D7 or C1: -1: Tip-tilt B-OSEMs, D25 -2: VOPO suspension A-OSEMs, D25

Slides:



Advertisements
Similar presentations
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
Advertisements

Optical Manufacturing Solutions 1 Probe Assembly.
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
Manual for Appliances, Tools, and Materials in the New Millennium Hall Auditorium.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Pursuit of Better testing Instrument Let's go in the grandway......
BSC Cable Trays … again: Evaluation of an LLO Proposal for an Alternative Design G v31.
Case Study – Application of Sensors in measuring torque and thrust produced by propellers in small unmanned quad-rotor helicopter.
TCC2-TDC2 working group Handling means for the TAX repairs JL GRENARD EN-HE 21th September 2011.
Linac Laser Notcher Status David Johnson Todd Johnson, Vic Scarpine, Andrea Saewert, John Sobolewski PIP Meeting March 6, 2013 Beams Doc 4306.
Compressor status AWAKE Technical Board meeting 19 May 2015.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
Jose Luis Sirvent Supervisor: Jonathan Emery Student Meeting 24 October 2011.
CONSTRUCTION BLUEPRINT READING
Cabling and connectors for future LAV stations Mauro Raggi LAV working group CERN 26/10/2009.
Fiber Optics LINK LOSS BUDGET.
VAC – CTRL SYS 8 Feb VAC : MSRC equipment Central area links, to be discussed Ion Tmp aux.
GERDA collaborationmeeting, Ringberg castle Béla MajorovitsTG5 Review: Infrastructure on top of the tank1.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
INSTRUCTIONS We are looking to develop a detailed understanding of what information about an Platform needs to be displayed somewhere in the user interface,
Instrumentation (AMME2700) 1 Instrumentation Dr. Xiaofeng Wu.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
U N C L A S S I F I E D Progress Report on the Dual-Use Cryostat John C. Ramsey Los Alamos National Laboratory.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
G5 Beam Line Vacuum System. G5 Beamline Vacuum System Design  Bakeable and Particulate free to Class 100 Clean Room quality Require Clean room QA and.
11/30/20151Robin Lafever The existing 300 K Flange This is certainly an older version but is useful to illustrate The proposed modifications.
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
Laser Heater Controls Overview 21 August 2008 Matt Boyes Laser Heater Controls Design Overview EPICS IOC Team Meeting Matt Boyes.
Transformer positions for BISMV and BSW M. Hourican 2 March 2015.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
1. Network technology 2 Network Card (UTP) 3 UTP cable Unshielded twisted pair (UTP) 4 Shielded twisted pair (STP)
Installation of the T600 at Fermilab CSN2, September 22,
Booster bpm’s Jim Crisp 3/29/06. Plate width and linearity with the response linearized along the axis 60 and 20 degree plates become nonlinear in the.
S V.MOUNICA 09551A0294.  To increase the distribution rate of present electric supply which is 70% to 100%.  Improving the supply to house holds without.
UITF Laser and Gun High Voltage John Hansknecht UITF Operational Review March 18, 2016.
Physical Transmission Media Chapter 8. Objectives In this chapter, you will learn to: Identify the characteristics of wireline transmission Describe the.
Installation of the T600 at Fermilab
H1 Squeezing Experiment: the path to an Advanced Squeezer
First clues on ET payload sensing and control
Update of MVD services and requests
ELENA installation and commissioning status
Plan for the installation of the TAMU screen
NP04 CPA/FC/HV Interfaces
S12700 CSS Card Clustering 1 Components and Tools 2 Installing Cards
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
Update on aLIGO Charging Issues
BIX In-Building Cross Connect system
UITF Operational Review
Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.
Table of Contents Name and picture of each appliance, material, and tool How to turn on the power How to install microphones Lobby Arrangement (during.
PBC Method Flat Mirror Gas Mixture Dielectric Mirror Pump Window PM
Wireless Home Networking Chapter 3 Outline
Welcome! January 30th, 2017 Tuesday
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Errecting TMS-580 Control room CT /-PT Platform.
500 nm WRITE VOLTAGE 0 V.
Cryomodule Assembly Plan
Reader Swap out Guide.
Safety, reliability and maintainability
Компания Reichle & De-Massari (R&M)
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
SNS PPU Cryomodule Instrumentation
Design of Steel Structures (2) Design of Steel Beams
The Basic Bulb Bulb uses electrical current to produce light.
Presentation transcript:

D7 or C1: -1: Tip-tilt B-OSEMs, D25 -2: VOPO suspension A-OSEMs, D25 -3: VOPO suspension A-OSEMs, D25 -4: Injection platform low voltage components, D25 -5 Injection platform high voltage components, D25 D4: All of these go to -1. We need to come up with a designation to indicate where they are installed on the cross. D4-2: SQZ 532nm optical fiber D4-3: SQZ 1064nm optical fiber

0) Beam diverter new location 1) Tip tilt: 1 x D-25 cable from top 2) VOPO suspension: 2 x D-25 cable from top 3) Items on suspended platform: 2 x D-25 cable from top 4) Optical fibers: 2 patchcords from D4

Optical Fiber end

L1, Carl: Will the fiber and the SEI cabling all make the turn and fit within the 5 way cross fitting? As cables bend to make a turn like that, you might end up with less room than you would think. I would at least test fit the feedthroughs with the cables to ensure they all can make the bend and fit properly. The only blank port is D7 on top, however, Scott informs me that ideally he would like to move the ion pump from D8 to that flange as in it's current location on D8 it rains detritus onto sensitive items on the HAM6 Table.  If he made this move would D8 work for you, or do you need D7?  The central top flange C1 currently has some vacuum gauges installed on them. D4 is looking like it would have the most room for you to work with, we need to be careful to try to not touch the blue cross beam with any cables. I see that D4-3 has only one DB25 cable on it.  If it were at all possible to connect this cable on a free connector on D1-3C2 or D2-3C2, you would have this flange all to yourselves. Scott: We are willing to move things around to accommodate the scope of work but the less we move the better. I would prefer to move the gauge pair instead of the ion pump just because it would be less invasive e.g. no crane hook would be needed through the top of the cleanroom. Keep in mind the current cleanroom over HAM6 at LLO does not have roof access from what I remember.  H1, Chandra: If you need a top port, we could combine the turbo pump with the gauge to free one up for the squeezer. We would need to purchase a custom spool Richard: We would have to come up with a new strain relief scheme for the D4 flange.  I would like to go on the floor and look at the orientation to the cross arm since we need to have some radius of bend on whatever we feed through.