CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules

Slides:



Advertisements
Similar presentations
EMU Peripheral Backplane. Timing with the CCB’2004 M.Matveev Rice University April 26, 2004.
Advertisements

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
TMB and RAT Status Report Endcap Muon OSU April 16, 2004 Yangheng Zheng University of California, Los Angeles  TMB Status  RAT Status.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
TMB and RAT Status Report Endcap Muon OSU June 6, 2004 Martin von der Mey University of California, Los Angeles  Previous Status (OSU, April)
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
Status of the CSC Track-Finder Darin Acosta University of Florida.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
EMu Slice Test -- Status Frank Geurts FNAL/Rice
SX5: YE+2Counting House iBoot NPS emu slice0 2 emu slice0 1 Emu dqm Peripheral Crate DMB TMB DMB TMB DMB TMB DMB TMB MPC CCB DMB TMB DMB TMB DMB TMB DMB.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
University of Wisconsin
AM system Status & Racks/crates issues
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
T1 Electronic status Conclusions Electronics Cards:
EMU Slice Test Run Plan a working document.
Electronics for RPC Upscope
CSC - HV, LV - Present Status and Future Plans Toward Phase 2
University of California Los Angeles
University of California Los Angeles
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Trigger Update Specific issues:
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Primitives Test Beam Studies
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
TMB and RAT Status Report
B904 Status Report by Fred B.
CSC Trigger Meeting Summary
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
UXC55 ME Muon Endcap On Detector Layout
Fred’s Input to Rice Workshop
VCC Hardware Production Status
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
Configuring the Peripheral Crates
Equipment Status ARCS equipment status DAQ equipment status
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
YE+3 Changes YE+3 X4A51 S4F04 Additions for TS ME+4/2/x chambers
Equipment Management DB Rack Wizard USC55 Underground Counting Room
Plans for the 2004 CSC Beam Test
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Peripheral Crate Testing, Installation, and Commissioning
CSC Status Report Status reports;
19-April-05 CSC ME1/1 Meeting
Needed for Team A on -End
CSC Electronics Problem Report CSCE I&C
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
PCMB Address Assignments per Station/Rack/Crate
Presentation transcript:

CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules 19-April-05 CSC Hot Spares LV Modules (24 units needed) Wiener PFC module spares 4 new + (2 old lower power) 1 on hand 1 with ECAL for special testing 1 failed yesterday 1 in repair Wiener Maraton Crates 4 units 4 on hand HV Modules ME1/1 CAEN system FU custom system > 40 master brds, 270 distribution brds 20% spares at CERN Custom Modules FED Crates – 4 crates 1 spare crate with PS – being shipped to CERN 1 spare on order 1 PS failed last week – using spare from CERN POOL Pcrates – 20% spares of all crates and boards at CERN On-chamber – 20% spares at CERN 25-Sep-19 CSC Electronics

19-April-05 LV & PCRATE CSC LV Power Supplies > Wiener Maraton System, Air Cooled MARC LVPS 72960xxx Maraton Crate 31 /60 /15 PFCM LVPS 719600xxx OPFC Module 40 PFCB LVPS 725000xxx OPFC Bin (Crate) 10 MARS LVPS 729200xxx Maraton Supply 40 MARC LVPS 729600xxx Maraton Crate 36 Peripheral Crate, pcrate, Components EMUPC PC 305216030320050xxxx pcrate crate assembly 75 /60 /15 CBP PC 305203021620050xxxx pcrate back plane 70 /60 /10 CRB PC 305203180220050xxxx pcrate power board 88 /60 /28 PCM PC 305216031320060xxxx PCMB 79 /60 /19 ELM PC 305205121320050xxxx ELMB on PCM 79 /60 /19 Pcrate boards VCC PC 305222030320050xxxx Crate Controller 73 /60 /15 CCB PC 305203030220050xxxx Clock and Control 84 /60 /24 DMB PC 305204130220040xxxx DAQ Mother Brd. 550 /468 /82 MPC Trigger PC 305213160320050xxxx Muon Port Card 70 /60 /10 TMB Trigger PC 305220130220050xxxx Trig Mother Brd. 570 /468 /102 RAT Trigger PC 305218012020050xxxx RPC ALCT Trns. 690 /468 /222 25-Sep-19 CSC Electronics

CSC HV HV ME1/1 > CAEN System cc HV > UF Custom System 25-Sep-19 19-April-05 CSC HV HV ME1/1 > CAEN System cc HV > UF Custom System 25-Sep-19 CSC Electronics

19-April-05 CSC Track Finder CSC TF cc 25-Sep-19 CSC Electronics

CSC FED FED Crates > Wiener 9U VME cc 19-April-05 CSC FED FED Crates > Wiener 9U VME cc FED Boards > OSU Custom Brds VCC PC 305222030320050xxxx Crate Controller 73 /60 /15 Pcrate Network > GBit Cc 25-Sep-19 CSC Electronics