IBL Vacuum Box in UX15 Short summary Andrzej Zmuda

Slides:



Advertisements
Similar presentations
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI.
Advertisements

M.N Minard SPD cabling overview SPD cable chain & tray SPD cable chain & tray Motorisation PS/SPD Motorisation PS/SPD Work on PS Work on PS.
MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Agenda: First steps using WinCC OA First steps using UNICOS V5 Vacuum Test Rig Principles of.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
EE and SE Installation Wolfgang Funk - CERN CMS 11/9/ ) Introduction 2.) Installation scenario 3.) SE schedule, manpower, cost estimates 4.) EE.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Installation Erik Johnson ASD Deputy Director and Interface Manager NSLS-II CFAC Meeting November 9-10, 2009.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
LHC scheduling applied to CLIC and ILC TILC09 & GDE AAP review – Tsukuba April 2009 K. Foraz K. Foraz - CERN TILC09 & GDE AAP review – Tsukuba April 2009.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
Tracker Summary Alan Bross MICE CM October 10, 2007.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.
PHOS progress in LS1 Alexander Vinogradov 11 August 2014.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
LAr Week Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test.
V. Bobillier1 Cable installation status.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Gas Coordination Meeting Cabling. General Philosophy Cables between racks within the Surface Gas Building or between racks within the Underground Gas.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
Overview of recent CO 2 cooling developments As an example for LHCb-Velo and UT cooling? Kick-off meeting 28 may 14 Bart Verlaat 1.
ACS news RF cabling campaign: DONE Final tests cavity tuning motor (ctrl): in progress recabling software upgrade Water cooling: ADT static pressure test:
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
News and Introduction from CERN June 15th, 2005
RF Retrofit Kit installation guide
MICE Target Report Video Conference 29/11/07
News about the WA104 Programme
Teleconference ACS – FREIA 10th May 2017
Update on the IBL vacuum flex transfer lines
IBL CO2 cooling control system development status
Integration – preliminary ideas on routing and tests
EN-STI activities in LHC during EYETS
Renovation of the 45-year old PS magnets
From Design to Installation courtesy R. Folch S. Atieh TS / MME
WP02 PRR: Master Oscillator and RF Reference Distribution
Far Detector Activities Late 2017 – Early 2018
Update on the IBL vacuum flex transfer lines
دانشگاه شهیدرجایی تهران
تعهدات مشتری در کنوانسیون بیع بین المللی
مـانــــــور زلـــزله
Michail Anastasopoulos Lead Detector – Design Engineer
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
HL-LHC - WP15 modifications Coffrets Prise C4L8
Rack and Interconnect Design in E-plan
Presentation transcript:

IBL Vacuum Box in UX15 Short summary Andrzej Zmuda

Planned place to install

Planned method of installation  4 holes in angle bars  4 drilled blocks  box on 4 scrubs

Electrical schematics prepared

Cable schedule updated PT709, PT712 Vacuum pressures UX15 level 6 FCTIR X3.1 NG connect USA15 level 6 FCTIR Vacuum AUSA15 Level 6 2X X X3.4 4 PT809, PT812 Vacuum pressures UX15 level 6 FCTIR X3.5 NG connect USA15 level 6 FCTIR Vacuum BUSA15 Level 6 2X X X3.8 4 TS71x vacuum feedbacks plus spares UX15 level 6 FCTIR X3.9 NG connect USA15 level 6 FCTIR Vacuum AUSA15 Level 6 2X X X X X X X TS81x vacuum feedbacks plus spares UX15 level 6 FCTIR X3.17 NG connect USA15 level 6 FCTIR Vacuum BUSA15 Level 6 2X X X X X X X3.24 8

Box manufacturing in progress

Component installation progress

What is already done:  Box installation location selected and agreed with CRYO  Preliminary support design - done  Electrical schematics for cable patching - completed  IBL general cable schedule updated  Box internal design completed What still needs to be done:  Install all components inside the box – now (George)  Add interconnection box 3D model in Smart Team (Tomek B.)  Install box in the cavern (George)  Update electrical schematics for the Vacuum system Summary

Thank you for your attention