Presentation is loading. Please wait.

Presentation is loading. Please wait.

Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.

Similar presentations


Presentation on theme: "Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and."— Presentation transcript:

1

2 Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and identify its purpose according to their student guide by answering 4 out of 5 questions – Given a P&ID, locate the revision block and identify its purpose according to their student guide by answering 4 out of 5 questions Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and identify its purpose according to their student guide by answering 4 out of 5 questions – Given a P&ID, locate the revision block and identify its purpose according to their student guide by answering 4 out of 5 questions

3 – Given a P&ID, locate the notes section and identify its purpose according to their student guide by answering 4 out of 5 questions – Given a P&ID, identify the sheet reference numbering procedure for P&IDs according to their student guide by answering 4 out of 5 questions – Given a P&ID, locate the notes section and identify its purpose according to their student guide by answering 4 out of 5 questions – Given a P&ID, identify the sheet reference numbering procedure for P&IDs according to their student guide by answering 4 out of 5 questions

4

5 A – Architectural C – Civil Engineering (Site Grading, Paving, utility lines, drainage, etc) D – Mechanical Process (Piping and Instrument Diagrams) E- Electrical Engineering F – Process (Flow Diagrams) G – General Arrangement H – Heating, Ventilation, and Air Conditioning I – Instrumentation and Control K – Fire Protection L – Plumbing M – Mechanical Engineering P – Piping Design S- Structural Engineering (Steel and concrete structural details) T – Telecommunications V – Vessels (Tanks) Z- Project (General drawings, legends, schedules, indexes, etc.) A – Architectural C – Civil Engineering (Site Grading, Paving, utility lines, drainage, etc) D – Mechanical Process (Piping and Instrument Diagrams) E- Electrical Engineering F – Process (Flow Diagrams) G – General Arrangement H – Heating, Ventilation, and Air Conditioning I – Instrumentation and Control K – Fire Protection L – Plumbing M – Mechanical Engineering P – Piping Design S- Structural Engineering (Steel and concrete structural details) T – Telecommunications V – Vessels (Tanks) Z- Project (General drawings, legends, schedules, indexes, etc.)

6

7

8

9

10 Project Numbers 256 Pepper Research Chemical Plant 257 Mammoth Mountain Plant 258 Unalaska Nuclear Plant Project Numbers 256 Pepper Research Chemical Plant 257 Mammoth Mountain Plant 258 Unalaska Nuclear Plant

11 Project Stage Designation RD – Research and Design CO - Construction SS – Systemization and Start-up MS – Maintenance and Servicing Project Stage Designation RD – Research and Design CO - Construction SS – Systemization and Start-up MS – Maintenance and Servicing

12 Document Type M2 – Catalyst & Chemical Summary M4 – Heat & Material Balance M5 – Flow Diagram M6 – P&ID Document Type M2 – Catalyst & Chemical Summary M4 – Heat & Material Balance M5 – Flow Diagram M6 – P&ID

13 System Locator M01 – Heating and Ventilation Systems M02 – Water and Sewage Systems M03 – Breathing Air System M04 – Electrical Power Supply System System Locator M01 – Heating and Ventilation Systems M02 – Water and Sewage Systems M03 – Breathing Air System M04 – Electrical Power Supply System

14 Discipline Code M – Maintenance Operations S – Support Operations E – Engineering Operations Discipline Code M – Maintenance Operations S – Support Operations E – Engineering Operations

15 Drawing Sequence Number 1 through 899 – Building, Area, System Drawings 900 through 999 – Common Drawings 9000 series - New drawings Drawing Sequence Number 1 through 899 – Building, Area, System Drawings 900 through 999 – Common Drawings 9000 series - New drawings

16 Drawing Revision Number 000 – First publication of drawing 001 – First published change 002 – Second published change Drawing Revision Number 000 – First publication of drawing 001 – First published change 002 – Second published change

17

18

19

20

21 Title Block Revisions Block Notes Block Sheet Reference Number Title Block Revisions Block Notes Block Sheet Reference Number


Download ppt "Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and."

Similar presentations


Ads by Google