GLOBAL LIFT CORP COMMERCIAL SERIES PORTABLE KIT Portable Kit - www.globalliftcorp.com.

Slides:



Advertisements
Similar presentations
RP4A 2½ – 6. Modification Overview Production of the RP4A series began in Production of the RP4A series began in A Lead free version (4ALF)
Advertisements

RP4AN 21/2 – 6. Modification Overview Production of the RP4AN series began in Production of the RP4AN series began in The 4AN indicates an.
Levolors New Size-In-Store Blind Cutting Machine.
#30 Ignition/Starter Switch #54 To Radio Fuse 1 Instrument Power Ignition Coil Red wire with bullet Long black wire with bullet. Wire was.
Sectional Assembly and Installation
GOODSON Tools and Supplies for Engine Builders Calibrating and Maintaining Your Precision Machinists Level.
CARTRIDGE SEAL INSTALLATION. CHECK PUMP SHAFT FOR BURRS CHECK GLAND BOSS FOR NICKS LUBRICATE SECONDARY SEALS SLIDE SEAL ONTO PUMP SHAFT ASSEMBLE PUMP.
Motor number located on the clutch housing.
Motor Propeller wrench Screw Nut (2) Cylinder top Tiny screw IGNORE:
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
RockOn! Canister Integration RockOn! 2009.
are included in this kit.
A-dec 300 Dual Mount on 500 Installation. Agenda ► General Information ► Recommended tools ► Installation ► Follow through install guide ► Hands-on install.
Lock Replacement. Step 1: Cut insulation behind lock mechanism.
Machining a V-Block Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved. 1.
Wheelchair Lift Training
MER/SUP 1 DOOR EVAPERATOR DRAIN PAN REPLACEMENT 1. Remove the (4) screws that secure the evaporator coil, using a 5/16” socket.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Presented by: Ginnette Clark Terri Hall Robert Ishmael Michael Petry.
RPDA 4A 2½” – 6”. Modification Overview  Production of the RPDA 4A series began in  The RPDA 4A can utilize either a Type I or Type II bypass.
January 7, 2013 Changing or replacing G460 sensors Slide 1 November 9, 2012 Changing or replacing G460 sensors.
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Global Lift Corp Understands that there will many questions Asked in regards to ADA Laws, this will guide you along The way of.
American Electrical, Inc. Junction Box / Hookup Box Fast and easy way to make electrical connections An assembled kit – no need to procure and assemble.
General idea of a couple of check rod system and adjustments
COMMERCIAL SERIES TRI-POINT ANCHORING SYSTEM
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
10 Easy steps to building your computer By Chris Holzworth & Michael Barnett.
DROP IN ANCHOR DETAIL COMMERCIAL SERIES LIFTS INSTALLATION MANUAL Drop In Anchor/COMMERCIAL SERIES.
Installation. Indoor Unit Installation Typical Installation.
How to Build Your Playhouse. September 08, 2006 By Kay Adams, Tamecha Buck, Janet Herron & Lisa Weston “Click on pictures”
350, 350A 2½”-12”. Modification Overview  Production of the 2½ - 10” sizes began in  Production of the “A” models began in This Indicates.
Remove the seats from the car, there is no easy way to do this. Flip it up side down so it looks like [1] Both sides are done exactly the same, so.
765 ½”- 2”. Modification Overview  Production of the 765 began in 1975 and is current.
LAB #9 Valve Head replacement. Insert the valve. Make sure that the cap goes on the intake valve. Insert the springs. Insert the keeper.
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
Installing a single Dreamscreen Set unit in place and attach with 2 ½ “ screw. Do not tighten the screw yet, tighten just enough to keep from falling.
Focusing Lighting Instruments THE107. Focusing Lights This presentation will walk you through the basic steps of focusing a theatrical lighting instrument.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
LAB #10. Governor Control Arm Using a 10mm socket install the two bolts that hold the governor control arm. Finger tighten then torque to 100 “#
Easy Reach 7.0 Honda Element Packing List QtyDescriptionPacked 115ft 10ga Red Wire 16ft 10ga Black Wire 140amp Breaker 23/8 Yellow Ring Terminals 25/16.
Twin Spine Installation. Installation of a Twin Spine is very simple and easy. Before you begin, make sure you have a copy of the installation instructions,
450 4”-10”. Modification Overview  Production of the 4” - 10” sizes began in  The lead free version (XL) was introduced in 2011.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Description of Hand Tools Tools help us do work and make things. Tools.
Section 2 Safety, Tools and Equipment, Shop Practices Unit 6: Fasteners.
RockOn! RockOn! Structure Build RockOn! 2009.
Getting Back On the Road Again After a Flat Tire October 2011.
VIEW SERIES with Sliding Door
Today’s Plan Fasteners Threading Fasteners.
INSTALLING BYRNE POWER BOX INTO FLEX SYSTEM
009 2½”-3”.
RPDA 4AN 21/2” – 6”.
Square Tube Shaft Connecting Both Gear Drives.
DCDA4AN 2½” – 6”.
Simple Way to Install Auto Lock Door in Car
Assembly instructions for M-K all bolt together hoppercone kit.
W201 3R hardboard Replacement Procedure.
Disassembly and Assembly of A900C-W Electronic Governor Actuator for P8 Fuel Injection Pump
LF856 2½”-10”.
Step 1:Disassemble battery case
DC4AN 2½” – 6”.
Thank You For Purchasing Coeur Designs 11” Shower Extension
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Beginner Stander Presentation
Presentation transcript:

GLOBAL LIFT CORP COMMERCIAL SERIES PORTABLE KIT Portable Kit -

COMMERCIAL SERIES PORTABLE KIT PARTS LIST Portable Kit – 1/4 x 3/4” Carriage Bolts 8 – Lock Nuts 2 – Stabilizer Bars 1 – Lifting Unit 4 - Screws **Please check your contents prior to installation**

Portable Kit - COMMERCIAL SERIES PORTABLE KIT EASY INSTALLATION INSTALLING THE STABILIZER BARS 1.Insert the four 1/4 x 3/4 carriage bolts (provided) from underneath the lift in the pre-punched square holes on both ends of the lift. 2.Place the two stabilizer bars onto the bolts. 3.Place the Lock nuts on and tighten down Stabilizer Bars

Portable Kit - COMMERCIAL SERIES PORTABLE KIT EASY INSTALLATION INSTALLING THE LIFTING UNIT 1. On the “opposite” side of the stabilizer bars locate the four pre-punched square holes. 2. Place the four 1/4 x 3/4” carriage bolts (provided) in the pre-punched square holes from underneath the lift. 3. Place the lifting unit on the bolts 4. Place the lock nuts on and tighten securely. 5. Place the lifting unit’s cover on and secure with screws provided. Lifting Unit

Portable Kit - COMMERCIAL SERIES PORTABLE KIT EASY OPERATION OPERATING THE COMMERCIAL SERIES PORTABLE KIT Once you make sure all the components are securely fastened, Locate the operating handle on The portable kit. When your lift is in use, the portable kit should be in the up Position and the lift is secured to the deck with the 3 anchor Bolts. Once you are ready to store your lift, remove the 3 Anchor bolts, push down on the Lifting Unit’s handle, the lift will raise and then you are able to roll with ease to your storage location.