Montgomery County Fire Rescue Medical Ambulance Bus 20 Patient Capacity.

Slides:



Advertisements
Similar presentations
72V - Recoil, Recoil IS, & Instinct New Vehicle Delivery Tips
Advertisements

Cubes in a Skeleton Cuboid
AMBULANCE OPERATIONS. Three types of ambulances Type I Type II Type III.
C250.
Classroom Safety. Fire & Life Requirements as per State Education Dept The following list relates to the classrooms and adjacent areas. They are provided.
B757 Review Questions.
Coach Air Conditioning
EMERGENCY MEDICAL MANAGEMENT OF RADIATION CAUSALTIES IN HOSPITAL Module XVII.
Rescue 177 Bungay Fire Brigade 12/2011. Rescue Light Rescue (Ford Expedition). R-177 has most of our EMS medial equipment. It also has numerous.
Computer Lab Safety Computer Essentials Drew Middle School Mrs. Evans Computer Essentials Drew Middle School Mrs. Evans.
Substation L1/ MCC L1 Update March 21 st, Current Location.
1.Cable management cover ( cpu only ) 2.Wired barcode scanner holder (optional) 3.Mouse holder and tray 4. Removable rear technology panel 5. Power cord.
Nissan LEAF L.David Roper
Basic Operations Irizar Bodies
Dennis Fire Appliances Operations & use. PTO Step 1 Move slide cover towards the drivers seat to lock out the gearbox Step 2 Select drive on the gear.
Complete Quiz You have 10 minutes to complete the quiz The Quiz is Open-Book (use it) Get help from your neighbor.
Montgomery County Fire Rescue Medical Care Support Unit 100 Patient Capacity.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
Moving and Positioning the Patient
Lifting and Moving Patients
Module A-2 Oxygen Therapy. Assembling Oxygen System Nasal Cannula Nonrebreather Mask.
Search and Rescue Trailer Bungay Fire Brigade 2013.
Medical Ambulance Bus Patient Loading. Inside Right of MAB looking forward.
Rosenbauer Helmet Storage
Introduction to Truck 3 Pierce 105’ Aerial
Air/Light Rehab 755. Spartin Big Easy chassis with 10” raised roof cab. Front axle Rear axle Cummins 330HP engine Body is 18’ air and light,
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
ET ,000 Gallons of Water GPM Pump.
GO ORDNANCE !!! ORDNANCECORPS 1 Antenna Mast Group We will now trace the electrical circuits of the antenna mast mast group. Be fore we get started you.
ACCELERATING THE FUTURE. 8” shorter 10” wider Edison 2 Very Light Car 4 passenger seating Compact suspension mounted completely within wheels Luggage.
Driver’s Side Exterior Compartment 1 Main Oxygen Extra D tank.
GATOR 70. Hand Holds Front Tire Pressure Rear Tire Pressure.
Next Home Remote Controlled Cliqueur troubleshooting guide Start the slide show then click Next.
Showing Demonstrations on the TV How to connect the camera to our TV set.
Chapter 36 Transport Operations.
1 Vehicle & Machinery Rescue. 2 On Scene Approach Survey scene –Six-sided approach –Inside / Outside Circles Scene conditions –Fire Fuels –Crowd control.
13th July 2006 Pasi Rantanen Log Stacker RTD1623.
Circuits & Electronics
Potential Difference (V) Charge flows from higher potential to lower potential until electric potential equilibrium is reached. When electric potential.
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
APPROVED TRAINING MANUAL’S LESSON PLANS AND COURSEWARE STAR MARIANAS AIR, INC. Recurrent – Flight Crew Part III – Aircraft Ground Training Section 2 –
Electricity. Electrical Force energex.com.au An object becomes charged by –Friction –Conduction –Induction.
Fire Station Project Does Augusta Really need a New Station?
Solar Powered Stop light The stop light consist of three main parts. The power source The Power converter/controller The stop light There are also a Remote.
Ambulance Operations. Ambulance Supplies and Equipments  Patient infection control, comfort and protection supplies  Initial and focused assessment.
Current Electricity and Electric Circuits
14.52 in Attach the Axle to the chassis using the four (4) bolts, washers, and nylon lock nuts. Mount the tires. Note: The wheel recess outside on the.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
2009 OFPC INSPECTION SUMMARY of VIOLATIONS We Need Your Help for the 2009 Inspection!
Mine Fresh Air Base.
1 Chapter 20 Review activity! Fun in B208!.  A. Unit of energy  B. Unit of charge  C. Unit of current  D. Unit of voltage. 2 What is a coulomb?
Power Distribution System General Location. Power Distribution The Main Switchboard is the hub of the electrical distribution system. Everything ties.
Booster Pump/ Compressor Procedures Rescue 31 Operator Instructions.
The study of electric charges in motion Electric Current.
DRIVER TRAINING POWER POINT. Upon the completion of the Cicero Fire Department Misc. # 1 Power Point Training the operators will be able to identify the.
DRIVER TRAINING POWER POINT. Upon the completion of the Cicero Fire Department Squad # 1 Power Point Training the operators will be able to identify the.
6: Lifting and Moving Patients. Cognitive Objectives (1 of 4) 1-6.1Define body mechanics Discuss the guidelines and safety precautions that need.
Montgomery County Fire Rescue Medical Ambulance Bus 20 Patient Capacity.
UH-60 IPC/MOI CW2 JAMES THOMAS.
3’ door 32 ‘ 14 ‘ 18 ‘ Rear ramp door 8’4” 3’ x 16’ slide out 3’ x 10’ slide out 3 ‘ 8 ‘ 12 ‘ FRONT Top View Dimensions.
The proposed trailer will have the capability to be pulled by a GSA pick-up and LMTV. The new trailer will also be wired with the proper type of electrical.
SYSTEMS AND CHECKS PRIOR TO DRIVING CHAPTER FOUR.
Electricity Friction
Central control unit for comfort system J393
Electrical Circuits Virginia Science Standard
Harwich Fire Department
Electric Potential.
Fire Safety Training 1.
9.1 Series and Parallel Circuits
Presentation transcript:

Montgomery County Fire Rescue Medical Ambulance Bus 20 Patient Capacity

Medical Ambulance Bus (MAB726)

Removable articulating ramp is stored under the bus bumper

Eight removable K Oxygen cylinders located on the right side. All 20 patient positions will flow oxygen at 15 LPM for 3 hours. Additionally a high pressure hose is provided to allow for an outside source of O2. When connected to the bus it will provide oxygen for an undetermined length of time.

50 Amp Shoreline Receptacle to power inside lights and AC/Heat. For use when remote power is available Emergency Door Opening Valve Battery Charger Receptacle Receptacle to power remote lighting. One at each corner.

Patient Compartment 20 removable stretchers with a weight Capacity of 350 lbs. each. All stretchers Have adjustable heads. Four large storage drawers All stretcher are on a slide out track that allows the stretcher to be easily removed. This will reduce the potential for injury while attempting to remove or load the stretcher. It locks in place with a T type pin.

Five attendant seats Three on Drivers side One on Officers side One at rear door that stores out of the way

Electric oxygen monitoring system located at desk behind driver Adjustable liter flow valves are located at Each stretcher position.

The attendants desk #1 is located behind the driver. Below are the drawers in the desk. There are multiple supply drawers, numbered from the front. Drawer # 2Drawer # 3

These drawers are located under the attendant seats. Drawer # 5Drawer # 4 Cabinet #6 is the tall skinny cabinet located next to the 3 attendant seats. Additional supplies are located here also. There are 5 attendants bags that have basic supplies, airways, bag valves and blood pressure cuffs.

12,500 KW Generator

Battery Switch above driver Remote Generator start switch 12,500 KW generator Located on drivers side