Standards Break Out Session

Slides:



Advertisements
Similar presentations
ISO Process Summary for SEDRIS Dick Puk ISO/IEC SC24 SEDRIS Editor WG8 Meeting, October 1, 1999 ISO/IEC JTC1/SC24/WG8 N4.
Advertisements

Provenance and Context Content Standard (Emerging) – Status of Activities H. K. Ramapriyan Science Systems and Applications, Inc. & ESDIS Project, Code.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
Meeting No.LocationDateHostGeneral Topics to be Addressed 1Houston02/05/98CamcoOrganize ISO Gas-Lift Committee 2Houston05/04/98CamcoDraft Outline for ISO.
Doc.: IEEE /0333r1 Submission May 2014 TGaj Editor Report Jiamin Chen, HuaweiSlide 1 Date: Author:
802.16m Closing Report July 16, 2009 San Francisco, CA Session # IEEE m-09/0035r1.
In-session workshop on safety standards Vienna, 19 July 2016 Page 1 /13.
Changes and Challenges of 52.2 and ISO Update
ISA-SP99: Security for Industrial Automation and Control Systems
Task Group API 19SS Sand Screens
The ISO Comments Template & the ISO eBalloting Portal
TG 1 March Session Closing Report
ISO TC 108 SC3 Liaison to CCAUV
API 17X Subsea Boosting January 13, 2015
WG Technical Editor’s Report
Status Report November 2007
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: Sydney e/ Liaison Report.
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
ISO Gas-Lift Work Task Session Fall 2003 Gas-Lift Workshop
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
API Gas-Lift Task Group Session Fall 2003 Gas-Lift Workshop
API RP 17A - Discussion Points
doc.: IEEE <doc#>
802.11F Meeting Report March 2001 Month 1998 doc.: IEEE /xxx
ISO Task Group Update Wayne Mabry.
Submission Title: [WG-TG3 Opening Report May03]
Status Update on API 16Q / 16R / 16F
ISO TC64/SC4/WG2 June 2010 status
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
TC Process Specification Flow
IEEE C /36 Project IEEE Working Group on Mobile Broadband Wireless Access Title Proposed Work Plan.
Specification on float equipment
ISO TC64/SC4/WG2 May 2011 status
ISO TC67/SC4 Annual Meeting
TGi Final Report for the November 2003 Session
API SC 10, Work Group 3 Update:
API 17H TASK GROUP January 15, 2013.
Task Group G Report March 10, 2003
Presented to the CEOS WGISS October 22, 2018
Executive Committee Meeting
ISO TC67/SC4 Annual Meeting
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
WS-RX TC Process for Specification Development
WS-RX TC Process for Specification Development
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
Motion – P Rev/D2 to Sponsor Ballot
Standard Setting Process – Information Flow
Standard Setting Process – Information Flow
802.16m Opening (Final) Report
ISO TC67/SC4 Annual Meeting
Specification on float equipment
IPP Training, IICA & IPPC/FAO, Trinidad & Tobago
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
Gas Lift Workshop – 2003 ISO Update
TGaj Editor Report for CC22
Submission Title: [WG-TG3 Opening Report Nov02]
Hyatt Regency Union Station
Introduction to CBS-16
Motion – P Rev/D2 to Sponsor Ballot
IPP Training, EPPO & IPPC/FAO, York, U.K.
DRAFT ISO 10015:20XX Revision Overview Quality management - Guidelines for competence management and people development ISO/TC176 TG 01.
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
TG 1 November Session Opening Report
IPP Training, IAPSC & IPPC/FAO/FAORAF
TGg Report to the IEEE Working Group
doc.: IEEE <doc#>
API 17H TASK GROUP June 26, 2013.
Presented to the CEOS WGISS October 10, 2019
Presentation transcript:

Standards Break Out Session

2 wjm

Issues discussed No new standards required RP’s – domain of API or ISO Document generation process WD -CD –DIS – FDIS - 3 wjm

Status of ISO 17078.2 17078.2 (flow control devices) Released to CD (Committee draft) Incorporate editorial changes from work group 4. Projected completion March 2004 Review by work group 4 Incorporate wg4 comments 4 wjm

Status of ISO 17078.2 (continued) 17078.2 (flow control devices) Release to DIS (draft international standard) Send out for comments Review and incorporate comments Released to FDIS (Final draft international standard) Send out for up or down vote by member nations. If approved, standard available in 2 to 2-1/2 years. 5 wjm

Status of ISO 17078.3 and 17078.4 17078.3 (down hole equipment) Working document (WD) Work just beginning (est completion – 2-1/2 to 3 years) 17078.4 (reconditioning and other topics) Work just beginning (est completion – 3 to 3-1/2 years) 6 wjm