Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
Advertisements

Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
US Production Report - September 4, Incandela 1 US Production Report CMS Tracker Steering Committee 4 September 2003 J. Incandela University of.
Slide 1X-Calibration Common Testing Issues-Anthony AffolderModule Testing Meeting, June 3, 2003 X-Calibration Common Testing Issues: Grounding, Environmental.
Recent TOB Developments First LT failure and Stereo Module Status J. Incandela With slides provided by E. Chabalina, A. Affolder, Dean White.
CMS Week – UCSB Gantry Status – March 15, 2005 – Dean White 1 Weekly Status Report Production: 84 hybrids bonded last week, all tested fine. 45 modules.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
Finding ST Sensors that cause CMN: A Follow up to TSC Meeting N. 215 Prof. J. Incandela UC Santa Barbara US CMS Tracker Project Leader Tracker Steering.
1 CMN Problem Review-Anthony AffolderTPO, December 11, 2003 Review of CMN Problem/Studies Ariella requested me to review the current understanding of the.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
INFN and University of Florence Test Beam Meeting Tracker Week
INFN and University of Florence Test Beam Meeting Tracker Week
UCSB Hybrid Bonding & Testing
On behalf of the US TOB testing group
UCSB Testing Status Anthony Affolder
Update of US Testing Status
US Module Production Status
UCSB Testing Status Anthony Affolder
Review of CMN Problem/Studies
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Results from module testing
UCSB Testing Status Anthony Affolder
US Module Production Quality
Recent TOB Developments
Module Failures on RODs
Module Failures on RODs
On behalf of the US TOB testing group
US Testing Update Anthony Affolder (On behalf of the US testing group)
The measurement set-up
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Noise in TOB modules and sensor quality
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
UCSB Qualification Module Grading
Hybrid & Module Electrical Testing
Hybrid Status/Deliveries
Sensor probing (Summary)
First UCSB TEC Module (Pictures)
Hybrid & Module Testing Status
Anthony Affolder UC Santa Barbara
Module Testing in Florence Carlo Civinini INFN-Florence
Noise in TOB modules and sensor quality
US Module Testing Progress Report
Production Status 39 modules produced
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Operations/Failure Analysis
FNAL Hybrid Testing Status
Electrical Testing at UCSB: Hybrids, Modules, & Rods
Is Increased Bias Current and CMN Correlated?
TOB Module Production Overview and Plan
FNAL module testing summary
Hybrid & Module Testing Status
Wirebonding UCSB FNAL Machines
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Recent TOB Developments
Module Failures on Rods
Module Testing Status Week of 3/14-3/18.
US Module Testing Progress Report
Hybrid & Module Testing Status
Equipment Status ARCS equipment status DAQ equipment status
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
Presentation transcript:

Recent TOB Developments First LT failure and Stereo Module Status J. Incandela With slides provided by E. Chabalina, A. Affolder, Dean White

Module 705 before LT After assembly module was tested (09/08) on ARCS at 400 V and graded “B” (6 faulty channels). No problems observed.

Module 705: LT data Data was taken at 20°C on Sept.19 (10 days after the first test). A group of high noise channels is seen around channel 219 and increased CMN is seen in chip #2

Module 705 after LT - I Module was re-tested on ARCS on 09/23. High noise in channel #219 and high CMN is observed at 400 V. At 200 V channel #219 has only slightly higher noise than the rest of the channels

Module 705 after LT - II On ARCS kept module at 400 V for 30 minutes before testing (to allow current settle down) CMN did not go away, it became even higher

Comparison of IV curves ”before” measurement is taken on 09/08 on ARCS before LT “after” measurement is taken on 09/23 on ARCS after LT green curve is a measurement done using Keithley on 09/24 with 1 minute interval between steps No visual defects are observed on the sensors around noisy channel #219 At this point we can’t conclude whether the effect we observe is due to thermocycling or if it is some other effect

Why be concerned Several people have argued that this may not be a real problem for several reasons: It is mainly occurring at high bias voltages It causes only a small amount of Common Mode Noise (CMN) The noise is removed by CMN subtraction in the FED. In fact we see evidence that all of the above are false at significant levels. It may be that more sophisticated CMN removal algorithms are needed and hopefully the FED is capable of running them It may be that the new ST sensors have a drastic reduction in this problem We will study 110 or so recent ST sensors sent to the US (thanks Manfred et al.) as soon as they clear customs.

CMN Turn-on Voltage

Common Mode Subtracted Noise 25 ADC 6.5 ADC 869 881 1010 1011 1013 1014 1015 1016 1030 1031 1038 1042 (Peak Off) Modules with CMN (micro-discharge problem) Common mode subtracted noise in blue For majority of modules with problems, the CM subtraction is imperfect. 7 of 12 have >2.0 ADC noise 3 of 12 have more than twice the usual noise

Common Mode Subtraction Variation Module 1010 Module 1016 Common mode subtraction results clearly vary Answer differs mode-to-mode or test-to-test Would yield varying signal efficiency/noise during data taking Not clear how this will evolve with time/radiation

UCSB Stereo Module Production UCSB Stereo plate completed on schedule Tested via dry runs and produced results as good as the r-phi plates “right out of the box” We made a fixture to attach the cable stiffener on our hybrids. First hybrid retrofitted last week. Tested cable by making/unmaking connection 20 times by hand. No apparent problem with functionality and no signs of cracking.

First Stereo Module First Stereo TOB module made at USCB Well within specs mechanically and functions very well Kapton circuit was missing a trace for bias. We made it by hand with Ag Epoxy. Otherwise this is a Grade A module! First TOB SS6 module to be made today.