Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks

Slides:



Advertisements
Similar presentations
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Advertisements

The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
K. Long, 13 June, 2015  Target K. Long, Friday, 24 th April 2009.
K. Long, 14 June, 2015  Target K. Long, Friday, 24 th April 2009.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
TMB and RAT Status Report Endcap Muon OSU June 6, 2004 Martin von der Mey University of California, Los Angeles  Previous Status (OSU, April)
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
Tracker Summary Alan Bross MICE CM October 10, 2007.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
EMu Slice Test -- Status Frank Geurts FNAL/Rice
SX5: YE+2Counting House iBoot NPS emu slice0 2 emu slice0 1 Emu dqm Peripheral Crate DMB TMB DMB TMB DMB TMB DMB TMB MPC CCB DMB TMB DMB TMB DMB TMB DMB.
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
Overview B A B AR L1 DCT Upgrade FDR Masahiro Morii Harvard University Scope of the Project Current Status Schedule  Commissioning.
ELENA installation progress F. Butin / ELENA collaboration.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
PIXEL CAEN Installation Status
INSIDE in-beam PET system assembly and test at INFN Torino
LKr status R. Fantechi.
CSC EMU Muon Port Card (MPC)
G.Alexeev for Dubna group ITEP, April 28, Muon System Status Report from Dubna.
University of California, Los Angeles Endcap Muon Purdue
EMU Slice Test Run Plan a working document.
10/month is the present production rate 2 FTE + sporadic contributions
CMS RPC Endcap RE1 Status Report
HV & LV status LV system in W+1 and W+2 is OK
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
TMB, RAT, and ALCT Status Report
CSC Electronics Installation and Commissioning CSCE I&C
B904 Status Report by Fred B.
CSC Trigger Meeting Summary
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
RPC Detector Control System: towards the final system
Fred’s Input to Rice Workshop
HV & LV status LV system in W+1 and W+2 is OK
VCC Hardware Production Status
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
Pierluigi Paolucci & Giovanni Polese
Equipment Status ARCS equipment status DAQ equipment status
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
Plans for the 2004 CSC Beam Test
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Peripheral Crate Testing, Installation, and Commissioning
CSC Electronics Installation and Commissioning Oct ‘06
CSC Status Report Status reports;
B904 Status Report by Fred B.
CSC Electronics Installation and Commissioning CSCE I&C
Needed for Team A on -End
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
CSC Electronics Problem Report CSCE I&C
ME I&C -- PC Electronics
Presentation transcript:

Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks 19-April-05 Racks PC Rack >> 24 mini and 12 tall PC racks 12 mini and 6 tall PC racks at each of PLUS and MINUS ends Due to the schedule differences between PLUS and MINUS end lowering >> Concentrate now on PLUS end Mini Racks 24 mini racks prepared 10/12 mini racks installed on PLUS end Full Racks 4/6 prepared and installed on PLUS end Last 2 staged for riggers to put in place Also ALL other racks in PLUS end are installed HV, LV, alignment etc. 20-Nov-19 PC I&C March '06

Peripheral Crates PC > 60 (30 each end) crates plus spares 19-April-05 Peripheral Crates PC > 60 (30 each end) crates plus spares Crate structure assembled for all As BP arrive they are installed in crate CRB’s and other hardware are then installed Peripheral Crates are then installed at SX5 Time critical on PLUS end because installation requires crane, cherry picker and or special access Schedule looks good to install ALL PLUS PC before CMS closing for MTCC 20-Nov-19 PC I&C March '06

Electronics at CERN BP 11/60 CRB 80/60 All at CERN PCMB 6/60 19-April-05 Electronics at CERN BP 11/60 Delivery proceeding as scheduled >> not a critical path item CRB 80/60 All at CERN PCMB 6/60 Mass production starting >> not a critical path item OSU CC 11/60 All built, awaiting final firmware >> not a critical path item MPC 68/60 All at CERN CCB 76/60 All at CERN DMB 365/468 Remainder being shipped TMB 200/468 In final production RAT 200/468 In final production NONE of the PC electronics boards remain critical path items 20-Nov-19 PC I&C March '06

Software Hyper-DAQ based Commissioning Software Ready and tested 19-April-05 Software Hyper-DAQ based Commissioning Software Ready and tested Test routines include Tests and programming of individual boards Tests of two or more boards Fast site type tests & calibrations May be added later Test db All test information saved in files – listing and summary db to be built Basic test unit/run is Test session – finite time interval Particular crate with fixed board load Any board switches require the start of new test run 20-Nov-19 PC I&C March '06

Commissioning PC commissioning is starting Will concentrate on 30 PLUS end crates Will not finish before start of CMS closing June 1 start closing >> 4 weeks Can and will continue during closing and as access permits during MTCC Start lowering Sep 20 >> 20 weeks Expect to commission 2+-1 per week from May 1 Too slow a pace >> 2 is too slow a pace, 3 is OK By June 1 should have clear idea on actual pace of commissioning and how to improve 20-Nov-19 PC I&C March '06

MINUS End Racks Crates Boards Commissioning All mini racks prepared Will install during and after MTCC as access permits Crates All crates are scheduled to be completed by the end of the MTCC Will install from end of MTCC to beginning of MINUS end lowering More time will be available than for the PLUS end Boards Boards are all here or arriving on schedule Should all be here by end of MTCC Commissioning A pace of 2 per week is adequate to meet schedule 20-Nov-19 PC I&C March '06