TEC Module Production Overview

Slides:



Advertisements
Similar presentations
1 Liverpool Production Status Week of 23 February 2007.
Advertisements

1 Liverpool Production Status Week of 02 March 2007.
23 July 2012 Thomas Bergauer (HEPHY Vienna) Belle II SVD Construction Database 12 th B2GM Bad Aibling.
Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
1 UCSB Module Assembly Week of 5/23-5/27. 2 FNAL & UCSB Inventory HybridsSensorsFrames FNALUCSBFNALUCSBFNALUCSB STHPKITSTHPKITSTHPKITSTHPKIT L12pu /
1 UCSB Module Assembly Week of 5/9-5/13. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
US Module Production Status Joe Incandela University of California Santa Barbara for the US CMS Silicon Tracker Group CERN Tracker Week July 2004.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
Status Brussels GANTRY Ê Overview of the pilot run (second week of October) 4 aims and achievements 4 accuracy on position and angles 4 residual features.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Status Brussels GANTRY Ê Recovered from the Gantry PC crash during Pilot Run R6 4 same situation as before the Pilot Run is achieved for R6 Ë Comparison.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
Brussels Module Production Ê We have producted 57 R6 modules and 26 R5N modules 4 of which 67 grade A and 9 grade B and 7 outside specifications Ë We have.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the.
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
Logistics 1 – To/Between Assembly Sites M.Friedl (HEPHY Vienna) 2 October 2014.
Status of PQC Florence, Strasbourg, Vienna
Misc. Topics Markus Friedl (HEPHY Vienna) 22 January 2015.
Status Brussels GANTRY
10/month is the present production rate 2 FTE + sporadic contributions
Status Brussels GANTRY
Hybrid & Module Testing Status
US Module Production Status
Hamburg Bonding Report
Results from module testing
Vienna Module Production
FNAL Module Testing Status
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
FNAL Module Testing Status
Module Production in Brussels
Hybrid Status/Deliveries
CMS Perugia Gantry Status Report
Sensor probing (Summary)
First UCSB TEC Module (Pictures)
L.Fiore Gantry Meeting during the CMS TK week
Module Production in Brussels
Module Testing Status Week of 6/14-6/20.
US Module Testing Progress Report
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Hybrid & Module Testing Status
TEC module quality overview
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
Hybrid & Module Testing Status
US Module Testing Progress Report
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Hybrid & Module Testing Status
Equipment Status ARCS equipment status DAQ equipment status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
IEKP - Universität Karlsruhe (TH)
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
TEC Ring 2 module prototypes J. Hrubec / Inst. für Hochenergiephysik
Presentation transcript:

TEC Module Production Overview Manfred Krammer HEPHY Vienna TEC Meeting, July 14, 2005

TEC Module Production Dashboard

Weekly Production Rates Production has ramped up to an average of 80 modules a week (assembly and bonding) compared to a theoretical possible maximum of 200.

Status TEC Production July 13 Total number of detector grade TEC modules available is 1368. In production (assembled but not yet finished) 153 modules Total need including spares is 6781 Percentage TEC modules available is 20.17 % Congratulation we have produced 1/5 of the TEC modules

Outlook July/August A large number of hybrids (~635) will become available soon (end of July). Delivery has already started: 218 in shipping to gantries (Lyon, UCSB) and FNAL - about 5 weeks after delivery to CERN! Be prepared to assemble and bond these hybrids during the holiday period. A further 336 hybrids are in production at CERN.

Outlook July/August Instructions for CERN hybrid assembly: Default: http://wwwhephy.oeaw.ac.at/p3w/cms_tracker/modprod_overview/HybShare.txt Default: For Batch 5 and 6: Exceptions from the default: All R7 from this batch to Lyon Higher priority for R5S hybrids 12 W6A modules in Brussels

Outlook July/August Expected workload of gantries in July/August For details on module types etc. look at TEC-Org.xls file or the module production web pages.

Alignment Modules Number of alignment modules to be produced in July/August (all numbers from TEC-Org.xls): 70 R4A in Lyon 36 R6A in Brussels Schedule sensor coating in JENA: 168 W4 already back in Karlsruhe 60 or 92 delivery July 15 90 delivery July 22 Sample tests (Rint) in Karlsruhe All sensors IV test in Vienna (Strasbourg) Sensors needed for the July/August production will be treated with high priority and should arrive in time in Lyon and Brussels.