert Road, west of intersection A park-and-ride/transit center Southwest corner of Main Street and Gilbert Road

4 Remaining Construction Timeline
Utility relocation (Aug.–Dec. 2017) Roadway narrowing/paving (Sept. 2017–Mar. 2018) (final paving will be Oct. 2018) Tracks/station installation (Apr.–Dec. 2018) Construct park-and-ride (Feb. 2018–Jan. 2019) Light rail testing/operations (Feb.–May 2019*) *Estimated project completion date, subject to change

5 Horne Roundabout

6 Stapley Drive Station Design and Art
East side of station West side of station

7 Stapley Drive Station Art

8 Gilbert Road Station Design and Art
East side of station West side of station

9 Gilbert Road Station Design and Art

10 Gilbert Road Park-and-Ride

11 Gilbert Road Park-and-Ride Design Elements

12 Gilbert Road Park-and-Ride Art

13 Allen Traction Power Substation (TPSS)

14 Street Light Artwork

15 Stay Connected Visit project web page: valleymetro.org/gilbertroad
Sign up for project distribution Request a presentation

16 Community Outreach Coordinator 602.256.5811 mbook@valleymetro.org
Michael Book Community Outreach Coordinator valleymetro.org/gilbertroad


Download ppt "Gilbert Road Light Rail Extension"

Similar presentations


Ads by Google