PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%

Slides:



Advertisements
Similar presentations
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.
Advertisements

Construction material – All the material has been ordered with some spare (10%) Material Procurement Faraday cage – Final FEE board dimensions available.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
PCB issues requirements & procurement MMM Würzburg, 30/01/2014J. Wotschack1.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
MM construction organization Some thoughts MMM Saclay, 18/04/2013J. Wotschack1.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
MM detector construction One or several modules per sector considerations.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of MWPC production and quality control The measure of the gas leakage, is obtained by correcting the P(t) behavior by using the data of the reference.
Status of NA62 straw electronics Webs Covers Services Readout.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Panel production status Panels needed according to official plan Oct-05 A rate of 250/month is mandatory to match the chamber production schedule.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Material procurement Panels 1300 produced (over 5700 planned) – Stop of the production in August (still at 50% of FR4 sheets delivered by ELTOS) – Restarted.
22AUG07 Gun System Update1 Rich Andrews. 22AUG07 Gun System Update2 Gun System Coaxial coupler Gun Cavity Solenoid Magnet Compensator Magnet.
G. Carboni - Muon Meeting – Draft Agenda Muon Meeting 6 April 2004 Introduction (15 min) Total 15 min MWPC prodution Material supplies,
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Supervisor services. Project manager Technological group Chief supervisor Supervisors facilities HSE Quality engineer HSE engineer Administrative support.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
G. PassalevaFirenze - September 8, 2004 Production Readiness Review Firenze MWPC Production Site G. Passaleva.
G. Passaleva Status of MWPC production site in Florence G. Passaleva.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Production and installation plan Construction sharing Production plan Installation sequence Material procurement P. Campana LNF – LHCb Muon EDR Cern April.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Activity report from LNF Panels Soldering tests Production site and tooling status WPC miscellanea (+7 cm layout, cathode costs, aging tests)
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Profiler Mechanics Update
University of Wisconsin
RPC built a new plastic (peek doped with CB)
T1 status (a selection from EDR presentations)
G. Carboni for the Muon Group
To do list production organization and commitments
Status of MWPC production and quality control
Preparations for test of
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
Testbeam status report
Limited Streamer Tube Project Summary
Presentation transcript:

PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100% Material Procurement Construction material – All the material has been ordered with some spare (10%) Delivered material PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100% PNPI – M2R4 – Panels 20% - HV bars 100% - FR4 frames 100% PNPI – M4R4 – Panels 0% - HV bars 90% - FR4 frames 0% CERN – Panels 60% INFN – M3R3 completed – M2R3 ~ completed – M5R4 Panels 20% HV bars ~ 40% FR4 frames 100% Other elements 100% M1 panels 0% Faraday cage – Final FEE board dimensions – M3R3 ready – All the others need the preparation of drawings (M3R4-M2R3-M5R4+....) Honeycomb panels - We got samples of M1R3/R4 regions, cut at the right dimension and a quotation. Early 2005 we should go for the purchase and the production.

Panel production A strict monitoring of the panel quality and of the production rate is performed with regular visits (every two weeks) to the company and with checks at the production site. This is certainly the most critical item on the chamber and the production has to be followed closely. The required planarity is very demanding (+- 90 micron) especially on the largest panels (400 x 1600 mm2) A rate of 250/month is mandatory to match the chamber production in the various sites (see next plots). To monitor the production yield a data base on each INFN site is operational. This tool helps also to have a more efficient chamber production. The yield appears quite good: approximately 90% . We are also developing a tool to recover non planar panels (especially the gold plated one, which are the most expensive).

Panels needed at production sites according to official plan

Preliminary plans to equip and to install chambers Once the chamber have been tested with radioactive source, FEE electronics, LV and Faraday Cage must be assembled on chamber (and tested). Part of this work will be done at the production sites (at LNF, for whole INFN, at PNPI and at CERN). Probably, for PNPI chambers, electronics will be assembled at CERN. The first chambers will be equipped as soon the CARDIAC boards will be available. Shipping of INFN chambers to CERN: in special trolleys with shock absorbers stocked in a container (see photo). Shipping of PNPI chambers: in wooden boxes (CSC-CMS like) Reception at CERN : about 200 m2 available (not so much) Gas flux – last test with HV – Installation on the detector We have yet to deploy a detailed plan for this part of the installation: check the time and the personnel needed; logistics at CERN and the infrastructure needed (gas, HV, etc...) setup the procedures and the team for the installation on the detector (integration among various labs)