Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;

Slides:



Advertisements
Similar presentations
ELEMENTARY SCHOOL PROGRAM ADJACENCIES Note: The functional relationships illustrated are diagrammatic only. Further interpretation of these relationships.
Advertisements

Doors and Windows.
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
1 Zero Tax Increase Referendum: Community Information Session.
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
Architecture CAD living sleeping service SPACE PLANNING
Bronze Award: Library/Media Center
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.
Space suit. Oxygen Making Machine Shuttles #1 Shuttles #2 Cockpit with windows.
Current Project Update October 25th 2012 Good Evening!!!
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
For Students in their Food Services, Health Center, Co-curricular & Study Spaces 11/9/12.
Facility Layout 7 Personnel Requirements Shipping and Receiving.
Facilities Update Site Improvements Encinitas Union School District September 5, 2006.
Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School.
Glenvar High School Renovations School Board Presentation
Early Childhood Environments What elements are involved in creating developmentally appropriate environments for children? Space needs Furnishings,
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Understanding Floor Plans
Renovation 2014 Preserving the Past | Preparing for the Future The renovation we are planning seeks to preserve the past by maintaining the character and.
PERFORMANCE & CODE ANALYSIS TIMBer Inc. ·Brooke Fedder · Marie Rottschaeffer· Izzie Molinuevo· Tena Pettit·
Schools (2/2) March 22 nd Context Administration facilities Staff facilities Safety and security measures.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
MACEWAN UNIVERSITY SERVICE CENTRE January 2010 Photo Optional Preliminary Interior Design Development.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
Building Codes and Interior Design
Section B Inventory Process and Forms. General Inventory Actions %Getting Started Set inventory goals and objectives %Who District Program Manager Site.
Frank c. havens elementary school CONCEPT DESIGN II Refinement of hybrid October 24, 2007 R. P. Gallagher Associates Structural Engineers.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
Objective 1.03: Explain ways to adapt housing to meet special needs.
HIGH SCHOOL PROGRAM ADJACENCIES Note: The functional relationships illustrated are diagrammatic only. Further interpretation of these relationships shall.
March 12, 2015 Ss. John & Paul Catholic Church Feasibility Study.
Queen Anne’s County Public Schools New Construction of the Matapeake Middle School.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Objective 1.03: Explain ways to adapt housing to meet special needs.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
Learning, Health, and Safety Capital Project Alternates and Change Order
Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2011 Exhibition of School Planning and Architecture.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
October 19, 2011 Construction Progress Report. Construction Progress Report – October 19, 2011 Contract sum to date:$ 162,736,722* Total completed to.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Residential planning. Zones Social: public area and most used portion of the home. Comprised of the entry, family room, living room, media room, game.
Welcome to the Stafford Elementary Town Hall Meeting! January 12, :30-7:30 pm Mary W. Foreman, Stafford Elementary Principal Alexis White, Stafford.
An overview of School health and safety AT THE DESIGN STAGE
White Pigeon Community Schools
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
Jill Berset, CTE Director
OABCIG General Obligation Bond Referendum Presentation
Cornwall Central School District
Dr. Joseph Meloche Superintendent of Schools Mrs
May 8, 2018 Bond Program.
2018 Bond Review and Proposal
2007 Bond Issue Capital Improvement Program
Building & Property Committee
Recent Bond Accomplishments
WES Renovation Update Photo Gallery
PE/MULTI-PURPOSE ROOM COVERED OUTDOOR LEARNING CENTER
Master Facilities Committee Evaluation and Identification
Factors in residential design/Traffic patterns
Floor Plans and Symbols
Where do you go from here?
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
EAST PENNSBORO AREA SCHOOL DISTRICT
Zumbrota-Mazeppa School District Community Survey Results
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around; area is used during the day for playground and deliveries New parking and sidewalks Gate separates bus traffic from other traffic Addition of 5 parking spaces from existing parking lot size North end of parking area has been revised to turn parking direction Bus drive has been revised to ease turns

Concept Features Early childhood will be placed in existing classroom Two existing classrooms with be combined to create the 4K classroom A new accessible bathroom and new storage room will be created in the 4K classroom Casework will be relocated and sinks will be added in the 4K classroom (north end) A new bathroom with roll-in shower and area for changing table will be created adjacent to the early childhood classroom New access doors between the OT/PT, early childhood and special education classrooms

Concept Features New student bathrooms created in this area New staff bathroom created Convert shop storage rooms into maintenance shop with exterior overhead door and interior doors Create Ag activity lab with food science stations Create Ag lab for animal and plant sciences with exterior overhead door and windows Provide new electrical and ventilation for revised metal shop Provide new electrical, ventilation and dust collection for STEAM and woods lab with windows and doors to promote collaboration

Concept Features Provide new curtains, lighting and sound system for stage area Coordinate kitchen and serving equipment in the commons with new theatrical system storage Provide new finishes for commons Fill in pit floor in band room Provide new ramp up to stage level Provide chair lift up to stage level

Concept Features Remove risers and convert computer lab into 2 special education classrooms Remove riser and convert IT workroom into special education classroom Construct living skills area with kitchenette and laundry areas in a shared area between and connecting the special needs classrooms Construct accessible toilet room as part of the suite Construct accessible toilet for specific student needs that can be removed or altered in the future

Concept Features Provide high school collaboration area by removing walls from two classrooms Construct quiet study or collaboration room Remove accordion partitions and construct permanent walls in existing classrooms Provide sliding glass doors in existing walls to promote access to collaboration areas Provide flexible furnishings and writable walls in collaboration area

Concept Features Secure entry concept where all visitors must travel through the office to gain access during school hours New entry is more open and welcoming New accessible entry with stairs and ramp New addition houses offices for administration to create space internally for middle school area New space includes bathrooms for middle school area Spaces incorporate all high school and middle school administrative spaces in one area

Concept Features Middle school is separated from the school by doors at both ends of the corridor Middle school lockers will be contained within the middle school area Toilet rooms and staff toilet are provided within the middle school area Provide middle school collaboration area by removing walls from two classrooms Provide sliding glass doors in existing walls to promote access to collaboration areas Provide flexible furnishings and writable walls in collaboration area Provide new science lab for middle school

Concept Features Remove existing lab stations and casework Provide new fixed classroom casework for lab stations with movable lab tables for flexibility Update science lab infrastructure including electrical, plumbing, gas and ventilation Provide lab stations for 28 students in all labs including new middle school lab

Concept Features Create new two-story entry from west parking lot including open stairway to second level and elevator serving existing locker rooms area and main floor of school Create new school and community fitness center with separate entrance that can be open without opening the entire school Create changing rooms and locker area for community members to use fitness center Allow for future addition of fitness mezzanine inside new fitness center Old weight room area is available for storage and other uses