Biol 351/52: -> Mehroke, Jarnail

Slides:



Advertisements
Similar presentations
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
Advertisements

Stroke Lab Hospital Floor Plan.
Safety Training Safety First. EXITS All exit doors shall be maintained in operable condition. Exit doors shall not be locked, chained, bolted, barred,
Chemistry safety Part 2.
UKSPA Conference 2008 Laboratories for the Future East Midland Conference Centre, University Park, Nottingham Incubator Buildings in Science Parks – special.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
Remove shelving Reorganize cabinets to make leg holes for 3 pairs of students per side Repair holes and paint counters and cabinets Remove shelving Reorganize.
4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie.
SETUP Chapter 6 Lead Abatement for Workers Course.
For Students in their Food Services, Health Center, Co-curricular & Study Spaces 11/9/12.
Magali Pauzié Magali Pauzié $1,000 $2,500 $5,000 $10,000 $25,000 $50,000 $75,000 $150,000 $1,000.
Here is an office or den.. You see a desk with computer on top and a big chair.
Furniture, Fixtures and Equipment Guidance Document CLC-9 April 2014 for State Operated Campuses 1.
Pulleys Assignment #35.
Accessibility.  A building code is a set of rules that specify the minimum acceptable level of safety for buildings. The main purpose of building codes.
Magali Pauzié Magali Pauzié
Chinese International School Laboratory Refurbishment A case Study of laboratory design.
Identifying Agriscience Lab Tools Agriscience Mr. Pullom.
Safety Awareness in Metro Science Labs. 1. Be familiar with the lab space Know where to find eyewashes safety shower spill kits first-aid kits fire blankets.
E122 E123 E124 E125 E126 E127 E128 E129 E130 E131 E135 E136 E137 E138 E136 Solar Support Centre Desks for 4 people + connection to Bruce’s Workbenches.
Physical Science1 Laboratory Procedures. 2Physical Science Fume Hood Located between lab and prep room Prevents harmful fumes from entering lab May be.
Remodeling my room From cluttered to clean. My main goals of remodeling my room were… 1.Having a color coordinated theme 2.Organizing all my cluttered.
Safety First !. Safety is everyone’s responsibility… Safety Contract: 1-8, 10, 12, 15-18, 20-23, 25, 27, 29, 35-37, 39, Consider yourself a first.
Before we learn how to extinguish fires, we first need to know a little about how they work. The fire triangle to the right shows the three things that.
 I can identify and correctly use common lab equipment used in the chemistry laboratory.
Moving Out of Mount Hall What you need to know. Move Out Schedule Currently: Media Services June 23: – Student Support Services (to Enarson) (Owens) –
3.0.0 – Service Area. Service Area:  Kitchens – (Types and Layouts) Kitchens – (Types and Layouts)  Bathrooms / Powder Rooms Bathrooms / Powder Rooms.
Work Station area A & B Reception & Waiting Executive Area A & B.
Objective 6.02 INTERPRET simple drawings. Architectural drawings Drawings that contain information about the size, shape, and location of all parts of.
Max And Hieu’s House Design. Entry Hallway= 12mx1.25mx2.5m extra 60cmcm in width on right while passing coat hangers and shoe racks on first right which.
Lab Equipment Biology Foothill Technology High School.
AgeIn Place By: Kristin and Mayte. Kitchen Ideas  The kitchen has always been a place for family and socializing.  Making changes in the kitchen can.
Lab Safety The Does and Don'ts.
Lab Safety Fundamentals Unit Day 1. Things to know in the lab: 1.Always wear your GOGGLES. 2.Always know the hazards of the chemicals you are working.
Space requirements And furniture.
APISD High School by Susan Coleman. Windows from outside One of my first thoughts was OMG there are 22 windows what am I going to do with them. I found.
Lab Safety. Evacuation From the main lab Exit the lab and go left. Go to the end of the hall and go through the room on the left. Go out the door and.
The Bell Camera1 Trainer Training The Bell Camera.
Kitchen ItemCostWhereStyle Sink Faucet$135 (paid)C-listBrushed stainless Sink ` Main Countertop Island Countertop Island Cabinet Cabinet hardware.
Computer Rooms 101 Geoffrey Day. Will the floor collapse? 42RU rack - 115kg 40 * 1Ru servers - HP DL360, 16.78kg each Shelves, cables etc 15KG per rack.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
Renovating Geoscience Labs for the Future “We want our students to learn skills they need in the workplace…not a museum.” Key Design Drivers Capacity—
Classroom Furniture & Fixtures Aire condicionado Air conditioner.
Put in energy star stuff. Objective 7.01: APPLY the elements of a functional kitchen.
Architectural Planning KITCHENS
Objective 7.06 INTERPRET simple drawings. Draw the symbols onto graph paper. Cut out each symbol and glue onto a notecard.
46 West Trace Creek The Woodlands, Texas. Front view of home.
New products and changes to products. ADA Instructor’s Desk  6’ Wide  34”H  Sloping front  Paddle handle on fixtures.
Lab design Assignment 3 Unit 2.
RENO IDEAS.
Biology Classroom Design By Cara Schildmeyer, Louis Hesse, Rachael Botsford, and Jacob Latorre Period 10.
Kitchens, Laundry Areas and Baths Chapter 22. Objectives 1. Explain basic principles for designing efficient kitchens, laundry areas and bathrooms. 2.
PIP: INTERIOR DESIGN Kelsey. Top View South/West Angled Overview.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
3’ door 32 ‘ 14 ‘ 18 ‘ Rear ramp door 8’4” 3’ x 16’ slide out 3’ x 10’ slide out 3 ‘ 8 ‘ 12 ‘ FRONT Top View Dimensions.
ROOMS AND FURNITURE “Home sweet home!”. This house has got the ground floor, the first floor and the attic. The ground floor is the floor of a building.
The proposed trailer will have the capability to be pulled by a GSA pick-up and LMTV. The new trailer will also be wired with the proper type of electrical.
Introducing the Dakota 28483D
SPRING CLEANING CHECKLIST FROM A PEST CONTROL EXPERT
Planning First on Paper – Grid and Templates
Sample Preparation Area
Sam Farmer, Matthew Martin, Austen Sekerak and TJ Huster
Laboratory facilities
Electrical Gas Plumbing Heating & Cooling
Preparation for Design Planning
Name That Symbol!.
Breakfast bar – curved base units
Space requirements And furniture.
SULF - user lab facilities - now and in operation Monika Hartl
Desk x9 Desk x2 Desk x1 Table x2 Book x7 Fridge x1 Shelf Buy! Chair
Presentation transcript:

Biol 351/52: -> Mehroke, Jarnail (jarnail.mehroke@botany.ubc.ca)

Room 3012 & 3012/A/B (not to scale) Add coat hooks along this wall Outside Corridor Fume hood Add White Board Add White Board Flow hood # 1 Light Rack Add Projector Screen RM# 3012 Add Bench cabinet To Place Hood on (50”X39”) Flow hood # 2 Glass cabinet Glass cabinet Glass cabinet Hydroponics RM# 3012A Weigh Balances & pH meter ELISA Reader GC Machines RM# 3012B #3 Put fridge here #1 Computer Computer Computer Computer Gas Cylinders

Rm. 3520 3 Growth Chamber # 123 Sorval centrifuge RC-2 Fridge D Sink Freezer # 4 3 Sorval centrifuge RC-2 Add High shelves Ice Machine Environmental Shaker New Brunswick Sci. Ice Machine Plumbing Add New 240V Plug

Add Workbench Cabinets & electrical outlets. Rm. 3511 Add Cork Board #4 Add eye wash and Shower #4 Put Fridge/freezer # Add White Board Add Workbench Cabinets & electrical outlets. and install wall shelves

Existing counter/fixed table Legend Rm. 3124(3012) Mount a screen that can be pulled over the wall near door. Install 3X3 white boards. Coat hooks and closet for students New desks and chairs Check and fix Air conditioner Install Glass ware cabinets. Qty;3 (3’X3’X1’) at end of main benches, as shown in the diagram. Rm. 3520 Add 240V plug Install High shelves Rm. 3511 install eye wash and shower Add Workbench Cabinets & electrical outlets. and install wall shelves Add White Board and cork boards (3’X3’ ) Prep room 3513 (Common) Do we also have 3517? Then move the transfer hood there. Otherwise it would have to go on the counter of 3513 instead of the lower shelves (and put lower shelves around it) We need a lab-rated dishwasher! The best place would be by the double sink by the fume hood. Does Jarnail have large equipment to move here? (He did not mention anything when we looked at the room together). NO. The distilled water apparatus is supposed to stay…. Otherwise we’ll need to take ours or otherwise have one installed. Existing counter/fixed table Sink Wall-mounted cabinet Door Electrical outlets Install this

Ref: Biol. 351 &352 Move to Rm. 3124 (3012, 3520.3511& 3513) All cupboards and shelves in Dr. Carl Douglas’s current lab will remain there, except the yellow tall cabinet in the centre of the lab. The water still might also be moved to their new lab. In addition to the list of improvements already submitted, the following improvements are also needed: Coat hooks and closet for students in RM# 3012(3124) & 3511, Place : close to front door wall. White boards and cork boards in RM# 3012(3124) & 3511 Qty: 2ea, Size: 3’X3’ Glassware storage cupboard in RM# 3012(3124) Qty:3, Size:3’X3’X1’, place: at end of 3 main benches (see diagram). Screen (1.8mX1.8m) + Projector in RM#3012(3124). Place: Close to front door. New Desks and chairs. Fresh coat of paint in RM # 3012(3124), 3520 And 3511 Check Air-conditioner function, Check for water leaks Remove old temporary panels from ceiling. New flooring in equipment RM# 3520