Presentation is loading. Please wait.

Presentation is loading. Please wait.

Hyatt Regency Union Station

Similar presentations


Presentation on theme: "Hyatt Regency Union Station"— Presentation transcript:

1 Hyatt Regency Union Station
November 2001 doc.: IEEE /468r0 March 2002 802.15 17th Session of meetings of the IEEE Working Group for Wireless Personal Area Networks March 11-15, 2002 Hyatt Regency Union Station St. Louis, MO Robert F. Heile Robert F. Heile

2 802.15 Functional Organization Chart
March 2002 Functional Organization Chart Robert F. Heile

3 Archive, Mailing List, URLs
March 2002 Archive, Mailing List, URLs Web Page: General Mailing List: Voter/Nearly List: TG1 list: TG2 list: TG3 list: TG4 list: SG3a list: Lists restricted to those on the list to reduce SPAM. To send to the list you must use the exact address on the list as the ‘from’ address. Alias addresses such as ieee.org will not work. To add your name to IEEE mailing list please send an to Robert F. Heile

4 Objectives of the St. Louis Meeting March 11-15, 2002
November 2001 doc.: IEEE /468r0 March 2002 Objectives of the St. Louis Meeting March 11-15, 2002 TASK GROUP 1- Bluetooth MEETING OBJECTIVES 1. Socialize any remaining issues prior to REVCOM TASK GROUP 2 -Coexistence MEETING OBJECTIVES 1. REVIEW AND VOTE ON DRAFT CHANGE REQUESTS 2. FINALIZE DRAFT FOR LETTER BALLOT 3. VOTE TO SEND DRAFT TO WORKING GROUP FOR LETTER BALLOT 4. PAR TITLE CHANGE TO BE VOTED ON BY EXCOM Robert F. Heile Robert F. Heile

5 Objectives of the St. Louis Meeting March 11-15, 2002
TASK GROUP 3-High Rate MEETING OBJECTIVES 1. CONFERENCE CALL STATUS, INCLUDING APPROVAL OF ANY AD HOC BUSINESS 2. LETTER BALLOT COMMENT RESOLUTION 3. MANDATORY SECURITY SUITE SELECTION 4. UPDATE DRAFT AS REQUIRED 5. RE-CIRBULATE LETTER BALLOT 6. EXCOM SPONSOR BALLOT PREP (LETTER BALLOT) Robert F. Heile

6 Objectives of the St. Louis Meeting March 11-15, 2002
TASK GROUP 4-Low Rate MEETING OBJECTIVES: 1. CONFERENCE CALL STATUS, INCLUDING APPROVAL OF ANY AD HOC BUSINESS 2. COMMENT RESOLUTION ON LETTER BALLOT 3. SECURE WORKING GROUP APPROVAL TO MOVE TO RECIRCULATION 4. INITIATE SPONSOR BALLOT POOL UPDATE 5. OBJECTIVES FOR MAY MEETING Robert F. Heile

7 Objectives of the St. Louis Meeting March 11-15, 2002
STUDY GROUP 3a-15.3 alt PHY, MEETING OBJECTIVES 1. HEAR APPLICATION PRESENTATIONS (Ref: 02023r2P CFA) 2. GENERATE A PRESENTATION SUMMARY (Ref: 02XXXr0P802.15) 3. WORK ON PAR & 5C (Ref: 02XXXr0P802.15) 4. START WORK ON REQUIREMENTS DOCUMENT (Ref: 02XXXr0P802.15) 5. START WORK ON SELECTION CRITERIA Robert F. Heile

8 Objectives of the St. Louis Meeting March 11-15, 2002
PC/802.11PC OBJECTIVES FOR THIS MEETING: 1. SELECT NEW CHAIRS FROM 2. Update Conference Calendar 3. ESTABLISH ONGOING AGENDA 4. Continue to Work on Joint / Publicity Activities Robert F. Heile

9 St. Louis Meeting Graphic
March 2002 St. Louis Meeting Graphic Robert F. Heile


Download ppt "Hyatt Regency Union Station"

Similar presentations


Ads by Google