API SC 10 WG15 Stage Cementing Collars

Slides:



Advertisements
Similar presentations
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
Advertisements

2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC6 Liaison report for SC18 Rick Faircloth.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
Progress report for ISO/IEC DTR Metadata Mapping Procedure(MMP) October, 2012 Tae-Sul Seo and Sung-Joon Lim 1.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
San Francisco, CA. SC8 Liaison Report
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience Product Lifecycle Management.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
Doc.: IEEE /0377r2 Submission March 2005 Adrian Stephens, Intel CorporationSlide 1 Ballotting Process Improvements Notice: This document has been.
API 19 CI Chemical Injection Devices for Downhole Applications
API 2016 Exploration & Production Standards
API 19 CI Chemical Injection Devices for Downhole Applications
COMET Working Group Progress Report 11/13/03
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
OASIS TC Process Overview
TG Chair: Mark Brinsden Shell
IEEE TGw March Agenda Date: Authors: May 2008
Updates from SC18 Summer Meeting
TGax March 2017 Closing Report
API SC 10 Task Group on Stage Cementing Collars TG Charge Proposal
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
API 16C Choke and Kill Equipment
OASIS Overview TC Process
OASIS Overview TC Process
January 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for January 2018] Date.
2016 Exploration & Production Standards Conference Subcommittee 10
TGaf Waikoloa Closing Report
Specification on float equipment
CTI TC Inaugural Meeting 18 June 2015
API SC 10, Work Group 3 Update:
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
2016 Exploration & Production Summer Standards Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API Summer Standardization Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
TGaf Geneva Closing Report
Motion – P Rev/D3 to RevCom
TGaf San Francisco Closing Report
Submission Title: [Proposed project timeline]
API 16 AR Specification for Drill-through Equipment Remanufacturing
2016 Exploration & Production Summer Standards Conference
IEEE 802 JTC1 Standing Committee March 2019 (Vancouver) closing report
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
Closing Report Plenary Meeting Dallas, TX November 10-14, 2008
TGaf Waikoloa Closing Report
IEEE TGaf DRAFT Meeting Plan and Agenda
<month year> DCN k January 2011
TGg Report to the IEEE Working Group
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
Motion – P Rev/D3 to RevCom
Light Communications Topic Interest Group May 2017 Closing Report
TGaf Orlando Closing Report
Task Group G Report January 17, 2003
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
Float Equipment API Spec 10F
API SC6 Valves and Wellhead Equipment
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
Calendar Overview – Phase I – REVISED April 2019
IEEE aj May Closing Report
2018 Exploration & Production Summer Standards Meeting Subcommittee 10
Presentation transcript:

API SC 10 WG15 Stage Cementing Collars Alfredo Sanchez, P.E., Rubicon Oilfield International 2018 Exploration and Production Summer Standards Meeting Denver – June 12, 2018

Content Review Charge Current Roster Recent Updates Document Draft Questions API SC10 WG 15 Stage Cementing Collars - 2018 Exploration and Production Summer Standards Meeting. Denver – Jun. 12, 2018

TG Charge (approved in Jan 2017 Austin Meeting) Develop an API document for stage cementing collars to include at minimum the following content: Applications Types Testing procedures Performance reporting considerations Factors that affect life span Design and manufacturing considerations Relationship to well barrier elements The final content and document type to be defined based on the consensus of the task group and balloted to SC-10 API SC10 WG 15 Stage Cementing Collars - 2018 Exploration and Production Summer Standards Meeting. Denver – Jun. 12, 2018

API SC10 WG 15 Stage Cementing Collars - 2018 Exploration and Production Summer Standards Meeting. Denver – Jun. 12, 2018

April 19 Meeting Minutes Uploaded to SharePoint Motion to approve? API SC10 WG 15 Stage Cementing Collars - 2018 Exploration and Production Summer Standards Meeting. Denver – Jun. 12, 2018

Document Draft API SC10 WG 15 Stage Cementing Collars - 2018 Exploration and Production Summer Standards Meeting. Denver – Jun. 12, 2018

Document Draft Significant progress in Applications section Significant progress in Operations section Agreed to increase pace through full day meetings every other month. Technical Report with Spec considerations API SC10 WG 15 Stage Cementing Collars - 2018 Exploration and Production Summer Standards Meeting. Denver – Jun. 12, 2018

SC10 WG 15 Sharepoint http://mycommittees.api.org/standards/ecs/sc10/wg15/default.aspx API SC10 WG 15 Stage Cementing Collars - 2018 Exploration and Production Summer Standards Meeting. Denver – Jun. 12, 2018

API SC 10 WG15 Stage Cementing Collars Questions or Comments? API SC10 WG 15 Stage Cementing Collars - 2018 Exploration and Production Summer Standards Meeting. Denver – Jun. 12, 2018