State of Utah Division of Facilities Construction and Management DFCM -- Our Mission To provide professional services to assist State entities in meeting.

Slides:



Advertisements
Similar presentations
Organization of Primary Entities
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
Delivering Successful Facility Projects It Starts and Ends with You!
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Terminal Commissioning Case Study- Terminal A Logan International Airport ACI-NA Environmental and Operations & Technical Conference May 4, 2008 Sam Sleiman,
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
What Constitutes a Quality Commissioning Job?. Agenda Preconstruction Services –Brian Toevs, PE Construction Services –Rusty Ross, PE, LEED TM, CxA Client.
The Pit Crew: Strengthening the M&O and Facilities Parthership APRIL 3-6, 2013, LONG BEACH, CA.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
1 Institutional Support Services Capital Project Process.
Capabilities Presentation Please select the button above that best describes your interest to learn more about how Formare Technica, Ltd. can help you.
Building Commissioning
PROJECT DELIVERY SYSTEMS
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
Genesis Solar Module Brochure ™
The Importance of the Qualifications Based Selection (QBS) Process
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
Chapter 1 Professional Architectural Careers, Office Practices, and Opportunities.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
S/W Project Management
Sustainability and Total Cost of Ownership Strategies for Higher Education.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Standards of Practice Course
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Commissioning for Sustained Building Performance Building Performance Birmingham, AL Marriott 9/29/11 Introduction to Commissioning and Retro-Commissioning.
THE ECONOMICS OF RE-CREATING EDUCATIONAL ENVIRONMENTS HOW TO ACHIEVE HIGH PERFORMANCE SCHOOLS.
Dan Frasier, PE, CCP Successful Turnover of New and Renovation Construction Projects Successful Turnover of New and Renovation Construction.
King County Wastewater Treatment Division What you need to know about WTD’s Technical Standards.
H&S Consultants Consulting Services and Project Management.
2 of 45 WELCOME TO BUILDING COMMISSIONING 101 Building Commissioning Association.
Phoenix Convention Center Phoenix, Arizona Existing Building Commissioning (EBCx): A Strategy for Improving Your Building Performance Track: Building Performance.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
Building Commissioning: Cx 101 Brock Graham, Gilbane Building Co. Michael Gannon, BVH Integrated Services November 15, 2010.
Formats ACT 380.
Birmingham, AL SERBCA Fall Conference Presented by: Gary Sweatt, CxA, QCxP.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
Contracting for Commissioning Services A Priority for Facility Owner’s and Program Managers Matt Ferreira, CxA, LEED AP October 14, 2008.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Process of Planning, Designing and Financing a Hospital
How to Have a Successful Retrocommissioning Project Karl Stum, PE Portland Energy Conservation Inc. (PECI) Successful Retrocommissioning.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
FACILITIES PLANNING INTRODUCTION Form Follows Function Form and function should be one, joined in a spiritual union.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Commissioning HVAC Systems: Lessons learned throughout
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
BIM EXECUTION PLANNING PROCESS
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
BIM EXECUTION PLANNING PROCESS
Your Facility Your Information
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
The Business of Commissioning
Controlling Project Cost and Schedule
Presentation transcript:

State of Utah Division of Facilities Construction and Management DFCM -- Our Mission To provide professional services to assist State entities in meeting their facility needs for the benefit of the public. The Division of Facilities Construction and Management (DFCM) is the building manager for all State owned facilities and is responsible for: All Aspects of Construction and Maintenance of State Buildings Assisting the Utah State Building Board in Developing its Recommendations for Capital Development Projects and Allocating Capital Improvement Funds Overseeing all Non-Higher Education and Non-Judicial Branch Leases Controlling the Allocation of State Owned Space

New Building Key Components OWNER – DFCM AGENCY OR INSTITUTION– – Higher Education includes all State Universities and Colleges – Correctional facilities – State Parks – Office Space – Courts – Hospitals – Museums FACILITY MAINTENANCE GROUPS – HVAC Shop – Electrical Shop – Carpenter Shop DESIGN PROFESSIONALS (A/E’s) – Architects – Engineers – Consultants GENERAL CONTRACTOR – Sub-contractors – Suppliers – manufacturers

Reasons/Goals for Building Commissioning Energy Efficiency to minimize utility costs Ensure building components performance Documented demonstration of system performance Improve equipment life cycle costs Improved construction schedule management Improve building start-up and turn over Warranty claims are reduced Improve building occupant thermal comfort levels Improve indoor air quality (IAQ) Requirement for LEEDS Documentation for applying for Utility Rebates

Utilizing a Cx Agent to meet the Goals Identify a scope of work Timing for a Cx Agent’s involvement Selection Costs

SCOPE OF WORK Owner must identify the expectations for the project What basic systems are included – HVAC, Electrical, Fire Alarm, Emergency Power Expanded Cx Required – Elevators, UPS, Envelope Who Contracts the Cx Agent – Owner, Agency, General Contractor

Timing Pre-design Phase (programming, Owner/Agency Project Requirements) Design Phase Construction Phase Occupancy and Operations Phase

Selection Process Selection Committee (DFCM, Facility Maintenance, Architect, Contractor) Qualification Based Selection Cx Team Member Qualifications Cx Documentation Process Communication/interactions Past Experience and References

National report 2009 Median Cost $1.16/sf DFCM Costs: – Classroom, tunnel, Central Plant - $2.08/sf – Housing Unit - $1.14/sf – Housing Unit - $1.68/sf – Housing Unit - $1.85/sf – Science Bldg. - $3.75/sf – Library/classroom/Admin. - $1.49/sf Cx Costs

Cx Agent’s Areas of Impact Cx Agent’s Impact to Project Quality Schedule Value Communications Owner’s Goals Energy Efficiency Ensure building performance Documented performance equipment life cycle costs Improved schedule management Improve building start-up and turn over Reduced Warranty claims Improve thermal comfort levels Improve indoor air quality (IAQ) Requirement for LEEDS Applying for Utility Rebates

Quality Meets Requirements of Construction Documents Good tracking and reporting process Training is done timely and completely for Facility Staff Facility Understands system better Input during programing and design will improve project

Schedule Work to project schedule Input to GC’s Schedule for commissioning Identify problem areas in schedule Improve system start-up Ready for occupancy to end user with a fully functional bldg. Problems identified early before they impact project schedule

Communications Timely notification of problems Be a part of the system flow Attend project meetings and coordination meetings Anticipate and inform Follow-up proceedures

Value Energy efficiency is improved (8% - 20%) Optimizes value received for each construction dollar spent Early involvement in project has greatest impact Properly operating equipment improves life cycle cost and decreases maintenance costs Good/Bad for suppliers and contractors – level field Simplifies utility rebate process

INVOLVING A COMMISSIONING AGENT DURING THE EARLY PHASES OF A PROJECT’S DEVELOPMENT MAXIMIZES THE BENEFITS THAT COMMISSIONING AFFORDS AT THE HIGHEST POSSIBLE VALUE.

PROGRAMMING DOS Speak English Establish a quality process Develop the OPR within the framework of the AE’s program Develop the scope of commissioning Assist in the development of your commissioning team: the AE, user’s project construction manager, the user’s operating and maintenance personnel, vendors of complex and/or specialty equipment, etc. DON’TS If you’re lucky enough to be hired at this stage, don’t stand idly by and let the opportunity slip away.

DESIGN DO Speak English Update the OPR Review the basis of design documents Prepare detailed commissioning specifications Participate in design reviews at the SD, DD, and CD phases Develop the commissioning plan and define the contractor’s related responsibilities Be involved with the interstitial space planning and the AE clash detection process Assist the designers to include elements in the design/construction documents that meet both good engineering principles and are maintenance/operations friendly Be certain you’re working on the most current set of documents and specifications

Provide a detailed description of the responsibilities of all parties Specify that the training will be filmed and by a professional filming firm Some tests are very expensive, be specific as to what the tests are and their procedures Review equipment specifications and control sequence requirements before documents are put out for bid to assure compatibility of requirements between pieces of equipment – often what’s requested is not possible to achieve with the equipment, this is especially true in remodel or addition projects where some systems already exist DESIGN DOS cont

DESIGN DON’TS Don’t think of yourself as the design engineer Do not develop an adversarial relationship with the engineers‘ of record You do not approve the design or design criteria You are not responsible for code compliance Don’t forget to keep the user’s maintenance and operations staff involved as well as all of the members of your commissioning team

CONSTRUCTION DOS Speak Eng..... you get the picture, it’ needs to be communication that’s clear, concise, understandable Begin your work shortly after the ductwork, mechanical lines, etc. are being installed Stay involved with the review of the contractor’s BIM coordination drawings and make certain that the contractor included all work scopes in the BIM review. Visit the site frequently (especially if you’re from out-of-state): Bring up issues early on so they don’t become major issues at the end of the project – the sooner the contractor knows the problem, the sooner it can be resolved Be a problem solver, not just a problem reporter Develop a relationship with all project shareholders rather than just furnishing a report Encourage the contractor to walk the site with you Your shop drawing reviews must be timely and should be coordinated with the engineers’ of record

CONSTRUCTION DOS CONT Insist on coordination meetings with the subs, engineers, architect, etc. – attend as many MEP meetings as possible We like consistency and seeing the same face – we need a go- to-guy even though you may have specialists When it’s your responsibility to wear the black hat, then do it and don’t try to pass it off to the owner unless the contractor refuses to respond to you Keep the user’s maintenance and operations staff informed and involved

CONSTRUCTION DON’TS Don’t start late on the project and then play catch up DO NOT BLOW PAST DIFFICULT ISSUES because they are controversial – tough problems need time to be resolved The owner/architect/contractor meeting is not the time to surprise the contractor with an issue – it should be brought to the contractor’s attention so they have time to respond before it comes to the attention of the owner/architect. Do not wait for multiple incorrect practices or installations before raising a concern When the engineer and commissioning agent have not agreed on an approach to an issue, there’s trouble and it’s difficult to know who controls

POST CONSTRUCTION DOS

POST CONSTRUCTION DON’TS We don’t want to be the ones to remind you that it’s time for your seasonal testing/commissioning Don’t write a final report and disappear Don’t forget to review the O&M’s for completeness And finally, If you really want us to be satisfied with your performance...