1 MODALITIES FOR HIV/AIDS PLANNING, IMPLEMENTATION AND MANAGEMENT IN LOCAL GOVERNMENTS Stephen K. Kiirya Makerere Institute of Social Research August 6,

Slides:



Advertisements
Similar presentations
Partnerships for Health Reform Public Sector Contracting of NGOs to Deliver HIV/AIDS Services: Case Studies from Brazil and Guatemala XIII International.
Advertisements

Consultation Process Towards the Post-2015 Framework on Disaster Risk Reduction Youcef Ait Chellouche UNISDR AFRICA.
1 John Rwangombwa Permanent Secretary and Secretary to Treasury Ministry of Finance and Economic Planning Republic of Rwanda 1 Challenges and opportunities.
Mutual accountability and aid transparency Mutual accountability and aid transparency Republic of Moldova 1IATI meeting, OECD Conference center.
Mutual Accountability and Aid Transparency - Rwanda – IATI Partner Country Meeting, 4th July 2011 Paris, France Ronald NKUSI Director, External Finance.
KENYA HEALTH SECTOR PARTNERSHIP Third IHP+ Country Health Sector Teams Meeting Brussels, December 2010.
1 Agenda item 4: Work modalities of the revised ISDR system to support the implementation of Hyogo Framework- Elements to be reviewed in groups- & prepare.
Ministry of Labor and Social Policy SOCIAL POLICY COUNCILS Dragica Vlaović-VasiljevićSophia, 2-6th July 2007 Dragica Vlaović-VasiljevićSophia, 2-6th July.
Child Friendly Local Governance
ClimDev-Africa Program & African Climate Policy Center (ACPC)
Guidance Note on Joint Programming
PRESENTATION AT THE WORKSHOP ON LDC PRIORITY NEEDS FOR TECHNICAL AND FINANCIAL COOPERATION 29 OCTOBER 2009 GENEVA Sari Laaksonen Coordinator, Integrated.
Establishing a National Working Group on Trade Facilitation Challenges and Lessons Learned Presented by Elizabeth Tamale Ministry of Tourism, Trade and.
ActionDescription 1Decisions about planning and managing the coast are governed by general legal instruments. 2Sectoral stakeholders meet on an ad hoc.
Planning and use of funding instruments
The Implementation Structure DG AGRI, October 2005
Joint presentation by respective units in DGs AGRI, EMPL and REGIO IPA Components III, IV and V: Conditions for successful preparation and absorption of.
Harmonized support to scaling up the national AIDS response Ini Huijts 7 th June 2006 ODI meeting, London.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
The Danish Civil Society Strategy – reflecting past experience while embracing new approaches? 16 June 2009 Lars Udsholt.
INTERNATIONAL CONFERENCE ON GENDER EQUITY IN SPORTS FOR SOCIAL CHANGE
Challenging the Budget Creating Incentives for Results Rwandas Experience Elias Baingana - Budget Director.
Towards a model M&E system for AIDS programs Kampala April
Overview of the Global Fund: Guiding Principles Grant Cycle / Processes & Role of Public Private Partnerships Johannesburg, South Africa Tatjana Peterson,
High level expert meeting to develop the Near East Regional Action Plan to Implement the Global Strategy to improve Agricultural and Rural Statistics.
The Republic of Uganda WAKISO DISTRICT COUNCIL. ALGAF IV. SESSION III: TAKING THE LEAD IN COORDINATION AND ACTION : STRATEGY AND PARTNERSHIPS. IMPLEMENTATION.
Commonwealth Local Government Forum Freeport, Bahamas, May 13, 2009 Tim Kehoe Local Government and Aid Effectiveness.
Comprehensive M&E Systems
Local Government Development Program and Poverty Reduction in Uganda: Lessons from Aid Policies Shuaib Lwasa Department of Geography Makerere University.
Planning, Monitoring & Evaluation Of One Program Cyra Syed M&E Coordination Officer Resident Coordinator’s Office.
Common recommendations and next steps for improving local delivery of climate finance Bangkok, October 31, 2012.
HIV/AIDS COORDINATION AND FAITH BASED ORGANISATIONS: EXPERIENCES FROM UGANDA JOHN RWOMUSHANA, MD, MSc Director, Research and Policy Development UGANDA.
THE DECENTRALIZED RESPONSE TO HIV/AIDS IN UGANDA : Progress, challenges and lessons learned Patrick. K. Mutabwire Ag. Director Local Government Administration/
Development and Implementation of a National Multisectoral Output Monitoring System (SHAPMoS) for HIV Responses in Swaziland:  Challenges and lessons learned.
Identify the institutions which have a stake in the
The Global Fund- structure, function and evolution February 18, 2008.
Update on Progresses, Challenges 2014 and Plans 2015 of CCC CCC Annual General Meeting 2014 CKCC, 12 March 2015 By: Ms. Estelle Roesch, Treasurer of CCC.
Ryve Prekorogja 13 June VET Vocational Education and Training.
Toolkit for Mainstreaming HIV and AIDS in the Education Sector Guidelines for Development Cooperation Agencies.
1 JUSTICE LAW AND ORDER SECTOR SWAP DEVELOPMENT & IMPLEMENTATION PROCESS.
“Public-Private Health Forum guiding the way forward for partnerships to improve health in Tanzania” Dr. Adeline Kimambo Co-Chair PPHF Executive Board.
February 21, JAS Consultation between the Government of Tanzania and Development Partners February 21, 2006 Courtyard Hotel, Dar es Salaam.
Towards Universal Access Scaling up HIV Prevention, Treatment, Care and Support: The Role of the United Nations.
Africa Health Workforce Platform & Observatory Presentation to the 1st conference of the Asia-Pacific Action Alliance on HRH (AAAH): October 2006.
The Global Fund and Southern Africa A review of the structures and grants in southern Africa.
Health structures in the EAC and how the link with the African Union Commission DR. Michael J. Katende Principal HIV and AIDS Officer East African Community.
THE REPUBLIC OF UGANDA National AIDS Conference Presentation during the 4 th Uganda AIDS partnership Forum, Munyonyo, 31 st January 2006 By James Kaboggoza-Ssembatya,
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
Eurostat/UNSD Conference on International Outreach and Coordination in National Accounts for Sustainable Development and Growth 6-8 May, Luxembourg These.
WHO EURO In Country Coordination and Strengthening National Interagency Coordinating Committees.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Vito Cistulli - FAO -1 Damascus, 2 July 2008 FAO Assistance to Member Countries and the Changing Aid Environment.
INTERACTIVE TRAINING ON IDP FOR COUNCILLORS ________________________
Observatories for the Health Workforce in Africa VIII REGIONAL MEETING OF THE OBSERVATORIES OF HUMAN RESOURCES FOR HEALTH IN THE AMERICAS LIMA, PERU
Dr. Sarah Byakika Ministry of Health, Uganda 5 th IHP+ Country Teams Meeting 2 – 5 th December 2014.
Towards a Sector Wide Approach (SWAp) for water sector in Lesotho Prepared by T.W. Sepamo Principal Engineer Water and Sanitation. Prepared for EUWI –
New approach in EU Accession Negotiations: Rule of Law Brussels, May 2013 Sandra Pernar Government of the Republic of Croatia Office for Cooperation.
FORMULATING EXTENSION POLICY, KENYA’S EXPERIENCE BY MARY KAMAU DIRECTOR, EXTENSION & TRAINING MINISTRY OF AGRICULTURE KENYA DURING THE EXTENSION WORKSHOP,
High Level Joint Committee (HLJC) Bodies of the HLJC Main tasks and working procedures Andreas Holtkotte, Focal Area Coordinator Environment and Energy,
African Centre for Statistics United Nations Economic Commission for Africa Session 2 How to meeting countries needs: What has been done and way forward.
MOH 2 February Identify needs Prioritize needs Finalize list of endorsed needs Submit needs to MOPAD Consult with donor Negotiation (intra- and.
Agency Performance: A New Agenda
IHP+ First Steering Committee Meeting 15 January 2014
Country Coordinating Mechanism- Nepal
National Mechanisms for Reporting and Follow-up
FBO Workshop - May 13-15, 2003, Addis Ababa
PRESENTATION BY NCOP ON STRUCTURE, ROLES AND RESPONSIBILITIES OF NCOP, DISTRICT AND SUB COUNTY COUNCILS FOR OLDER PERSONS COUNCILS.
Principles of Financial Management and Disbursement
11 July 2019 APP Presentation to the Joint Standing Committee on Financial Management of Parliament June 2019.
Multisectoral Response
Presentation transcript:

1 MODALITIES FOR HIV/AIDS PLANNING, IMPLEMENTATION AND MANAGEMENT IN LOCAL GOVERNMENTS Stephen K. Kiirya Makerere Institute of Social Research August 6, 2007 Arua

2 1. BACKGROUND No structured response to HIV/AIDS before AIDS Control Program (ACP) established in MoH to spearhead HIV/AIDS actions in public sector CSO/FBO initiated organized action in community , HIV/AIDS mainly coordinated & managed by ACP through Task Forces linked to a few Sectors 1988, realized that epidemic is multi-faceted & initiated discussion on a multi-sector strategy 1992, adopted policy on multi-sector Approach to the Control of AIDS (MACA) and created UAC implementation of multi-sectoral national response with many players at national, district & lower levels

3 UAC CCM WB MAP Bilaterals INGOs and Foundations National Level Action District and Local Level Action National Budgets Academic Partnerships UN Private Sector National AIDS Control Programmes CSO Partnerships Parliament Numerous challenges to institutional and coordination arrangements

4 2. MANAGEMENT ARRANGEMENT Created formal arrangements, structures and functions to ensure that all stakeholders and aspects of the HIV/AIDS response work together in an organized and efficient way to achieve the national objectives Political & technical coordination structures are responsible –Political: Parliamentarian HIV/AIDS Standing Committee, DATF, SATF, parish/village councils –Technical: UAC/SCEs, SAC, DAC and SAC UAC coordinates all HIV/AIDS activities at all levels. SACs coordinate HIV/AIDS activities in line ministries. DAC and SAC coordinate AIDS activities at district and lower levels with support from national structures

5 AIDS PARTNERSHIP FORUM (All Partners meet Annually:review progress, set priorities) 2.1 National Mechanism UGANDA AIDS COMMISSION & SECRETARIAT THE HIV/AIDS PARTNERSHIP COMMITTEE (4 Permanent Representatives and Representatives from all Self-Coordinating Entities (SCEs) Govt Ministries UN & Bilaterals National NGOs INGOs Private Sector FBOs PHA Networks LG Response Research Academia Science YouthMedia Post 2000 Three Ones Principle = One National HIV/AIDS Framework, Coordinating Body and M& E Framework Parliament

National-Level Roles Develop national programs, policies, guidelines and materials for facilitating HIV/AIDS planning, implementation and management of interventions Mainstream AIDS in planning/budget frameworks Advocate and lobby resources and other inputs Building capacity of implementers by training, etc Quality assurance by periodic supervision, M&E National surveys, assessments, etc

7 District AIDS Taskforce Chair: District Chairperson Secretary: CAO; Members: max 23; DEC, RDC, speaker, reps of CSO & PHA; Meet: Twice annually District AIDS Committee Chair: CAO; Secretary: Focal Point Officer; Members: max 23; heads of directorates, reps of CSO & PHA; Meet: At least ounce a Quarter SC AIDS Taskforce Chair: Sub-county chairperson Secretary: Sub-county chief; Members: max 15; SC executive, speaker, reps of CSOs & PHA ; Meets: Twice annually Subcounty SC AIDS Committee Chair: Sub-county chief; Members: max 15; heads of sub-county directorates, reps of CSOs & PHA; Meets: At least twice annually Parish AIDS Taskforce Combines Political and Administrative Arms; Chair: Parish chairperson; Members: max 15; Parish executive, representatives of PDC, CSOs and PHA. Meets: Twice annually 2.2 Local Govt Mechanisms Village AIDS Taskforce Combines Political and Administrative Arm; Chair: Village chairperson; Members: max 15; Village executive, representatives of VDC, CSOs and PHA; Meets: At least twice annually District Parish Village

Local Govt Level Roles Develop, implement and manage local HIV/AIDS strategic and annual plans, bylaws and tools Integrate AIDS activities in local development plans, initiatives and budget frameworks Mobilise communities & resources for AIDS responses Build capacity of implementers by training, etc Implement and assure quality of activities through periodic supervision/monitoring Local situation/response analysis, surveys,etc

9 3. PLANNING MODALITIES 3.1 Definition Is a process that involves assessing problems/needs and identifying feasible actions and resources for resolving them in the short and long-run Long-run: Strategic plan (more than 3 years Short-run: Work-plan (quarterly, biannual, annual

10 What should be What it is Participatory from below upward Partial participation, process often starts & ends at district level staff & politicians Partial participation, process often starts & ends at district level staff & politicians Inclusion of community groups & need (go beyond LC structure) Limited participation & integration of community needs in development plan processes Decentralized management structures (DAC, CPC DAC & DDHS-led, central-led for some CSO Multi-sectoral approach Evidence-based multi-sectoral strategic plans Multi & single-sector (health) method Parallel planning/budgeting (driven by respective AIDS funding mechanisms) Mainstream AIDS in plans and budgets for organizations Mainstream AIDS in plans and budgets for organizations Limited HIV/AIDS activities/budgets in department plans Sector HIV/AIDS provisions in the District Development Plan Sector HIV/AIDS provisions in the District Development Plan HIV/AIDS activities seen in health section of district development plan HIV/AIDS activities seen in health section of district development plan 3.2Planning Principles

11 What should be What it is DAC coordinates planning, budgeting, appraisal, implementation, M&E of the district multisector HIV/AIDS plan Non-participation of some CSOs in joint planning Non-participation of some CSOs in joint planning Similar lower structures not working Stakeholders often come with preconceived activities Process not replicated & linked to lower structures and leaders Process not replicated & linked to lower structures and leaders Deepen practice to SACs, etc. Start in groups/not only leaders Synthesize issues in sub- county and parish plan Synthesize issues in sub- county and parish plan Assign general needs to LG structures and special needs to interest groups Assign general needs to LG structures and special needs to interest groups Hold conference of all key LG stakeholders to plan collectively Select small team of DAC and stakeholders to synchronize activities, cost and draft plan in line with national strategic plan DAC reviews completed plan and submit it to DC for Approval DAC reviews completed plan and submit it to DC for Approval 3.3 Planning Process

12 4. RESOURCE MOBILISATION AND MANAGEMENT Funds mobilised locally from communities and LGs, or externally from government, donors and civil society Multiple funding arrangements: -On-budget funding (local revenue/conditional grant) -Separate bank account for channelling project fund -Direct funding to implementers 4.1 On budget Implementers request and funds are drawn from the respective budget line Accounting done in line with public procedures

Off-Budget CAO & CFO responsible for all financial management DFP & Sub-Accountant facilitate periodic financial operations and report preparations Implementers maintain project specific account DAC prepare/submit quarterly activity schedule (extract from approved annual work plan/budget) Funds are disbursed to LG project account with payment details (activities, amount and implementers) or directly to implementer with copies to LG Cheques written in the names of listed implementers. Next release made after accounting 75% of advance and reflecting it in the monthly accountability returns. Suspend payment if implementer fails to account well.

Direct CBO Funding After approval of CBO proposals, CAO/DFP or the equivalent in LLG prepare/submit to financier a request with approved community plan and budget Request shows communities whose proposals are approved, location & amounts (local and requested) Guide approved communities to open bank account Pay directly to respective CBO accounts by qheque. Train management committees in implementation, fiduciary management and reporting.

15 What should be What it is Respective LG-based departments, NGOs, FBOs and CBOs implement activities stipulated in the plan. Some implementer (CSO, FBO) deliberately avoid LG priorities & implement own activities Substantial external funds disbursed outside or without copy to LG mechanisms Substantial external funds disbursed outside or without copy to LG mechanisms Limited transparency and accountability of activities and budget size to LGs, communities Limited transparency and accountability of activities and budget size to LGs, communities Articulate all implementation procedures in LG plan Emphasize procedures to all financiers or implementers at negotiation, implementation and follow-up Emphasize procedures to all financiers or implementers at negotiation, implementation and follow-up Implementers develop workplan based on approved strategic plan Workplan should go through all set approval process of LG, ministry, CSO or FBO Disburse funds to implementers through or with information to LG authority Account to or give reports to LG authority CAO/DAC for verification/audit, etc 5. IMPLEMENTATION

Community Implementation Based on community action plan and budget. Community is informed about exact disbursement Community meets and prepares a simple activity timetable, and request based on funds disbursed. Community submits request and timetable to LG authority, and cheque is paid and deposited After cheque has matured, persons assigned activity request funds and implements. Implementation & accountability reports are prepared and submitted to treasurer who compiles reports. All reports, accountabilities and requests are endorsed by CPC and forwarded to LG.

17 Monitoring (check progress: Evaluation(assess outcome: Implementation of activities How they are being done, If beneficiaries are reached Identify obstacles+solutions Extent objectives are achieved Effects of activities on beneficiary well-being Weekly, monthly, quarterly,. Mid, end, after(post-audit) Checklist Evaluation/survey tool Internal: DAC, SAC, ATFs, EWs, PDC, VC, CPC, etc External: Independent Why? Improve performance Why? See change caused 6. MONITORING & EVALUATION 6.1 Definition

LG Modalities Set measurable indicators linked to LG situation and specific NSF objectives Set/use standard monitoring tool (linked to key AIDS indicators in LG & National M&E modules) Periodic monitoring of implementers by HIV/AIDS committees, EWs, political and community leaders Respective agencies must monitor/report on activities Establish Management Information System (MIS) Periodic analysis of existing data on HIV/AIDS Periodic reporting on key AIDS indicators in the LG & national M&E module Determine activity impact through periodic Local Quality Assurance and Supervision (LQAS) surveys in district

19 7. CONCLUSION LG HIV/AIDS planning, implementation and management modalities have been disseminated widely but are not functioning in all LG Joint planning is limited to districts which receive external support, and this process often starts and ends with department staff & politicians Participation & integration of community needs in development plan processes is still limited Implementation is still disjointed and weakened by incongruent procedures set by various AIDS funding mechanisms The deliberate bypassing of LG systems by several existing funding mechanisms & implementers has undermined the functioning of the set HIV/AIDS coordination and management arrangements

20 8. RECOMMENDATIONS Deepen joint planning practices into LLG structures (SACs, etc) and ensure that it starts in the community groups Synthesize community issues and integrate them in parish/sub-county plans while assigning general needs to LG structure and the special needs to respective interest groups Include budget provision for HIV/AIDS in all LG sectors (not only health) Articulate all planning, funding, implementation and management procedures in LG HIV/AIDS plan Repeatedly emphasize procedures to all financiers and implementers during negotiation, implementation and follow-up Replicate the partnership arrangements in all LGs

21 THANK YOU