Workplan and Administrative Management

Slides:



Advertisements
Similar presentations
WP4 – 4.1 and 4.2 Preparatory activities for the creation of the WATERMODE permanent network 1 Technical Committee Meeting Venice, June 24-25, 2010 VENETO.
Advertisements

Adriatic MoS The MED-PCS project July 15, Rome PROMOTION OF "PORT COMMUNITY SYSTEM" IN MEDITERRANEAN TRAFFIC Vittorio Marzano Assistant professor.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
Implementation of Leader Axis measures by Jean-Michel Courades AGRI-F3.
GRIP- IT Governance of Regionally Integrated Projects using Innovative Tools. (Structural Funds implementation in an integrated approach ) RFO – INTERREGIIIC.
1 Swiss-Slovak Cooperation Programme April SWISS-SLOVAK COOPERATION PROGRAMME  New possibilities of financial support for the 10 new member states.
Project Implementation Monika Balode Joint Technical Secretariat Lead Partner Seminar 16 October 2009, Šiauliai.
EUMEDIS PILOT PROJECT Sector 4: Information and communication technologies applied in industry and innovation MED.PRIDE MED.iterranean PR.oject for I.nnovation.
WP1Transnational project and financial management Establishment-Operation of the Project Management and Implementation Instruments Region of Peloponnese.
Education Modules’ Devolopment for Tecnical and Legal Issues in Energy Sector Technologies Kick-off Meeting February 2 / Ankara ndth.
Quality Management (WP5) Roman CHIRCA Agency for Innovation and Technological Transfer TecTNet ………... This project has been funded with support from the.
South East Europe Transnational Cooperation Programme Bologna, 15° June 2009 Kick-off meeting of project SARMa SEE Joint Technical Secretariat.
WP1 Management. N° of work package: 1 Management Duration in months: 36+2 EGEC Description of the tasks: 1.1. Project Management (EGEC) Coordination in.
Institutional structures for Structural Funds assistance Ministry of Finance September 10, 2003.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
DonQ – Air Project presentation. DonQ-Air – About project Objective: Objective: to encourage R&D activities in the aeronautic-related.
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
RARECARENet: how will we work together?. Information network on rare cancers Advisory Board The Coordinator (Project Management Team) Steering Committee.
Eurostat/UNSD Conference on International Outreach and Coordination in National Accounts for Sustainable Development and Growth 6-8 May, Luxembourg These.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
Structural Funds Managing Authority – Ministry of Finance 1 Technical Assistance Ilze Aleksandroviča Head of Control and Development Division EU Funds.
Application procedure From theory to practice Dieter H. Henzler, Steinbeis-Transfercenter Cultural Resources Management, Berlin.
Number: TR/06/B/F/PP/ WASTE-TRAIN VOCATIONAL TRAINING, EDUCATION, CONVEYING INFORMATION ON UP-TO-DATE WASTE MANAGEMENT PRACTICES TO DECISION MAKERS/STAFF.
Manfred Horr, Project Coordinator Head of Section Economic Policy and Private Sector Development German Technical Cooperation (GTZ) Kick-off workshop,
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
BENCH-CAN Coordination
Kick Off Meeting Largs, Scotland
Specific objective „To increase support for general education institutions to develop students’ individual competences” Measure No „Support.
WP8 Project management Milan Gocić University of Niš
AMICI WP1 – Management, coordination and dissemination
WP3 - Evaluation and proposal selection
Third PMC meeting University of Priština, Kosovska Mitrovica
GUIDELINES Evaluation of National Rural Networks
Year One: Project implementation overview
SOUTH BALTIC CROSS-BORDER CO-OPERATION PROGRAMME
Proposed Organisation of Evaluation of the Romanian NSRF and Operational Programmes, Niall McCann, Technical Assistance Project for Programming,
Venue: WIIW, Vienna Loredana Marmora and Margaret Pesuit, ISIS
Chisinau, Republic of Moldova 2017
Dr Sally Priest, Flood Hazard Research Centre
Project Management Lifecycle Phases
Institute of Informatics & Telecommunications
SEPA Sustainable and Equipped Productive Areas
The role of the Passport Indicators in Monitoring PFM Strategy
Start-up procedures Managing Authority of European Territorial Cooperation Programmes Joint Secretariat of Interreg IPA CBC Programme “Greece – Albania.
Kick-off meeting of the project UMBRELLA
Project implementation overview WP2 and WP3
AMICI WP1 – Management, coordination and dissemination
SOCIAL DIALOGUE WITHIN EUPAN
SMATH Smart atmospheres of social and financial innovation for innovative clustering of creative industries in MED area Smart Atmospheres wealth of heritage.
WP3 – TESTING Roberto Sandrini – University of Venice
WP2 Communication WP and tasks presentation
TOP6 – WP4 Coordination and Management JPICH Coordination Office
Interreg IPA CBC Programme "Greece - Albania "
HERITAGE PLUS – Management Group Meeting
Dr. Katja Šnuderl, Contract manager
PROGRAMME 2: GOVERNANCE, POLICY & RESEARCH
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
WP 1 Management and Coordination
TOP6 – WP4 Coordination and Management JPICH Coordination Office
Roles and Responsibilities
1st Technical Committee Meeting – 08th Nov
Aurora Hoxha & Drini Imami
Role of Evaluation coordination group and Capacity Building Projects in Lithuania Vilija Šemetienė Head of Economic Analysis and Evaluation Division.
- Kick-off meeting - ERANET Cofund BlueBio WP4 (Leader: AEI)
FVG AR Action Plan Implementation
Presentation transcript:

Workplan and Administrative Management Kick-Off meeting SMATH Project Venice – June 14th and 15th 2018 Workplan and Administrative Management Paolo Carlucci VENETO REGION

WP 1 – Project Management (starting date 02/2018 - ending date 07/2020) WP leader – Veneto Region Activities: 1.1 – Project Management, Coordination and Administration 1.2 – Project's evaluation   All the activities will start on February 2018 and will end on July 2020

WP 2 – Communication (starting date 02/2018 - ending date 07/2020) WP leader - Technopolis of the Municipality of Athens SA Activities: 2.1 – Coordinating the Communication phase 2.2 – Setting up common methodologies for actions 2.3 – Project communication tools 2.4 – Open days and final conference 2.5 – Coordination with Horizontal projects 2.6 – Coordination with MED Programme 2.7 – Participation in External events   All the activities will start on February 2018 and will end on July 2020

WP 3 – Testing (starting date 03/2018 – ending date 07/2020) WP leader – Ca’ Foscari University of Venice   Activities: 3.1 - Coordination of the testing phase 03/2018-07/2020 Responsible partner: Ca’ Foscari University of Venice 3.2 - Fine-tuning of tools for the generation of "smart athmospheres"as ecosystems to support CIs (preparing pilot activities) 03/2018-07/2020 Responsible partner: Ca’ Foscari Unviersity of Venice 3.3 - Contributing with Creative Nests to the generation of "Smart Athmosphere" 09/2018-07/2020 Responsible partner: Institute of Culture of the Municipality of Barcelona 3.4 - Strengthening CIs' networking and cooperation attitude 12/2018-07/2020 Responsible partner: The Culture and Heritage Industries Cluster 3.5 - Enhancing managerial capabilities of cultural engines 03/2019-07/2020 Responsible partner: PRIMI - Regional Pole Image Internet Multimedia 3.6 - Support in Financial and Funding Opportunities 03/2019-07/2020 Responsible partner: Barcelona Activa SA SPM 3.7 - Promotion of Cooperation to enhance Internationalization 11/2019-07/2020 Responsible partner: Technopolis of the Municipality of Athens SA 3.8 – Evaluation of Pilot Activities 05/2018-07/2020  

WP 4 – Transferring (starting date 05/2019 – ending date 07/2020) WP leader - Autonomous Region Friuli Venezia Giulia Activities: 4.1 - Coordinating the transferring phase 05/2019 – 08/2019 Responsible partner: Autonomous Region Friuli Venezia Giulia 4.2 - Strengthening the marketing potentials of Cis 05/2019 – 01/2020 Responsible partner: DEVELOPMENT AGENCY ZAGREB – TPZ Ltd. 4.3 – Action plan 07/2019 – 11/2019 Responsible partner: Veneto Region 4.4 - Sustainability of Creative Nests and the MED Creative Cluster 11/2019- 07/2020 Responsible partner: Agency for Territorial Marketing Ltd. 4.5 - Transferring activities to strengthen the impact of SMATH project 02/2020-07/2020

SMATH reporting procedure Costs for project implementation: Start: 16 January 2018 approval by Programme SC End: 30 September 2020 official ending date + 2 months only for payment Reporting periods: Progress Report and Payment claim must be submitted to the JS within 3 months after the end of each implementation period (NO delays accepted) Implementation period   Submission date 01/02/2018-31/08/2018 30/11/2018 01/09/2018-28/02/2019 31/05/2019 01/03/2019-31/08/2019 30/11/2019 01/09/2019-29/02/2020 31/05/2020 01/03/2020-31/07/2020 30/10/2020

WP 1 – Project Management (activities and deliverables) WP leader – Veneto Region 1.1 – Project Management, Coordination and Administration 1.1.1 – Project management guide 1.1.2 – Quality standard guide 1.1.3 – Risk management plan 1.1.4 – Progress and financial reports 1.1.5 - Guidelines for Steering, Monitoring and Technical committees’ procedures 1.1.6 - Project Steering, Monitoring & Technical Committee Meetings 1.2 – Project's evaluation 1.2.1 – Evaluation methodology 1.2.2 - Internal evaluation reports  

WP 1 – Project Management (activities and deliverables) WP leader – Veneto Region D1.1.1 – Project management guide A support tool to initiate fundamental guidelines related to MED Programme procedures (e.g reporting, expenditures, FLC procedures), outline the management structures, tools & functions, daily management and communication procedures. D1.1.2 – Quality standard guide The Q.S.G. will be delivered at the beginning of the project tonprovide specific guidelines ensuring the relevant implementation of the designed activities in order to provide sound outputs serving the scope of the projects’ goals. D1.1.3 – Risk Management Plan A risk management plan will be elaborated and constantly monitored to prevent the project to fail the results envisaged and to meet all expectations. D1.1.4 – Progress and financial reports The Progress and financial Reports will be submitted at the end of each semester including information of financial and technical interest. Their preparation and submission is the LP’s obligation with the contribution of the other partners.  

WP 1 – Project Management (activities and deliverables) WP leader – Veneto Region D1.1.5 – Guidelines for Steering, Monitoring and Technical committees’ procedures The LP is responsible of drafting the Guidelines for the Steering, Monitoring and Technical committees’ procedures that will define specific regulations and roles. The Guidelines will be validated during the 2nd Meeting. 1.1.6 - Project Steering, Monitoring & Technical Committee Meetings Minutes from Project Steering, Monitoring and Technical Committee Meetings that will take place approximately every 6 months to assure the coordination of implementation issues and corrective actions according to the internal evaluation system. D1.2.1 – Evaluation methodology The LP will prepare the methodology that will include both internal and external type of evaluation process aiming at clarifying all relevant aspects of this important task of the project that will assess the effectiveness of its progress and results D1.2.2 – Internal evaluation reports The PPs will apply an internal type of evaluation of the project’s progress that will be depicted in 3 evaluation reports elaborated according to the specifications of the respective methodology.  

Thank you for your attention