Presentation is loading. Please wait.

Presentation is loading. Please wait.

Errecting TMS-580 Control room CT /-PT Platform.

Similar presentations


Presentation on theme: "Errecting TMS-580 Control room CT /-PT Platform."— Presentation transcript:

1 Errecting TMS-580 Control room CT /-PT Platform

2 Cabling diagram Current cable set Voltage cable

3 Connection between CT / PT platform
and control room Control Room CT / PT Platform

4 Installation of CT / PT Mounted CT and PT Mounting detaills...
channel for the cable to The control room

5 Cable channel from CT-PF platform to the control room
Below the CT/ PT platform Behind the wall .. to the control room

6 Further sample of installed systems

7 Further sample of installed systems

8 Further sample of installed systems


Download ppt "Errecting TMS-580 Control room CT /-PT Platform."

Similar presentations


Ads by Google