Download presentation
Presentation is loading. Please wait.
Published byDuygu Baybaşin Modified over 5 years ago
1
Errecting TMS-580 Control room CT /-PT Platform
2
Cabling diagram Current cable set Voltage cable
3
Connection between CT / PT platform
and control room Control Room CT / PT Platform
4
Installation of CT / PT Mounted CT and PT Mounting detaills...
channel for the cable to The control room
5
Cable channel from CT-PF platform to the control room
Below the CT/ PT platform Behind the wall .. to the control room
6
Further sample of installed systems
7
Further sample of installed systems
8
Further sample of installed systems
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.