Update on Derogation Reporting

Slides:



Advertisements
Similar presentations
1 Reportnet – an introduction Reportnet – an introduction Presentation for the Meeting on Noise Copenhagen, 12 November 2008 Søren Roug, EEA
Advertisements

Reportnet Reportnet is a system of integrated IT tools and business processes creating a shared information infrastructure optimised to support European.
1 Introducing Reportnet Miruna Badescu. 2 A linear view of Reportnet process.
DIGIT Directorate-General for Informatics DIGIT Directorate-General for Informatics EUSURVEY Creating online surveys DIGIT EUSURVEY SUPPORT.
EVA/Minerva, Nov Mariane Aaron The process of uploading items to Europeana, through real-life example of Eretz Israel Museum.
1 Reportnet for Noise: Feedback from member countries Colin Nugent Eionet National Reference Centres for Noise meeting Copenhagen October 2009.
Welcome to the World of Wikis Classroom Management: An Evidence-Based Independent Study Instructions for Navigating the wiki and submitting projects.
Walk through the reporting process for Barcelona Convention using Reportnet Miruna Badescu, Giuseppe Aristei.
Case Study SummaryChallenges UPS is the world's largest package delivery company and a provider of supply chain management solutions. Their office in Brazil.
Central Data Repository introduction What does it do? Session I.
1 Reportnet – an introduction Reportnet – an introduction Presentation for the Meeting on IPPC/WI Brussels, 3 March 2009 Søren Roug, EEA
European Topic Centre on Biological Diversity EIONET NRC Meeting on Biodiversity October 2011, Copenhagen Progress.
1 12/11/2015 WFD2016 Reporting Workshop under the Common Implementation Strategy of the Water Framework Directive (WFD) - Introduction to Reporting Guidance.
HaBiDeS+ the new EU tool for reporting derogations under the EU Birds and Habitats Directives, and the Bern Convention Expert Group on Birds and Habitats.
Reportnet – progress and next steps Søren Roug European Environment Agency.
Art. 17 reporting process Using the IT tool Art. 17 reporting process Using the IT tool Miruna Bădescu Sheila Cryan Søren Roug Rania Spyropoulou 17 October.
TUSK - Faculty Overview. General information Describe your course material: Create and modify course objectives Outline the attendance and grading policies.
Elsevier Operative Techniques - Netter Process Flow
TUSK - Faculty Overview
RMS Overview PRI Registrar.
eSubmission PSUR XML Delivery File
Gibraltar Financial Services Commission
Results of Questionnaire 24 Nov 2011
Let’s Respond Toolkit Website Introduction
Delivering electronic Natura 2000 data via Reportnet CDR
Natura 2000 dataflow & Standard data forms
Delivering electronic data via Reportnet Central Data Repository
Delivering electronic Natura 2000 data via Reportnet CDR
Progress on Natura 2000 filtered database
Sharing of Eurostat predefined tables
Public access to Natura 2000 geo-database
HaBiDeS+ the new EU tool for reporting derogations under the EU Birds and Habitats Directives, and the Bern Convention Reporting Expert Group meeting of.
HABIDES Reportnet System
Habitats Committee, March 2010
New Guides on social security where are we now?
Habides update (May 2011).
Technical update 14th of June 2016
Sharing of Eurostat predefined tables
HaBiDeS+ a new EU tool for reporting derogations under the EU Birds and Habitats Directives, and the Bern Convention Reporting Expert Group meeting of.
EUROPEAN STATISTICS ON THE INE WEBSITE
Marine Strategy Framework Directive State of play and follow up
European Commission DG Environment
Natura 2000 dataflow (1) QA/QCs for Natura 2000 dataflow is now up and running (completeness & consistency of the tabular data) Individual QA/QCs now uploaded.
Action Points 16th meeting of the Working Group on
The Biodiversity Information System for Europe (BISE)
Marine Environment and Water Industry Unit
Update on Derogation Reporting
MSFD Article 11 reporting Monitoring programmes
Expert Group on Reporting under the Nature Directives
Expert Group on Reporting 2nd December 2010
Natura 2000: points of information
10th meeting of the Expert Group on Reporting (24 November 2011)
8th meeting of the Expert Group on Reporting (2 December 2010)
Update on Derogation Reporting
The Biodiversity Information System for Europe (BISE)
Update on Derogation Reporting
On-going work on Art 17 & Art 12 - agenda item 6
Reportnet 3.0 Requirements Catalogue
Reports from Member States on:
Habides: current status
Reporting for MSFD Article 13 and 14 –
Reportnet 3.0 Database Feasibility Study – Approach
Technical format/tools for reporting under BWD 76/160/EEC
Reports from Member States on:
Speaking the language of publishing. Worldwide
Natura 2000 & Article 17 databases: their potential use in the frame of the Prioritised Action Framework (PAF) Frank Vassen, Unit D3 – nature conservation,
Update on Derogation Reporting
Update on Derogation Reporting
State-of-play of current Water Directive integration into WISE
Presentation transcript:

Update on Derogation Reporting Reporting on derogations under Art. 16 of the "Habitats" Directive (HD) / Art. 9 of the "Birds" Directive (BD) Frank Vassen, DG.ENV B.3 – Nature Expert Group on Reporting, 17 Nov. 2015

Ongoing issues Most national reports are now submitted according to the new Habides+ reporting (.xml file) format National reports can from now on be downloaded from Reportnet as Excel files (provided they are public) Additional language versions of Habides+ Webforms tool are in preparation, MS will be invited to provide feedback EU report to the Bern Convention 2011-12 currently under preparation

Overview tables Overview tables with links to national reports in Reportnet will be published in CIRCABC and signaled in DG ENV website. The tables provide an overview on delivery and accessibility of national reports but they do not provide any assessment of their contents.

Legend: In the next slide a simplified version of the tables will describe the current situation but the actual tables will include more information such as: Reports not confirmed as complete; Absence of derogations in a specific period; Indications on accessibility of reports. Report not received. A report that is not accessible on Reportnet because locked from public view by national authorities, or not uploaded to Reportnet and sent directly. Report received (independently from its quality).

Current situation

Next steps Development of a public online search tool for derogations (2016/17) Content based presentations to the reporting group/ NADEG to be considered