OT Survey & Adjustment Outline: Survey technique at present

Slides:



Advertisements
Similar presentations
Richard Soluk – University of Alberta. The LHCb VELO Region R. Soluk --- University of Alberta --- MoEDAL Collaboration Meeting --- CERN June
Advertisements

1 Part II Proposition of locations of cable trays.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
1 Installation of Delphi Frame  ITS Installation.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
General idea of a couple of check rod system and adjustments
Cable and Service Installation David Warner Colorado State University May 11, 2009.
1 Detector position August 2005, supplement May’06 sub- detectormean Zdelta ZZ_startZ_end TT First pillar =1 st shelf at sides
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
Robot Design Chassis. Component List Robot Assemblage/Ensamble Layers/Chassis –Top and Bottom Layers Dribbler Mount/Soporte Kicker Mount/Soporte Wheel/Rueda.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
Inventory of radioactive sources present in the cavern at pit 8 Gloria Corti Experimental Area Meeting 05 August 2008.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Shreveport Assembly 14 MAY, 2008.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
1 The Discussions of the Installation Procedures of Scibar Fiber, PMT, CLR(Gain Monitor), Lower Service Floor & Others Edward Chi June 02, 2006 Fermilab/PPD/MD.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
DCal-ALICE integration and installation plan and status A. Tauro.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Kitakami Side AHCAL Assembly or anywhere in any detector.
GSI, for the CBM Collaboration
Progress with System Integration of the CBM Silicon Tracking Detector
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
CLAS12 Forward Tracking: Status and Challenges
Technical Design for the Mu3e Detector
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
The LHCb Installation Story
KEK news ( ) S.Tanaka.
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
Enrique Calvo Alamillo DAEGU
VELO-installation meeting CERN, January 17, 2006
- CT INSTALLATION PROCEDURE OVERVIEW -
Present status of the flux return yoke design
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Introduction Status before the 2009 run Results from the 2009 run
CMS Area Working Group Meeting
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
LumiCal mechanical design, integration with LDC and laser alignment
IHEP group Shashlyk activity towards TDR
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
First of all we will remind some numbers:
LHCb & EYETS
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
New Design for Beam Test Structure
Integration and IR Hall
LST Module Installation
Question & Suggestions March 17th
Station and Module Support Frames
Micromegas for CLAS12 – Preliminary work on integration
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF
OT Survey & Adjustment Outline: Survey technique
Outer Tracker Nominal Position
Polarized 3He target installation
Presentation transcript:

OT Survey & Adjustment 06-03-2007 Outline: Survey technique at present what has been done and what there is to do issues to complete OT alignment before pilot run possible optimizations long-term maintainance

Open Position Modules Bridge C-frame OT Cryo-Platform Table & Cable Trays December 9, 2018 Antonio Pellegrino

C Frames Distribution of cooling and gas Front-End Electronics Boxes Detector Modules Distribution of LV,HV, ECS/TFC, etc. December 9, 2018 Antonio Pellegrino

C-Frame Survey 1 2 3 4 5 6 7 8 9 Survey Points: 2(X/U) x 2(T/B) x 9 Per point: two targets for position & distance ~1 day per C-frame December 9, 2018 Antonio Pellegrino

Wheeled Support, Alignment, and Stop-and-Lock Blocks C-Frame Adjustment Long Beams (IPE 300) Transversal Beams C-Frame Rails Wheeled Support, Alignment, and Stop-and-Lock Blocks December 9, 2018 Antonio Pellegrino

Survey Work All data available at: Surveyed completely 4 out of 6 C-Frames (C Side) Work took usually 2-3 days of work 1st survey (1 day) Adjustment (~0.5 day) 2nd survey (1 day) Work needed OT closed (hindered by beam-pipe ) survey people inside the magnet (no longer possible? ) scaffold inside the detector to (major shit! ) insert targets at the top adjust the C Frame through alignment mechanism All data available at: http://www.nikhef.nl/pub/experiments/bfys/lhcb/outerTracker/Installation/Survey/Overview.html December 9, 2018 Antonio Pellegrino

Achieved so far T2-Q02-XU X layer top and bottom no survey of U layer T2-Q02-VX V layer top and bottom X layer bottom only T1-Q02-XU 1 corner X layer bottom 2 points U layer top and bottom T1-Q02-VX (1st survey, adjustment, then 2nd survey) V layer only bottom T3-Q02-XU & T3-Q02-VX only corners for RASNIK installation {T1,T2,T3}-Q13-{XU,VX} no survey yet December 9, 2018 Antonio Pellegrino

Problems to be solved Completion of OT alignment before pilot run: Close OT or at least come into the region of the alignment blocks access magnet area for survey access top dowel pins for survey target installation access alignment mechanism to adjust C-Frame position “Maintain” the OT alignment (long-term): access magnet area for survey access top dowel pins for survey target installation create possibility of survey from the A side A side : survey point outside the detector C side: survey point between A and C halves December 9, 2018 Antonio Pellegrino

Optimize the survey targets Currently used: gives good resolution in position and distance only one available (plus few spares) needs two accesses per dowel pin (distance and position) does not fit between two C-Frames Alternative 1: gives acceptable resolution in position and distance can make 2 x 9 needs one access per dowel pin does not fit between two C-Frames Alternative 2: gives good resolution in position and distance can make many (432??) needs no access fits between two C-Frames needs two survey stations in the magnet (triangulation) December 9, 2018 Antonio Pellegrino

Reduce the number of survey points Completion of OT alignment before pilot run: must have all points (2 x 2 x 9 per C-Frame) after adjustment can measure less points (1 x 2 x 5 per C-Frame) “Maintain” the OT alignment (long-term): can use a reduced set of points (1 x 2 x 5 per C-Frame) December 9, 2018 Antonio Pellegrino

“Side Survey” Target Alternative 3 (side view): gives good resolution in distance and acceptable in position can make 18 needs one access per dowel pin does not fit between two C-Frames needs survey platforms to be made create possibility of survey from the A side A side : survey point outside the detector C side: survey point between A and C halves December 9, 2018 Antonio Pellegrino