IT-3872 Refurbishment of the piping of the chilled water circuit of the Proton Synchrotron Alexandre Broche EN-CV-PJ.

Slides:



Advertisements
Similar presentations
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Advertisements

Furniture and Screens RAF/2012/00026 Compulsory Briefing Session 01 October 2012 RAF – EcoGlades Centurion.
Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
BIDDERS’ CONFERENCE IT-3980 Replacement and Supply of Electrical Overhead Travelling Cranes up to 10 Tons Capacity March 20th 2014 Handling Engineering.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Invitation To Tender Procedure IT – 4005/en Provision of engineering studies and drawings, the supply and installation of piping and its accessories.
Detector Cooling Project Thermosiphon Project Status Report
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke.
IT-4103/EN Bidder’s conference Technical Specification for the Design, Supply, Installation and Commissioning of an HVAC system, a Smoke Extraction system.
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF HEATING, VENTILATION AND AIR-CONDITIONING (HVAC) SYSTEMS FOR THE PS ACCELERATOR INFRASTRUCTURE TENDERING.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
Update on the Laser Beam Line
Sydney (02) Melbourne (03) Brisbane (07) Carlo Biaro Capital Insight Conference 2013 – Tools and.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
LS2 Cooling & Ventilation Activities M. Battistin EN/CV Acknowledgements: P. Barriere, R. Bozzi, A. Broche, O. Crespo,
EN/CV/DC IT-3673 Presentation done by Elena Perez Rodriguez For further information contact For the purchase of cooling fluids.
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
Engineering Department EN 1 IT3853-EN Design, Supply of Ventilation Units and Smoke Extraction Systems for Building 192 Bidder’s conference – 29 th April.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4134/EN/LHC Supply and Commissioning of HVAC Systems for Five LHC Surface Buildings B.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
IT-4014/EN/NA62 Technical Specification Dismantling, Design, Supply and Installation of a Ventilation and Air Conditioning System for ECN3, TCC8 and GHN300.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
IT-3963/EN Bidder’s conference Design, supply, installation and commissioning of the cooling system for the NA62 Gigatracker Tuesday 10 December 2013 Building.
CONSTRUCTING WEST MIDLANDS Question & Answer Session 22 nd March 2011 LOT 7 – CAPITAL WORKS.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4154/EN Supply Centrifugal Water Pumps B. Jenssen
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015.
PS CHILLED WATER PROJECT SHUT-DOWN WHY? THE AGE OF THE PIPING - installed in years ago - technical life of piping normally years.
Update on the PSB Cooling and Ventilation Systems
Demineralised water cooling system
CBETA Technical Review
IT-4189 Supply and installation of a cryogenic distribution system
INVITATION TO TENDER PROCEDURE IT-4344/EP Design, Supply, Installation, Testing and Commissioning of a Cleanroom extension for the integration of ATLAS.
Furniture and Screens RAF/2012/00026 Compulsory Briefing Session
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
SPS cryogenic proximity equipment and SM18 validation
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Cooling systems for HL-LHC (WP17.3)
EN-CV interventions during EYETS for PS and PSB
Bidder’s conference – 21st May 2013
Low temperature chiller Market Survey
13-block rotation schedule
Information and Site Visit for tender: “supply and installation of furniture and related services” EIOPA/OP/50/2014 Frankfurt, 12 May 2014.
Strategic Planning Timeline Overview
February 2007 Note: Source:.
5th Review Committee October 4th, 2004 Facilities and Schedule C
Specifications What should it cover Goods Services Warranty
Buildings Entrance Tunnel. 5th Review Committee October 4th, 2004 Buildings, Facilities and Schedule C. Sanelli.
IT-4464/EN Bidders conference
2015 January February March April May June July August September
Presentation transcript:

IT-3872 Refurbishment of the piping of the chilled water circuit of the Proton Synchrotron Alexandre Broche EN-CV-PJ

Introduction 21 October 2012IT Bidder’s Conference  Technical Contacts:  Alexandre Broche  EN-CV Projects Team  Michele Battistin  EN-CV  Commercial Contacts:  Bjorn Jenssen  FP-PI  Ivo Lobmaier  FP-PI

Agenda 3IT Bidder’s Conference1 October :00 – 09:30Introduction to CERN and of the Technical Specification(A. Broche) 09:30 – 12:30Visit of the existing installation(A. Broche) 12:30 – 13:30Lunch break 14:00 – 14:40Presentation of commercial documents(B. Jenssen) 14:40 – 15:00Relations with host states(TBD) 15:00 – 15:15Coffee break 15:15 – 15:45VAT and customs(T. Wegelius) 15:45 – 16:15Questions – Answers(A. Broche) 16:15 – 17:00Closing of the conference and return to reception

Introduction to CERN and the technical specification Alexandre Broche EN-CV-PJ

Overview 5  Introduction to CERN  Documents –P&ID’s, specification, annexes  Important points  Questions and answers 1 October 2012IT Bidder’s Conference

CERN 61 October 2012IT Bidder’s Conference  20 Member states  Particle accelerators and experiments

The CERN Sites 71 October 2012IT Bidder’s Conference  Project location: buildings 150, 351, 354, 355  Meyrin, Switzerland  EN-CV – Bldg. 35  FP-PI – Bldg. 5

Tender Documents and Drawings 81 October 2012IT Bidder’s Conference DocumentDescription IT-3872Technical specification Annex 1Technical Prescriptions for Piping and Accessories Annex 2Technical Prescriptions for Instrumentation Annex 3Technical Prescriptions for Electricity Annex 4Technical Prescriptions for Identification Annex 5Technical Prescriptions for Testing, Inspecting, and Commissioning the Hydraulic Installation Annex 6Portfolio of photos

Tender Documents and Drawings 91 October 2012IT Bidder’s Conference ReferenceNumber / Title 1CV Chilled water general distribution P&ID 2CV CV CV CV CV CV CV CV

101 October 2012IT Bidder’s Conference  Work Package 1 –Supply to the synchrotron loop and ventilation rooms ( and 355-R-012)  Work Package 2 –Distribution pipeline in Building 150  Work Package 3- Building 354  Work Package 4- Tunnel Linac ventilation  Work Package 5- Heat exchangers in Building 351 The Scope

111 October 2012IT Bidder’s Conference

The Schedule 121 October 2012IT Bidder’s Conference Progress MilestonePlanned Dates Delivery of the documents as per § January 2013 Start of the Work Package 1 06 May 2013 Completion of Work Package 126 July 2013 Start of the Work Package 2 06 May 2013 Completion of Work Package 226 July 2013 Start of the Work Package 308 April 2013 Completion of Work Package 328 June 2013 Start of the Work Package 422 July 2013 Completion of Work Package 4 20 September 2013 Start of the Work Package 522 July 2013 Completion of Work Package 5 20 September 2013

Particular Notes 131 October 2012IT Bidder’s Conference  Design and Build project from existing installations  Each work package has specificities  It is of primary importance to respect the schedule and CERN Specific rules: “Working on CERN site”

Questions and answers 141 October 2012IT Bidder’s Conference  Questions ?