Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.

Similar presentations


Presentation on theme: "Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s."— Presentation transcript:

1 Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s conference – 28 th November 2014 Y. Body / EN-CV

2 Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN

3 Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN

4 Engineering Department ENEN ENEN INTRODUCTION: CERN

5 Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN

6 Engineering Department ENEN ENEN INTRODUCTION: SR8 Facility

7 Engineering Department ENEN ENEN INTRODUCTION: SR8 Facility

8 Engineering Department ENEN ENEN INTRODUCTION: SR8 Facility R-401R-402 R-403

9 Engineering Department ENEN ENEN INTRODUCTION: SR8 Facility – Former ventilation system

10 Engineering Department ENEN ENEN INTRODUCTION: SR8 Facility – Former ventilation system

11 Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN

12 Engineering Department ENEN ENEN Two AHUs: one in R-401 and one in R-403 R-402 Alcove used for decompression R-403 R-401 R-403 NEW VENTILATION SYSTEM R-402

13 Engineering Department ENEN ENEN Two AHUs: one in R-401 and one in R-403 R-402 Alcove used for decompression NEW VENTILATION SYSTEM

14 Engineering Department ENEN ENEN R-401, R-403 alcoves Air Handling Unit Sepcial shape part between AHU and mixing chamber including the air tight access door Return air grille (UQGN) Fresh air intake (UQCF) Fresh air damper (UVUM) Return air damper (UVUM) Pre-filtration (UFPZ) NEW VENTILATION SYSTEM

15 Engineering Department ENEN ENEN R-402 alcove Exhaust air grille (UQCF) Exhaust air grille (UQGA) Exhaust air dampers (UVUM) Opening closure NEW VENTILATION SYSTEM

16 Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN

17 Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Items supplied by CERN CERN will provide the control software based on the I/O list and functional analysis provided by the Contractor

18 Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Design criteria and conditions

19 Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Applicable Standards, Rules, Regulations

20 Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Applicable Standards, Rules, Regulations Halogen forbiden Possible derogation for very small parts AHUs: total amount of halogeneted material to be indicated in the tender

21 Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Responsibility for the Design

22 Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Documentation Including power and control cubicles schematics

23 Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Documentation

24 Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Documentation

25 Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Delivery schedule

26 Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Tests 1. I/O testing with basic PLC standard software suite (done by the Contractor) Power available in the cubicles and all equipment cabled to the PLCs Supplier able to charge the basic PLC configuration and test all I/Os from within the software 2. I/O testing with CERN software (done by CERN with presence of Contractor) Test report from phase one validated by CERN Setup of instrumentation is finished (scaling of analog probes, pressostats, …) All hardware responding to commands Contractor able to force all I/Os electrically 3. Functional testing with CERN software (done by CERN with presence of Contractor) All hardware and instrumentation operating according to specifications (failsafe positions on dampers, electrical equipment protections all working, etc) Ability to run the units and test regulation loops 4. Commissioning (done by CERN with the presence of Contractor) Installation able to work at the design envelope conditions (nominal flow and power, …)

27 Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN

28 Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 1 – Panel of the AHUs

29 Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 1 – Measuring section

30 Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 1 – Electrical heaters

31 Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 1 – Chilled water coils Copper pipe with a thickness of 0.89mm allowed Given the existing room dimensions, higher air velocity allowed (<3m/s)

32 Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE PLAN

33 Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 2 – Instrumentation

34 Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE PLAN

35 Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 3 – Electricity

36 Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN

37 Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 4 – Identification

38 Engineering Department ENEN ENEN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN

39 Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 5 – Tests and Inspection performed on Contractor’s Premises As per section 4.3.1 of the Technical Specification

40 Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN

41 Engineering Department ENEN ENEN Thank you for your attention!