IEEE Motion at the July EC Closing Meeting

Slides:



Advertisements
Similar presentations
Doc.: Submission1 IEEE Motions in November Plenary DCN: Title: Request for EC Conditional Approval Date Submitted:
Advertisements

Doc.: IEEE /0054r00 Submission March 2013 Apurva N. Mody, BAE SystemsSlide 1 IEEE P Motions at the March Plenary EC Meeting IEEE P
P802.16q to Sponsor Ballot: Conditional Approval Request 17 July 2014 IEEE Gdoc.
Doc.: IEEE /0011r00 Submission March 2015 Apurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the March EC Closing Meeting IEEE P Wireless.
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: IEEE /0034r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 March Plenary Closing Report IEEE P Wireless RANs Date: Authors:
Doc.: IEEE /0144r01 Submission February 2015 Apurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the February EC Telecon IEEE P Wireless.
Doc.: IEEE /0792r0 Submission July 2008 Adrian Stephens, Intel CorporationSlide TGn Editor Report July 2008 Date: Authors:
Doc.: Submission1 IEEE Motions in March Plenary DCN: Title: Request for EC Unconditional Approval Date Submitted:
Doc.: IEEE /0032r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE P Motions at the March 2012 Plenary EC Closing Meeting IEEE P
Doc.: IEEE /0023r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the July EC Closing Meeting IEEE P Wireless RANs.
Month Year IEEE Motions in July, 2016 Plenary
Month Year IEEE Motions in July, 2017 Plenary
November Plenary Closing Report
November 2008 doc.: IEEE /1437r1 July 2011
IEEE P Motions at the November 2011 Plenary EC Closing Meeting
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE P Motions at the November 2011 Plenary EC Closing Meeting
IEEE P Motions at the November 2011 Plenary EC Closing Meeting
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE P Motions at the November 2011 Plenary EC Closing Meeting
IEEE P Motions at the July Plenary EC Meeting
doc.: IEEE <doc#>
P802.11z conditional approval report to ExCom
P802.16Rev4 to Sponsor Ballot: Conditional Approval Request
Working Group March Plenary EC Closing Motions Package
Procedural review of initial WG ballot on P802.1CF
October Supporting Material and Motions for the EC Telecon October 2, 2018 Bob Heile, Chair Bob Heile, Wi-SUN Alliance.
March Plenary Opening Report
IEEE Motions at the November Plenary EC Meeting
October Supporting Material and Motions for the EC Telecon October 2, 2018 Bob Heile, Chair Bob Heile, Wi-SUN Alliance.
November Plenary Closing Report
IEEE Motions in July Plenary DCN:
July Plenary Opening Report
IEEE Motion at the February EC Telecon
November 2010 doc.: IEEE /0872r4 November 2010
November Plenary Opening Report
Month Year IEEE Motions in July Plenary DCN:
2013 March Plenary Closing Report
Closing IEEE 802 EC Friday 15th March 2019
July Plenary Closing Report
Sponsor Ballot Comment Resolution
Closing IEEE 802 EC Friday 15th March 2019
Closing IEEE 802 EC Friday 15th March 2019
IEEE P Motions at the March 2012 Plenary EC Closing Meeting
IEEE Motion at the February EC Telecon
July Plenary Closing Report
March Plenary Opening Report
IEEE MEDIA INDEPENDENT HANDOVER
November 2010 doc.: IEEE /0800r9 November 2010
November Plenary Opening Report
November 2008 doc.: IEEE /1437r1 August 2010
Overview of WG Letter Ballot Process
November Plenary Opening Report
March Plenary Closing Report
IEEE Revision Timeline
July Plenary Opening Report
TGn Editor Report Sept 2008 Date: Authors:
Motion via Ballot IEEE motion Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot.
Motion via Ballot Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot Motion Start: May.
IEEE P Motions at the July Plenary EC Meeting
IEEE P Motions at the July Plenary EC Meeting
IEEE MEDIA INDEPENDENT HANDOVER
November 2010 doc.: IEEE /0800r9 November 2011
P b to RevCom: Conditional Approval Request
November Plenary Closing Report
IEEE P Motions at the July Plenary EC Meeting
IEEE July Plenary Working Group Motions
P802.16Rev4 to Sponsor Ballot: Conditional Approval Request
IEEE July Plenary Working Group Motions
Presentation transcript:

IEEE 802.22 Motion at the July EC Closing Meeting Month Year doc.: IEEE 802.22-yy/xxxxr0 July 2015 IEEE 802.22 Motion at the July EC Closing Meeting IEEE P802.22 Wireless RANs Date: 2015-07-17 Authors: Apurva N. Mody, BAE Systems John Doe, Some Company

July 2015 Motion Motion for Approval to Forward the IEEE P802.22b (Amendment on Enhancements for Broadband Services and Monitoring Applications) to the IEEE SA-RevCom Slide 2 Apurva N. Mody, BAE Systems

IEEE P802.22b Sponsor Ballot History and Statistics July 2015 IEEE P802.22b Sponsor Ballot History and Statistics IEEE Sponsor Ballot Launch Date # of Comments Received Comment Resolution Status Response Ratio Approval Ratio Draft Status SB #1 (P802.22b Draft v4.0) 8th Feb – 10th March 2015 33 Comments were addressed and Resolved 84% 100% P802.22b Draft v5.0 Prepared SB Re-circ #1 (P802.22b Draft v5.0) 29th April – 9th May 2015 2 86% P802.22b Draft v6.0 Prepared SB Re-circ #2 (P802.22b Draftv 6.0) 26th May to 6th June 87% P802.22b Draf v6.0 to the IEEE SA-RevCom Slide 3 Apurva N. Mody, BAE Systems

Motion for Approval to forward the IEEE P802.22b to the IEEE SA RevCom July 2015 Motion for Approval to forward the IEEE P802.22b to the IEEE SA RevCom Vote Tally on the P802.22b Sponsor Ballot Re-circ #2 on P802.22b Draft 6.0 Apurva N. Mody, BAE Systems

Motion for Approval to forward the IEEE P802.22b to the IEEE SA-RevCom July 2015 Motion for Approval to forward the IEEE P802.22b to the IEEE SA-RevCom We received Two Comments during Re-circulation Ballot #2 on Draft 6.0. One Technical and the Other Editorial. Both of these comments are NOT  ‘Must be Satisfied’ and the Votes from the Commenters are to Approve the P802.22b Draft 6.0.   The P802.22b Ballot Resolution Committee addressed and resolved the comments. They have been uploaded to MyProject and may also be found on the Mentor – https://mentor.ieee.org/802.22/dcn/15/22-15-0015-00-0000-p802-22b-sponsor-ballot-re-circ-2-comment-resolutions.xlsx Apurva N. Mody, BAE Systems

Motion for Approval to forward the IEEE P802.22b to the IEEE SA-RevCom July 2015 Motion for Approval to forward the IEEE P802.22b to the IEEE SA-RevCom Comment on P802.22b Draft 6.0 and their Resolution   Comment Disposition Status Disposition Detail [TECHNICAL COMMENT - MUST BE SATISFIED – ‘NO’] I like most new structures. Optimized and extensible . However, has anybody measured application data throughput vs bandwidth used by overheads of complex MAC management frames and PHY level complexities? Does it make sense to review the spec from a perspective of reducing overheads (it would be great to identify choice points to better network bandwidth utilization by trading off with higher latencies, limited functionalities, stricter sequencing guidelines like max unsolicited bandwidth allocations per sub-frame or limited number of self-coexistence allocations depending on traffic in A-WRAN cell etc.). Maybe many of the header check sequences can become optional if the network is measured to be good and will become required only in noisy networks at a threshold? Existence or absense of HCS can be indicated by the size of these headers... Rejected This is an invalid comment, since the commenter makes a suggestion to optimize the P802.22b MAC but fails to identify changes in sufficient detail so that the specific wording of the changes can be determined. Conducting some study to review the spec from the perspective of reducing overhead is a good general suggestion but is not actionable. The Commenter points out that perhaps the Header Check Sequences (HCS) can become optional if the network is measured to be good. However, he does not specifically provide any actionable wordings such that any changes to the draft may be made. Also, the commenter needs to note that since this is a Re-circulation, a balloter can only change his or her vote based on the changed portions of the draft or on the unresolved negatives. Balloters cannot change their vote based on clause(s) previously seen and approved (unless that clause is affected by the new material). The Balloter has provided a General Comment but it does not pertain to any Clause that had been changed during the previous ballot or on any unresolved negatives. Hence the P802.22b Ballot Resolution Committee Rejects this comment. [EDITORIAL COMMENT] There may be a typo in 9a.7.2.2 Puncturing, In the crossed-out text you list the referenced subclause as "9.7.2.1.2." However, the new text refers to "9.7.1.2." I am not sure if you made a purposeful update or if this is simply a typo. Accepted The list of subclause is a typo. Please change "9.7.1.2" to "9.7.2.1.2" during the publication process.

Rules for Forwarding the Standards to IEEE SA RevCom July 2015 Rules for Forwarding the Standards to IEEE SA RevCom [IEEE 802 LMSC Operations Manual, v16 Revised November 7, 2014 Page 16] Conditions: Recirculation ballot is completed. Generally, the recirculation ballot and resolution should occur in accordance with the schedule presented at the time of conditional approval. – CONDITION SATISFIED After resolution of the recirculation ballot is completed, the approval percentage is at least 75% and there are no new valid DISAPPROVE votes. – CONDITION SATISFIED No technical changes, as determined by the WG Chair, were made as a result of the recirculation ballot. CONDITION SATISFIED No new valid DISAPPROVE comments on new issues that are not resolved to the satisfaction of the submitter from existing DISAPPROVE voters. CONDITION SATISFIED If the WG Chair determines that there is a new invalid DISAPPROVE comment or vote, the WG Chair shall promptly provide details to the Sponsor. N/A The WG Chair shall immediately report the results of the ballot to the Sponsor including: the date the ballot closed, vote tally and comments associated with any remaining disapproves (valid and invalid), the WG responses and the rationale for ruling any vote invalid. DETAILS PROVIDED TO THE EC BY AN E-MAIL DATED JUNE 28 2015 Apurva N. Mody, BAE Systems

P802.22b WG Motion – Document – 22-15-0022 Rev0 July 2015 WG Motion P802.22b WG Motion – Document – 22-15-0022 Rev0 The 802.22 WG affirms that the P802.22b Draft 6.0 meets all the requirements of the P802.22b PAR and grandfathered 5C (22-11-0119-04-0000). The 802.22 WG authorizes the WG chair to seek approval from the IEEE 802 Executive Committee to forward P802.22b Draft 6.0, which has met all the conditions as stated in the IEEE 802 operations manual, to the IEEE SA RevCom. Move: Chang-Woo Pyo Second: Gabriel Villardi For: 5 Against: 0 Abstain: 0 Motion Passes with Unanimous Consent. Slide 8 Apurva N. Mody, BAE Systems

Second: Steve Shellhammer For: Against: Abstain: July 2015 Motion for a Approval to forward the IEEE P802.22b Draft 6.0 to the IEEE SA RevCom EC Confirms the P802.22b PAR and the 5C and Moves to grant approval as per the IEEE 802 Operations Manual to forward IEEE P802.22b Draft 6.0 to the IEE SA- RevCom. Move: Apurva N. Mody, Second: Steve Shellhammer For: Against: Abstain: Any Objections, No Objections Heard Motion Passes Slide 9 Apurva N. Mody, BAE Systems

Motion Motion to Approve the Press Release on Completion of the P802.22b Amendment on Enhancements for Broadband Services and Monitoring Applications Slide 10 Apurva N. Mody, BAE Systems

July 2015 Working Group Motion for Approval of the Press Release on the Completion of the P802.22b Amendment The 802.22 WG approves the Press Release (PR) on the approval of the IEEE Std. 802.22b Amendment on Enhancements for Broadband Services and Monitoring Applications by the IEEE as contained in document 22-15-0020-00-0000. The 802.22 WG authorizes the Chair to make a motion to the EC seeking approval to release this PR and make any additional changes based on comments from the EC or the IEEE-SA. Move: Chang-Woo Pyo Second: Gabriel Villardi For: 5 Against: 0 Abstain: 0 Motion passed with unanimous consent. Apurva N. Mody, BAE Systems

EC Motion to Approve the P802.22b Press Release July 2015 EC Motion to Approve the P802.22b Press Release IEEE 802 EC approves the the P802.22b Project Completion Press Release (PR) as Provided in Document 22-15-0020-00-0000. Move: Apurva N. Mody Second: Steve Shellhammer For: Against: Abstain: Motion passes/ fails Apurva N. Mody, BAE Systems

References IEEE 802.22 WG July Plenary Motions – 22-15-0022 Rev0 802.22 WG Policies and Procedures – 22-04-0001 Rev0 P802.22b Draft v4.0 Comment Database – 22-15-0009 P802.22b Draft v5.0 Comment Database – 22-15 -0013 P802.22b Draft v6.0 Comment Database – 22-15-0015 P802.22b Coexistence Assurance Document – 22-14-0141 Rev1 P802.22b PAR Form – 22-11-0118 Rev4 P802.22b 5C Document - 22-11-0119 Rev4 Slide 13 Apurva N. Mody, BAE Systems

IEEE P802.22b WG History and Statistics July 2015 IEEE P802.22b WG History and Statistics IEEE WG Letter Ballot Launch Date # of Comments Received Comment Resolution Status Response Ratio Approval Ratio Draft Status WG LB #1 (P802.22b Draft v1.0) Oct 2nd – 31st 2013 232 (27 TR / 4ER) Comments were addressed and Resolved 75% 57.9% P802.22b Draft v2.0 Prepared WG LB #2 (P802.22b Draft v2.0) April 12th - May 11th 2014 97 (10TR / 4ER/ 36 T) 78.1% 90.9% P802.22b Draft v3.0 Prepared WG Re-circ #1 (P802.22b Draftv 3.0) Oct 14th – Oct. 28th 2014 26 (10TR / 3T) 84.3% 95.6% P802.22b Draft v4.0 Prepared WG Re-circ #2 (P802.22b Draft v4.0) Jan 13th – 27th 2015 N/ A 100% P802.22b Draft v4.0 to be forwarded to the Sponsor Ballot P802.22b is ON TRACK to reach the Sponsor Ballot by December 2014 Apurva N. Mody, BAE Systems Slide 14