© 2006 BEI Technologies 1-800-ENCODER, www.beiied.com Installing the LN Linear Encoder Note: The following installation example is for demonstration purposes.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

J.P. Langston Brake Retrofit
Zebra® 105SL™ * Removing and Installing Printhead
1 Stripe 400/600 Removing and Installing Printhead Printhead Resistance Calibration Toggle Position Adjustment.
Instructions for making plunger fork tool. Drawing for the trigger assembly.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
HOB 2013 Body Mechanics The back you save can be your own.
Safely Using Drill Collar Clamps
Workshop Safety Lee McNeil, mentor of the Skagit Valley (WA) SeaTech 4-H ROV teams, developed the following placards, which he attaches to the tools in.
Installing a double Dreamscreen. Check measurement Left.
Manufacturer’s Recommendation for Setting up a Theodolite 1)Ensure that :- the tripod head is approximately level the tripod feet are firmly fixed in the.
Ropes and Knots Skill Drills.
Breaking, Measuring, and Adjusting Chain ~The most used drive system on a FIRST robot uses chains and sprockets. Understanding the proper techniques to.
Honda 450 Installation Manual.
Installation. Indoor Unit Installation Typical Installation.
Lock Replacement. Step 1: Cut insulation behind lock mechanism.
Laser Enclosure to Elevated Rail Assembly Wyman Gordon Forging Locator Original Revision: 2/14/2013.
Cutting With a Jeweler’s Saw
Volvo 270 Outdrive R&R (for bellows replacement)
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Honda Recon TRX-250 Installation Manual. STEP 1: Remove rear tires and install axle spacers. Use blue thread locker and tighten lugs to ATV specification:
Print Head Removal, Replacement and Alignment. Page 2 CONFIDENTIAL Print Head Assembly Removal  Turn off printer A.C. power  Unplug the printer from.
Robot Quick Build Session Frame Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.
Typical Walk-in Closet with elfa® décor
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
RIGHT HAND CARTRIDGE UNIT AS CAN BE SEEN FROM THE PHOTOGRAPH,THE UNIT IS OFFERED UP TO THE END OF THE BED AND MARKED THROUGH AT LEAST THREE POINTS FOR.
Mer/Sup. 2 & 3 Door Evaporator Coil Repositioning Procedure S. Starnes 7/11/03 1. Remove the 2 screws holding one end of the evaporator coil. (view shows.
Air tank installation instructions Included parts: Raw aluminum air tank bracket 5/16-18 button head bolts (qty 4) M8x1.25 button head bolts (qty 4) M8.
1 V1.00 © 2009 ZelFlex QR Quick Released double-sided mechanical stretching frame Step by step User guide.
1 Zebra 170 XiIII Plus Removing and Installing Printhead Calibrating Head Resistance Print Quality Adjustments.
Architectural Drafting Equipment
Hoop Tech Clamp Assembly and Attachment. Contents of package.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Manufacturer’s Recommendation for Setting up a Theodolite
General idea of a couple of check rod system and adjustments
Installation. Indoor Unit Installation Typical Installation.
Wheel Bearing Service. - Remove the cap using a flat head screw driver or pipe pliers. Careful not to damage the cap.
Shaft Alignment Nizwa College of Technology.
Lab 3 - Centering. Centering; or the smart way to align centered optical elements and systems This lab will make use of concepts used in the previous.
1 66 blocks are prevalent in the telecommunications industry Today they are used primarily for phone applications only 66 blocks are prevalent in the telecommunications.
Living with the lab Attaching Arduino to Boe-Bot Chassis © 2012 David Hall.

Drill Press Operations
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
FTOF – CABLE RUNS Joe Guerra. Terms/Definition FTOF – Forward Time of Flight PCAL – Pre-shower Calorimeter PMT – Photo Multiplier tube Panel 1A – Existing.
Chapter 2 Architectural Drafting Equipment. 2 Links for Chapter 2 Drafting Supplies Drafting Instruments Drafting Machines.
Installation. Indoor Unit Installation Typical Installation.
Milling and grinding machine
Please read all the instructions carefully before the installation. Installation shall be carried out by experienced mechanic. Follow the steps in the.
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
Ropes and Knots Skill Drills.
Manufacturing Technology HPEDSB
Remove the seats from the car, there is no easy way to do this. Flip it up side down so it looks like [1] Both sides are done exactly the same, so.
1 Remove seat from vehicle and remove seat trim cover.
Installing a single Dreamscreen Set unit in place and attach with 2 ½ “ screw. Do not tighten the screw yet, tighten just enough to keep from falling.
LAB #10. Governor Control Arm Using a 10mm socket install the two bolts that hold the governor control arm. Finger tighten then torque to 100 “#
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
Mechanisms considered to be an assembly of mechanical items designed to achieve a specific purpose within a machine.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Assembly Instructions:
INSTALLING BYRNE POWER BOX INTO FLEX SYSTEM
ENGINE MODE CODES.
Next Slide Introduction to the Drill Press Created by Mr. Heck.
AU Media/ER/Toyota/Tech/Gen 7/06 Toyota Tundra
Prototyping with Sheet Metal
FIRST Long Island Presented by School-Business Partnerships of Long Island, Inc.
Activity 4.2.8d Satellite Flight Path Construction Guide
Topic of assignment. Shaper machine. Construction. Working principle.
Diaphragm Valve Maintenance Instructions
Presentation transcript:

© 2006 BEI Technologies ENCODER, Installing the LN Linear Encoder Note: The following installation example is for demonstration purposes only and may not reflect your exact installation requirements.

© 2006 BEI Technologies ENCODER, Installing the read head

© 2006 BEI Technologies ENCODER, Correct Read head alignment Read head must be parallel to the axis of travel to within ± 0.002” Readhead (Front) Top Axis of travel

© 2006 BEI Technologies ENCODER, Incorrect Read head alignment Damage to scale and / or read head imminent! Readhead (Front) Top Axis of travel

© 2006 BEI Technologies ENCODER, Traverse system to extreme limit opposite cable exit Front view Top view

© 2006 BEI Technologies ENCODER, Gently run scale through read head Front view Top view

© 2006 BEI Technologies ENCODER, Slide scale support clamp onto scale end Front view Top view

© 2006 BEI Technologies ENCODER, Transfer punch through link Front view End view

© 2006 BEI Technologies ENCODER, Drill and tap at mark Front view End view

© 2006 BEI Technologies ENCODER, Install support pillar, then loosely attach scale bracket Front view End view

© 2006 BEI Technologies ENCODER, Gently slide scale through read head and left support Front view End view

© 2006 BEI Technologies ENCODER, While sliding scale back and forth, tighten support in place on pillar Front view End view Tighten clamp screw

© 2006 BEI Technologies ENCODER, Remove scale, traverse system to extreme limit toward cable exit Front view Top view

© 2006 BEI Technologies ENCODER, Front view Top view Gently run scale through read head

© 2006 BEI Technologies ENCODER, Front view Top view Slide scale support clamp onto scale end

© 2006 BEI Technologies ENCODER, Transfer punch through link Front view End view

© 2006 BEI Technologies ENCODER, Drill and tap at punch mark Front view End view

© 2006 BEI Technologies ENCODER, Install support pillar, then loosely attach scale bracket Front view End view

© 2006 BEI Technologies ENCODER, Slide scale through read head and support Front view End view

© 2006 BEI Technologies ENCODER, While sliding scale back and forth, tighten support in place on pillar Front view End view Tighten clamp screw

© 2006 BEI Technologies ENCODER, Gently run scale through support, read head and opposite support Front view Top view

© 2006 BEI Technologies ENCODER, Tighten scale clamp at left end Front view Top view

© 2006 BEI Technologies ENCODER, Snug up scale clamp at right end Front view Top view

© 2006 BEI Technologies ENCODER, If you need further assistance installing your BEI linear encoder, please contact us ENCODER