Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
27 September 2005A.Ciocio - ID Week1 SCT Service Installation Overview Status of Type IV Cable Installation Type II/III Cable Installation Plan for the.
Chiho Wang ATLAS TRT Duke University Hampton, May Xe-CO 2 Stability Chiho Wang Duke University.
 NT-01: Developed internal water leak after a few weeks of operation (may have been related to a beam incident). Managed internal water leak using helium.
1 AMS-02 TRD Status Report Stefan Schael RWTH Aachen TIM Meeting, CERN, June 2001 TRD meeting: Wednesday 16:15 in room !!!
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities, Now Three I.Target Hall NT-05 has been secured.
26 September 2000 High Voltage Plates and Capacitors Jack Fowler.
DOE/NSF Review of ATLAS, 1 Mar 2000, BNL Muon MDT Front End Electronics (WBS 1.5.9) James Shank DOE/NSF Review of U.S. ATLAS Detector (with help from:
US CMS Collaboration Meeting, UC Riverside, May 19, Endcap Muons John Layter US CMS Collaboration Meeting May 19, 2001.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
Summary of Fuse Testing for Barrel Module Fuse Boxes Duke University Jack Fowler.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN HV capacitor Testing.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
Seog Oh/ Duke University/September, 2003 TRT Workshop/ Peniscola, Spain Duke TRT Progress.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment Vasiliki A. Mitsou CERN HEP 2003, April, Athens,
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Status of Gain Mapping at Duke.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
ATLAS TRT Duke University CERN, Feb Barrel Capacitors  With socket and bent pin, forms capacitor assembly  Duke supplies capacitors, Hampton assembles.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Test of the cleaning gas mixtures.
CLAS12 Drift Chamber Prototyping
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
M. TYNDEL 1 LHCC Interactions May 2003 ATLAS SCT SCT Production Status ‘Snap-shot’ of the status of the SCT production (May 2003) 1. Barrel Modules 2.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Chiho Wang ATLAS TRT Duke University IU, Oct Fuse Box Design & Mounting Chiho Wang Duke University.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box & Capacitor Status Chiho Wang Duke University.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Wire Procurement and Wire Joint Production
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
Acceptance test at Duke
Update on the SVD construction
Jack Fowler Duke University Spain Workshop
Summary of Fuse Testing for Barrel Module Fuse Boxes
Module Production and Testing at Duke
HV capacitor Testing.
Presentation transcript:

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Module Production  Mechanical Construction  All Type II (M2.01 to M2.37) are completed and gas tight.  All Type III (even number Type III (minus M3.32,M3.34)) are completed and gas tight.  Stringing  Type II  M2.33 and M2.34 are remaining to string.  Super spares (M2.35, M2.36, M2.37) will be strung by the end of September.  Type III  5 Modules were sent to Hampton for stringing  M3.16, and M3.30 are remaining to string. –Either Duke or Hampton will string  Super spares (M3.36) will be strung by the end of September.

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Modules to be strung

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Stringing stations

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN  Duke Acceptance testing  Type II  M2.02, M2.03, M2.04…. M2.16 are completed including final gas leak test and signal test.  Type III (even)  M3.02, M3.04, M3.06… M3.14 are completed including final gas leak test and signal test.  8 Type II, and 6 Type III are at Hampton for gain mapping

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Wire-joint production  Original estimation was ~65,000, but we are approaching ~100,000.  Original estimation was ~280/day, but we have been producing ~400/day or ~2000/week.  We have slowed down to ~ /week, which is still enough to meet the reduced stringing rate at the three sites.  After 34 modules of all three types were strung, the rate will be reduced to ~1000/week. Need ~6000 for super spares (35/36/37).  After 37 modules, plan is to produce ~1000 for re- work at CERN and ~2000 for reserve.  The wire-joint production should be over by the end of August.

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Fuses Boxes  The design is completed and they are being machined. We should have them back by the end of June.  Production is 40 sets of each type module (240 fuse boxes).  We also need dummy fuse boxes for the other module side. These are being machined as well.  Plan to start the assembly in July.  Need fuse delivery schedule. We only have 100 pre- production fuses.  No good estimation for the production time yet.  Should we test fuses through random sampling?  Not in critical path

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Fuse Boxes

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN HV capacitors  Decision was made to go with NPO/850pf /2000 volts.  Passed initial testing.  Arcing test at 2000 volts – 50 capacitors  Neutron radiation test – 20 capacitors  Co 60 radiation test – 20 capacitors  HV soaking for two months at 2750 volts – 50 capacitors  A fixture to assemble 20,000 cap is being tested  ~500 will be made for the beam test  Final testing with the assembled capacitors  Full production should start in August and would take ~two month.  Long term HV soaking test (10 days at 2750 volts) would take ~six months.  Not in critical path

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Capacitor assembly fixture

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Beam test structure

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN People  May /2003 – 6.5 techs: stringing, wire-joints  June /2003 – 5.5 techs: stringing, wire-joints  July /2003 – 3.5 techs: stringing, wire-joints, fuse boxes  Aug /2003 – 3.5 techs: stringing, wire-joints, fuse boxes, capacitor assembly  Sep /2003 – 3.5 techs: stringing, fuse boxes, capacitor assembly  Oct /2003 – 2 techs: fuse boxes, capacitor assembly