Presentation is loading. Please wait.

Presentation is loading. Please wait.

Working Group March Plenary EC Closing Motions Package

Similar presentations


Presentation on theme: "Working Group March Plenary EC Closing Motions Package"— Presentation transcript:

1 802.22 Working Group March Plenary EC Closing Motions Package
Apurva N. Mody Chair, Working Group

2 802.22.3 - Standard: Spectrum Characterization and Occupancy Sensing , PAR Modification, and CSD
The Working Group received the same comment from and Working Groups Comment: CSD a) misspelled “Characteization” – change to “Characterization” Comment Resolution WG Accepts the change as proposed by the WG. Changed “Characteization” –to “Characterization” Apurva N. Mody (BAE Systems)

3 802.22.3 – Additional Comments from Paul Nikolich
Regarding the PAR extension request, please consider adding or revising the following to your request:  Active participation: 6 to 10 Comment Response: Agree. We have made the corresponding change to the PAR Form which shows that the Number of Active Participants are 10 Apurva N. Mody (BAE Systems)

4 802.22.3 – Additional Comments from Paul Nikolich
Most recent WG ballot numerical result: Y/N/Abs/DNV, Total Number of Voters: 18 excluding the ex-officio who did not vote Ballot Start Date: October 2017 Ballot End Date: November 2017 Approve 6 Disapprove 1 Disapprove with  comments 5 Abstain 2 DNV 4 TOTAL 18 Return Ratio: 78% Approval Ratio: 43% Working Group Letter Ballot on Draft 3.0 started in Feb It is on-going

5 802.22.3 – Additional Comments from Paul Nikolich
Approximately the number of comments received: Ans: 95 for WG Letter Ballot 2 Approximate page count of most recent draft: Ans: 106 Pages Estimate the number of WG recircs needed before starting Sponsor ballot: Ans: 3-4 Estimate when Sponsor ballot will begin and complete: Ans: Begin in March 2019 and End in December 2019

6 Motion for Approval of the 802.22.3 PAR Modification
Motion Text EC approves the modified P PAR and CSD Documents as shown in and authorizes the WG chair to submit them to NESCOM Move: Apurva Mody Second: Steve Shellhammer For: Against: Abstain: Background - Working Group Motion Working Group motion to approve the modified PAR and CSD documents passed 5 Approve/0 Disapprove /1 Abstain Rules Reference Clause 9.2 of the Operations Manuel Other

7 802.22.3 - Standard: Spectrum Characterization and Occupancy Sensing , PAR Modification, and CSD


Download ppt "Working Group March Plenary EC Closing Motions Package"

Similar presentations


Ads by Google