G. Passaleva Status of MWPC production site in Florence G. Passaleva.

Similar presentations


Presentation on theme: "G. Passaleva Status of MWPC production site in Florence G. Passaleva."— Presentation transcript:

1 G. Passaleva Status of MWPC production site in Florence G. Passaleva

2 Tooling status

3 G. Passaleva Tooling status

4 G. Passaleva Clean room.

5 G. Passaleva Chamber shipping According to Danilo’s presentation at the LHCb week, ROME II is able to test 20 chambers/month matching the regime production yield of Ferrara+Florence One shipping/month from Fe + Fi is adequate –Shipping cost is 100-150 € –Need 4 boxes of 1x1x2 m 3. Cost about 500 € each. Need stocking place in ROME II Chambers tested in ROME II can: –A) stay in ROME II –B) be shipped to Frascati In either cases need large stocking area waiting before final shipping to CERN. Another option is to send the chambers to CERN periodically  stocking place at CERN


Download ppt "G. Passaleva Status of MWPC production site in Florence G. Passaleva."

Similar presentations


Ads by Google