Presentation is loading. Please wait.

Presentation is loading. Please wait.

PBC Method Flat Mirror Gas Mixture Dielectric Mirror Pump Window PM

Similar presentations


Presentation on theme: "PBC Method Flat Mirror Gas Mixture Dielectric Mirror Pump Window PM"— Presentation transcript:

1 PBC Method Flat Mirror Gas Mixture Dielectric Mirror Pump Window PM
HR Coated Fiber Tip SMF PBGF Light PM Vacuum Collimating Lens

2 PBC Method Curved Mirror
Dielectric Mirror Pump PM PBC HR Coated Fiber Tip SMF PBGF Light PM Vacuum

3 Chamber Assembly

4 Chamber Cross Section

5 Conflat flange for windows
O-ring groove to be machined on opposite of knife edge Quantity: 4 O-ring : ID = 0.737” Thickness = 0.103” ¼” Deep Tapped hole for screw 2.75” Conflat flange with 0.505” Bore hole (already purchased this way) Enlarge bore hole to diameter = 0.637” (radius = ”) Groove width = 0.103”x30% = ” Groove depth should be 70% of 0.103” = .0721” Bottom of groove should be smooth for “O” ring vacuum seal Radius = ” Holes are 120° apart Lesker flange part #s: 0.505” Bore - F0275X050N Blank – F0275X000N 0.637” OD = ID + 2x(thickness + 30%) = 0.737” + 2x(0.103”+.0309”) = ” 0.737” 1.0048” Will have 1” wedge window to install with teflon holder so that when chamber is brought to atmosphere, window doesn’t fall off (next page) 2.75” Tapped holes are on both sides offset by 60 degrees to not interfere with each other. SIDE:

6 Teflon window holder Quantity: 4 Raw teflon tube Top OD=1.55” Side
Should be large enough to fit 4-40 screw (#30 drill size = ” for free fit) Counter bore for screw head Raw teflon tube OD=1.55” ID=0.75” Top Side 0.6125” Holes are 120 deg apart Radius = ” 0.25” 1.05” 0.75” 1.05” Recess to “catch” window 0.05” bigger than window Depth of recess needs to be 0.050” 1.55”

7 Fiber holder Quantity: 4 Swagelok: SS-1-UT-A-4 (1/16” tubing hole)
Ultra-Torr Vac fitting “adapter” Quantity: 4 Collar to attach to vacuum chamber (threads welded to flange): A&N corporation S-50-KM (0.515” ID, 5/8” tube OD) 1/16 ” tube hole 3/16 ” 1/4 ” ½” OD tubing Overall length needs to be ~6”, so ½” OD tubing should probably be about 5” Mike wasn’t sure what this piece was, though it is important for the interior to be conical so that the fiber will be guided through.

8 Conflat flange for fiber holder
Quantity: 3 O-ring : ID = 0.737” Thickness = 0.103” 2.75” Conflat flange Bore hole to diameter = 0.620” (radius = 0.310”) Lesker flange part #s: 0.505” Bore – F0275X050N Blank – F0275X000N 0.620” 2.75” SIDE:

9 Chamber Layout C2H2 Buffer Gas

10 Chamber Layout (Cont.)

11 Modified Acetylene Delivery System

12 Shelves

13 Shelves (Cont.)


Download ppt "PBC Method Flat Mirror Gas Mixture Dielectric Mirror Pump Window PM"

Similar presentations


Ads by Google