Presentation is loading. Please wait.

Presentation is loading. Please wait.

Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.

Similar presentations


Presentation on theme: "Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles."— Presentation transcript:

1 Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles

2 What is LEED™? –Consensus Based Green Rating System for building design, construction and operation

3 What is LEED™? –It analyzes and measures multiple aspects of a building’s design and construction

4 Why LEED Certification? –There is no definition for “LEED certifiable” –Third-party verification assures you that what was designed and planned is in fact what you received.

5 What is Commissioning? Term derived by the Navy–  A commissioned ship is one deemed ready for service.  Material, systems and staff have successfully completed a thorough quality assurance process

6 The Commissioning Process is a quality- oriented process for achieving, verifying, and documenting that the performance of facilities, systems, and assemblies meets defined objectives and criteria.” -- ASHRAE Guideline 0-2005 What is Commissioning?

7 It’s not just for testing at the end!

8

9 What is Commissioning? –During Design »Document Review of Basis of Design (BOD) »Helps Owner create the Owner’s Program Requirements (OPR) »Defines scope of commissioning »Performs Cx Review »Creates Cx Plan »Incorporates Cx reqm’t in the CDs

10 What is Commissioning? –During Construction »Update the Cx Plan and Schedule »Review control sequences »Update test procedures »Document construction observations »If performing Enhanced Cx: »reviews submittals against Cx Plan, BOD and OPR »develops systems/ O&M Manuals

11 What is Commissioning? –During Cx »Functional Performance Testing (FPT) »Documentation of deficiencies found »Retesting of deficiencies »If En Cx performed then training of O&M Personnel »Final Report

12 What is Commissioning? –Enhanced Cx Warranty »Returns within 10-12 months to confirm systems are still working »Confirms adjustments for occupancy changes are made

13 Why Commission? Architect Elec. Contractor Mech. Contractor Elec. Engineer Mech Engineer General Contractor Typical Project Team Configuration Up to the Mid 1970’s

14 Why Commission? Gaps between disciplines result in: Poor coordination Lost details Costly change orders Delays in schedule Typical Project Team Configuration After the Mid 1970’s

15 Why Commission? Cx helps fill the gaps in coordination Cx encompasses “All” New Project Team Configuration with Commissioning

16 Why Commission? Setting clear, measurable goals for everyone –Verifies owner’s requirements are being met throughout the design and construction phases Establishing accountability –Changes the way people perform –Allows designers and contractors to measure success as well as deficiency Cx helps by:

17 Why Commission? Increases the Quality of the Process –Prevents/resolves problems –Designers focus on owner’s needs Discover/correct design issues early in design Improves specifications & design documents Reduces RFI’s & change orders Prioritize systems identified for early completion

18 Why Commission? Contractors focus on quality work –Improves submittal process –Provides resource for MEP coordination prior to construction –Catch problems at the start of installation –Test finished work to verify proper operability –Creates team atmosphere and accountability

19 Why Commission? Improves –Energy performance –Comfort –Air quality –Occupant productivity –Equipment life –Maintainability –Facility staff preparedness

20 Illustrative Relationships between Cx and energy efficiency measures

21 Why Commission? Report by Evan Mills with Lawrence Berkeley National Laboratory MS 90-4000, Berkeley, CA 94720 Prepared for: California Energy Commission Public Interest Energy Research (PIER)

22 Location of projects in the database SAMPLE 643 buildings -562 existing -82 new 99 million square feet $43 million investment 26 states

23 Type and size of buildings in database

24 Deficiencies discovered …

25 Payback times: new construction

26 Excellent outcomes for all bldg types

27 Why Commission? Risk Management -Ensures that a building owners get what they pay for -Provides insurance for policymakers and program managers that their initiatives actually meet targets -Detects and corrects problems that would eventually surface as far more costly maintenance or safety issues.

28 LEED Certification assures Glendale Community College that project’s meet the green goals you established Commissioning verifies that installed systems work properly and meet the defined criteria In Summary

29 Thank You. Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles