1 The three to five year plan Facilities Management Gary Stanley, Aptakisic Tripp School District 102 Richard Cozzi, ARCON Associates.

Slides:



Advertisements
Similar presentations
Tam Valley School Modernization - Phase 1 Summer 2011.
Advertisements

The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
June 8, 2011 Irvine Unified School District. What is a Modernization? Eligibility Permanent buildings - 25 years old Portable buildings - 20 years old.
ROOM DATA SHEETS For Medical Projects using the data available from the NHS Activity Database (ADB) © Workface Solutions 2004.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
Capital Projects Investments Levy Cycle Tom O’Brien – Facilities & Operations Director February 17, 2015.
Designing the Landscape Rainier High School Landscape Design Class.
Other Types of Cleaning
May 6, 2010 Irvine Unified School District HMC Architects.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Accredited with “Distinction in Performance” St. Clair R-XIII School District.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
MCPS MAINTENANCE AND CAPITAL IMPROVEMENTS 2015 – 2016 BUDGET.
Estimating Waste Week 3 CTC-415. What is waste Waste is material that needs to be supplied but may not be used All material items except steel beams and.
Interior Lifestyles Pvt. Ltd Welcome to our six step process for Interior designing of your commercial space. 6 6.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
SUPPORT SERVICES SUMMER 2014 UPDATE August 14, 2014.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
HVACR116 – Trade Skills Mechanical Drawings.
Rio Del Oro Riverside Meadows Cobblestone. Plumas Lake Elementary School District ( Maintenance Department ) Here’s the life cycle I use for our Deferred.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
GUHSD CITIZENS COMMUNITY MEETING MARCH 24-26, 2015 Facilities and Capital Budget Overview This Presentation Will Be Posted On Our Website:
Section B Inventory Process and Forms. General Inventory Actions %Getting Started Set inventory goals and objectives %Who District Program Manager Site.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Construction Drawing Occupational Safety and Fundamentals
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
Grow Your Business 1 st Annual Building Services Outreach Session October 18, 2013.
Capital Reserves. What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs – Stormwater pond repair,
THIS IS WITH CARLIN BRIGHT Miscellaneous Orthographic Views Which Drawing Is It? Which Drawing Is It? II Past Units
The IARC Complex Annual Upkeep Estimated Cost Window cleaningLabor costs for contractor to clean interior and exterior surfaces of glass at the OTE building.
Capital Improvement Program for September 9, 2014.
Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Introduction to Plan of a building Instructor Engr Kamran Khan Department of civil engineering City University Peshawar.
Property Inspection & Analysis: The Improvements
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Ontario School Boards 72 district school boards in Ontario Approximately 4,900 schools TDSB presently operates 551 active schools Approximately 11.3% of.
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
Proposition S “Students First” Election Day, Tuesday, April 5.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Ontario School Boards 72 district school boards in Ontario Approximately 4,900 schools TDSB presently operates 551 active schools Approximately 11.3% of.
Chapter 6 Designing Recreation Facilities and Reading Blueprints.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Gates County Schools Maintenance Department Maintaining and Renovating Today’s Schools For Tomorrow’s Students.
Facility Assessment Reports FY 16 Survey Results June 9, 2016.
Facilities Focus Group
White Pigeon Community Schools
The art and science of designing and construction of buildings.
Bond Project Update September 2017
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
Accessible Environment
Fall 2017 Update: Physical properties and sinking fund
Construction Documents
(Refer to Chapter 2 of the textbook)
Dr. Joseph Meloche Superintendent of Schools Mrs
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Progress Report 11/10/11.
1 Semester Project Design A Multi Story Office Building
2018 Bond Review and Proposal
The Asset Management Journey for Building Assets
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Stoughton Public Library
Moving from Consumers to Producers Kings Park Central School District
Presentation transcript:

1 The three to five year plan Facilities Management Gary Stanley, Aptakisic Tripp School District 102 Richard Cozzi, ARCON Associates

2 Project Goals to begin or improve your long term plan  Ultimate goal of project: to have a plan…. 1,2, or multi years  Preparing for the annual budget process.

3 Description You need a long term plan. You need to gather data. You need to start working on it. You need to sort out your facilities.

4 Analysis Gathering the right data…… Who are going to get this data from? Start with just one building and one base.

5 Data Base, what do I gather? Break the site and building down to its “PARTS” DIY, maybe? Who can help? 10 year life safety survey, Architect Maintenance staff

6 Team/Resources Resources allocated to this project –People –Equipment –Locations –Support & outside services –Stakeholders

7 When I am done Decide what you want to get out of this report. Do I want to have for internal, D/O level? Do I want this for Facilities Staff? Do I want this for A/E long term?

8 Schedule Collection of data will take time Decide how much to collect in each phase JanFebMarAprMayJunJulySepOctNovDec Phase 1 Phase 2 Phase 3

9 Break it down Start outside I used two areas to begin  The building “site” The lay of the area of the site  The building “exterior” What is the exterior, or building envelope

10 Site consists of these types Asphalt areas Playgrounds Concrete Fences Lawn areas Landscaping Lighting Site furnishings

11 Breakdown of site items Asphalt = parking, pathways, playgrounds Playgrounds = surfaces, mulch, equipment Concrete = walks and other surfaces Fences = simple… fences Lawn = areas around building set as lawns Landscaping = those items of ornamental valve Lighting = parking lots and walkway lighting Site furnishings = sculptures, signs, seating,

12 Exterior consists of these types Masonry Doors/frames/hardware Siding Roofing Windows / glazing

13 Breakdown of exterior items Masonry = the brick building and its parts; joints, sills, lintels Doors = the complete entrance/exits to the facility Siding = types or when on the facility Roofing = that which is on top Windows = the windows or glazed areas.

14 Take interest in the past to predict the future In each of my sections I begin with the History/Condition. This allows me to tell the reader what we know about the past of each of these areas. And… what the future plan looks like

15 Aptakisic Junior High Building Site Summer 2010 Asphalt areas, parking, pathways, playground History/Condition The general asphalt drive and parking areas are in good condition. Asphalt areas received crackfill and sealcoat summers 2005, Each year either crackfill or crackfill/seal is applied for maintenance to the asphalt surfaces. The front drive shows signs of alligatoring and may need to be replacement/resurfaced in future years. The track was sealcoated summer 2008, Future plan: Crackfill/Sealcoat $13,000 Playground Surface (rear Southeast units) History/Condition The playground surface is wood chips. Each year the surface is topped with additional chips as site maintenance. Future plan: Mulch $1,500 Playground Equipment (rear Southeast units) History/Condition The existing playground is a mixture of various units, swings, and older wooden climbing equipment. The equipment is in good condition but showing signs of age.

16 Interior breakdown Use these items for your interior inspections Wall surfaces, Ceiling surfaces, Floor surfaces; carpet, hard, Gym floors, Interior doors and hardware, Washrooms, Main office areas, and Gym or other special rooms

17 Then break out your building components General lighting, emergency lighting, exit lighting, electrical systems, CTTV Fire alarm system, security system Plumbing – general, fixtures Hot water system, food service equipment, curtain walls, casework, furnishings and storage areas.

18 Then break out your building components, continued This last area, is one which details out the mechanical equipment, in the boiler room or mechanical space or roof i.e. Rite boiler # 1……. Air compressor

19 Estimates of needs Use your staff, contractors, architects, engineers to Value the “needs” Put them in a spread sheet Use this to add up your needs.

20

21 Uses: BoE, Budget, Public Once the LRP is developed, plan to update it every year. The first one is the toughest. Print, distribute and reference regularly.

22 Questions? Thank you Gary Stanley, Rick Cozzi