C HANTILLY N ATIONAL G OLF A ND C OUNTRY C LUB Annual Meeting February 19, 2009 G OLF A ND C OUNTRY C LUB C HANTILLY N ATIONAL Restoration and Renovation.

Slides:



Advertisements
Similar presentations
NOTICE SUBMISSIONS Requirements and Procedures 1.
Advertisements

MULTIPLE PROFESSIONAL REVIEWS DOCUMENT SOLUTIONS Architectural and engineering review identifies building code and accessibility repairs needed. ($750,000.
Why we need a new Building We are now a 1,000 member club. The current structure was designed to accommodate 200 (on its best day) The current.
June 8, 2011 Irvine Unified School District. What is a Modernization? Eligibility Permanent buildings - 25 years old Portable buildings - 20 years old.
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
We invite you to help us Build A Masjid as an Investment in your future Masjid Bilal has embarked upon a 5 year Masterplan to construct a state of the.
Education Campus What a Difference a Year Makes! Takoma.
Center Grove High School Addition & Remodeling Schematic Design Phase Faculty Presentation August 27, 2008.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
SCHEMATIC DESIGN PRESENTATION
Facilities Management and Design
WJJ Middle School Facility Study Tri Board Meeting February 5, 2015.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Padgett & Freeman Architects, PA Architecture Planning Interiors Haywood County North Carolina Adaptive Renovation Project for the Haywood County Department.
Church Renovation/ Expansion Proposals Willowdale.
Facilities Modernization Program Funded by Measure B Project Report April 16, 2012.
Geothermal Alliance of Illinois February 28-29, 2012 Dave Johnson, P.E. Illinois Department of Public Health.
1 Purpose  Summarize Monday’s workshop  Update on the Radio System – confirm staff’s recommendation  Jail Expansion – discussion/direction  Discussion.
Auxiliary Services CWU Board of Trustees February 4, 2010.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Cydney McGlothlin, Architect, University of Florida, Gainesville FL
BSBPMG522A : Undertake Project Work
What are the Main ARCHITECTURAL PLANS/ DOCUMENTS
Property Appraiser and Tax Collector Office Space Update July 8, 2014.
Facility Space Planning for Emergency Department Using Simulation Analysis SHS Conference February 2004 Lillian Miller.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Draft Rancho Colorados Swim & Tennis Club Master Plan Overview.
M AJOR T AYLOR Cycling Center AN URBAN COMMUNITY CYCLING FACILITY.
Building Work Committee Renovation & Expansion Project Presentation March 7, 2009 Mason School District.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Facilities Modernization Program Funded by Measure B Project Report March 19, 2012.
ESPLOST Savannah-Chatham County Public Schools January 10, 2007.
FAMILY LIFE CENTER Building Committee Update November 23, 2014.
E GNV Orange County Solid Waste Management Facility Southern Expansion Site Project.
Welcome to the Gentleman`s Golf Centre, My name is Ryan Lugg. I am the founder and company director of golf centre. I am here for any questions you may.
Missoula County Space Needs Plan Planning Logistics Phasing Plan Schematic Designs Questions.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Footscray Club Renovation Purpose of the Renovation 1.To improve the facilities for the existing members - Better facilities -Increased comfort -Meet existing.
O’Gorman High School O’Gorman Intermediate Catholic School Sacred Heart School St. Paul School 383 Birch Street North 101 Spruce Street North.
Padgett & Freeman Architects, PA Architecture Planning Interiors April 5th, 2010 Haywood County North Carolina “Through collaborative processes, to create.
A LEVEL STUDENTS 2015: WELL DONE YEAR 13! RESULTS AVAILABLE FROM THE DINING ROOM FROM 10.00A.M.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Understanding the FHA 203K STREAMLINE AfterBefore.
1 GCC Annual Meeting 2014 Call to Order Voting Presentation President’s Remarks Membership Report Financial Report Facilities Report Kitchen and Dining.
Library Renovation Projects Capital Improvement Plan 2009 – 2014.
Justice Planners and Designers 212 North 25 th Street, Milwaukee, Wisconsin / Door County Architectural and Engineering.
Alpine County Government Center Board of Supervisors Presentation June 26, 2013.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
206 THIRD STREET DR/TRP Appeal of. Planning Commission Hearing March 12, 2014, P/C approved a Design Review Permit: - Demolition of the existing.
The Golf Club Club Rules & Membership Details. Club Rules  Members may obtain starting times 14 days in advance  Guests may obtain starting times seven.
LIFE CYCLES OF AIKEN COUNTY PUBLIC SCHOOLS CONSTRUCTION PROJECT October 8, 2013.
July 11, 2017.
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Construction Documents
Interior Design Designing Functional Interiors & Floor Plans
ADDITION AND MODERNIZATION
Valley & Third Streets Redevelopment
Facilities Update November 17, 2017
Dunes Amenities Center
Building Project Informational Meeting
PROPOSED FACILITIES REFERENDUM
Our Vision Chickasaw Point - An inviting community on Lake Hartwell where residents work, play and enjoy life together ”A welcoming place to.
Assembly Hall Re-Construction Plan 8/11/18
Minuteman Vocational Technical Regional High School Progress
Phase II Committee Forrest Barber Johnny Davis Mike Hannon Brandon Harwood Kelly McKay Jim McCoy Becky Roberts.
EAST PENNSBORO AREA SCHOOL DISTRICT
Presentation transcript:

C HANTILLY N ATIONAL G OLF A ND C OUNTRY C LUB Annual Meeting February 19, 2009 G OLF A ND C OUNTRY C LUB C HANTILLY N ATIONAL Restoration and Renovation Plan

C HANTILLY N ATIONAL G OLF A ND C OUNTRY C LUB Annual Meeting February 19, 2009 The Team General Contractor – Vantage Construction Club Project Manager – Pete Wrenn Club Representatives – Paul Roberts, Mike Hudenburg and Tony Mobasser Architect – TBD – The M Group Structural Engineer – Jody Fox Interior Design – Karen Heye Project Legal Counsel – Mark Graham

C HANTILLY N ATIONAL G OLF A ND C OUNTRY C LUB Annual Meeting February 19, 2009 The Overall Plan Repair the roof to close in the building Pull a permit to commence restoration Develop Architectural plans for the renovations Design and obtain a permit for the deck Obtain County Approvals for Renovations Open the lower level in sections All the above items will happen concurrently

C HANTILLY N ATIONAL G OLF A ND C OUNTRY C LUB Annual Meeting February 19, Distinct Phases Phase 1 – Roof Repair Phase 2 – Restore the lower level and re-open for use. Phase 3 – Renovate the second floor

C HANTILLY N ATIONAL G OLF A ND C OUNTRY C LUB Annual Meeting February 19, 2009 Phase 1 Repair the roof -The Contract has been signed for this phase -Schedule – 3 to 5 weeks -Potential issues:- – Structural problems We do not believe this will be an issue – County Permitting We do not believe this will be an issue either

C HANTILLY N ATIONAL G OLF A ND C OUNTRY C LUB Annual Meeting February 19, 2009 Phase 2 Restore the lower level and open for use -The Contract will be signed for this phase next week -Schedule – 4 to 5 months, to run concurrently with phase 1. Projected completion July 1, Potential issues – County Permitting We have done due diligence on this and believe we should have no issues - Health Department We hope to close in the lower level and obtain health department approval to serve food while the restorations are being completed upstairs.

C HANTILLY N ATIONAL G OLF A ND C OUNTRY C LUB Annual Meeting February 19, 2009 Phase 3 Renovations -The following renovations will be completed depending on the budget 1)Build a new Bar above the current Grill Room. 2) Build a lounge in what is now the 19 th Hole 3) Construct a 900 sq. ft. deck above the rear patio 4) Construct 2 new bathrooms at the top of the main stairs. 5) Construct a private dining room in what is now the card room

C HANTILLY N ATIONAL G OLF A ND C OUNTRY C LUB Annual Meeting February 19, 2009 Phase 3 - continued 6) Construct a full size pass through from the Ballroom to the Grill Room to expand our wedding capacity 7) Build a vestibule at the entrance to the Grill Room 8) Expand the Kitchen beyond the existing bar in the grill room 9) Install an elevator to the second floor 10) Relocate the Board room to the storage area above the Pro Shop

C HANTILLY N ATIONAL G OLF A ND C OUNTRY C LUB Annual Meeting February 19, 2009 Phase 3 - continued 11) Renovate the Pro Shop 12) Construct an indoor driving range/training facility above the Pro Shop -The architectural plans for these renovations will begin immediately -Permits will be pulled upon completion of the architectural plans -Construction will commence upon issuance of permits

C HANTILLY N ATIONAL G OLF A ND C OUNTRY C LUB Annual Meeting February 19, 2009 Phase 3 - continued -Schedule – 6 to 7 Months Projected completion date September 1, Potential Issues -County Permitting -Code/ADA issues -Budget We will eliminate items if necessary to stay within budget