Information related to Chapter 7 in the textbook

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Module Floor Systems.
Grimsby Secondary School
Roof Framing A Quick Primer
Competency: Draw Wall Sections
Weekend Cabin Retreat Project Sill and Floor Construction
Unit 42 Floor Framing Floor Unit Resting on Sill Plates • Floor Unit Resting on Cripple Walls • Posts and Beams • Floor Joists • Subfloor • Floor Underlayment.
Residential Framing Prints Unit 14.
Foundation Systems.
Skilled Trades 1201 Floor Framing
CE 479: DESIGN OF BUILDING COMPONENTS AND SYSTEMS FALL 2012 – J. LIU Wood Beams: Additional Components.
Sill and Floor Construction
10 Chapter Floor Framing. 10 Chapter Floor Framing.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 1 Slide 1 Unit 1 CADD Part III.
Competency: Draw wall sections and details. Objective: Apply concepts of wood sill and floor construction.
Chapter 19 Floors.
Copyright 2006 The National Association of Certified Home Inspectors
CONSTRUCTION AND DETAILING 1
Floor Systems and Foundation Support
Building Types.
Grimsby Secondary School TCJ3C
ASSIGNMENT Begin on page 197 “The Foundation”.
AT 201 Introduction to Architecture Still and Floor Construction Shaquille Williams September 24, 2013.
Floor Framing Unit 29.
RESIDENTIAL CONSTRUCTION UNIT Grade 10 Construction Technology TCJ200.
Wall and Ceiling Construction
Structural Components
1 Building Types. 2 Building Use and Size Buildings are available in many types and sizes. Large, specialized buildings should be planned and built by.
Sill and Floor Construction
Choose a category. You will be given the answer. You must give the correct question. Click to begin.
Chapter 25 Framing Methods. 2 Links for Chapter 25 Balloon Framing Platform Framing Post-and-Beam Framing Related Web Sites Steel Construction Concrete.
Platform Construction Construction Mr. O. Platform Construction For use in construction jobs where a house is built over a basement or crawl space. For.
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
Residential Construction Mr. Todzia
Ag Construction Studs Vertical framing boards are called.
Wood Construction CTC-375.
+ Sill and Floor Construction Vocabulary. + Anchor Bolt A threaded rod inserted in masonry construction to anchor the sill plate to the foundation.
Unit A3-9 Framing Agriculture Structures Problem Area 3 Construction Systems.
HOME BUILDING PART 1 Floor Framing. Floor Frame  Now that you have a foundation, it’s time to build on it.  This type of construction is for stem-wall.
Chapter 28 Structural Components of Framed Construction.
Jobsite Inspection Checklist
1 Presentation 10: FLOOR SYSTEM COMPONENTS. 2 Framing Methods Platform Framing: –Each floor is constructed and then walls are placed on top.
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
Framed Structures Luisana Hernández.
House Construction.
Drafting 2 (Arch) Quiz Review #5
Floor Framing.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only 1 PowerPoint Presentation Publisher The Goodheart-Willcox Co., Inc.
Structural Components
Floor System Sizes and Materials
Building Construction for the Fire Service
Framing Vocabulary Stud: upright beams in the framework of a building
Framing Agriculture Structures
Competency: Draw Wall Sections
Use of Cantilevered Sill Plates with MPCWT to Align with Varying Thicknesses of Exterior Sheathing Overview Revised 3/22/2017.
PowerPoint Presentation
Drafting 2 – Honors Architecture Ardrey Kell High School
Objective 6.02 part 1: Recognize components of construction
Competency: Draw wall sections and details.
Framing Agriculture Structures
•Connecting to the Foundation & Bearing
Wood structures Topic 3 Floor Framing
PowerPoint Presentation
Project Design & Construction
Wood Frame Construction
Unit 8 Floor Framing.
Vocab. Vocab Wall Layout Floor Layout Ceiling Layout.
Competency: Draw Wall Sections
Chapter 13 Concrete Form Design.
Unit 6 Structural Members © 2006 ITT Educational Services Inc.
Presentation transcript:

Information related to Chapter 7 in the textbook Floor Framing Information related to Chapter 7 in the textbook

Floor Framing Floor systems are based on platform framing, however for many years balloon framing was used. Platform framing: Allows 3 or more stories to be built from short (8’) lumber. Safe fire construction Wall height fits modular materials (4x8 sheathing) Uses least expensive lumber

Floor Framing Balloon framing used from mid 1800s to mid 1900s. Balloon framing: Builds first and second story walls at once, and hangs floor on the side Allowed fire to travel quickly in walls Required good quality 16’wood Walls were typically sheathed with solid boards

Floor Framing Components of a Platform Frame Sill plate (also sill, mudsill) Girder (Beam, Built-up beam) Floor joists Bridging Sheathing (Subfloor)

Floor Framing Sill is bolted to the foundation, and the floor joists are nailed to the sill. The subflooring is nailed to the joists to create the deck, or platform on which the walls are built.

Floor Framing Sills – Pressure treated lumber that is bolted to the foundation. Anchor bolts set every 4’, 6’, or 8’ apart. Can be leveled if foundation is not level, and sealed with seal sealer or caulk. Girders – For floors that span more than 16’, the center of the floor typically rests on a girder. Girders are made of Steel, LVL, or built-up from solid sawn wood. The size of the girder is usually called out on the plans.

Floor Framing Floor Joists – Selection based on 4: Span – The distance between the supports Load and Deflection– 40 psf Live load, 10 psf Dead load typical for all areas except 2nd floor bedrooms ( 30 psf LL, 10 psf DL). L/360 typical limit for deflection for floors. On-center spacing – 12,16,19.2, or 24” Size of lumber - 2x6, 2x8,2x10,2x12 Species and grade - #2 SPF and #2 Hem Fir are the most common grades found in the Northeast. Span tables available on-line from Canadian Wood Council

Floor Framing On-center spacings – The floor joists must be located so that both edges of an 8’ (96”) sheet of plywood are supported. Possible spacings include 12”, 16”, 19.2”, and 24”. When starting to layout joists from the edge of the floor, the spacings are determined as follows:

Floor Framing Special framing- Extra framing is included around openings in the floors for stairs, chimneys, mechanical ducts. Extra framing is included under walls parallel to the joists, bathtubs, etc. Cantilevered joists are modified to ensure adequate support. Bridging installed on joists over 8’ Cutting of joists for duct work, chases, pipes, etc.

Floor Framing Framing for openings: The joists on each side of are doubled to increase support for the floor. Members perpendicular to the joists are Headers and parallel to the joists are Trimmers. Locations where full joists would have been placed are filled with tail joists

Floor Framing

Floor Framing Cantilevered joists – Used for bay windows, second and third floor decks, steep slope sites. Joists should extend back into framing twice the distance they extend out. Blocking (not bridging) is installed between joists at the point of the support

Floor Framing When a wall runs parallel to the joists (and below a bathtub) the joists are doubled to provide extra support. Space between joists allows room for electrical, plumbing, etc. Walls which are load bearing must have a girder or wall below them.

Floor Framing Bridging – Is used to support floor joists to keep them from twisting under load (lateral torsional buckling), and to provide some load sharing. Used at the center of spans over 8’. Bridging should be nailed off after subflooring is down. Three types of bridging Wood cross-bridging Wood solid bridging Metal cross-bridging

Floor Framing Cutting joists – As soon as the carpenter installs the joists, the other trades (electrical, plumbing, HVAC, etc) begin cutting into them. The holes must not substantially weaken the joist. This is especially critical when working with I-joists.

Floor Framing I joists and open web joists (parallel chord truss) – Home Design is emphasizing large open spaces without dividing walls (“Open plan”) This often requires joists to span distances greater than 20’. For long spans 24’-32’ engineered wood products are very popular

Floor Framing Headline from Pompey fire Joists must be installed according to manufacturer’s instructions, and no modifications can be made without the approval of a registered professional. Headline from Pompey fire

Floor Framing

Floor Framing Tongue and Groove subflooring – Subflooring should be installed with construction adhesive (20% stronger, less squeaks) and following proper nailing schedule. Some T&G subfloor is sized for spacing. Thickness determined based on span rating. Available in both veneered plywood and composite. Sanded subfloor-underlayment popular in tract construction.